Roof9p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Furnish and install new ductwork venting for pump room with dampers on the 7th floor as per plans. No change to use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Furnish and install plumbing for grease trap and hot water heater on the 7th floor as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Furnish and install new precipitator, KX and TX fans and associated ductwork and piping as per plans. No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 483p · 3 filings · 20 docs
Fire ProtectionPlumbing
REMOVE EXISTING FIRE HOSE RACKS AND INSTALL NEW FIRE HOSE CABINETS ON FLOORS 1,10, 20, 30, 40 and 48. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this job
4 documents · 1 drawing sheet
Modification to plumbing systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Modification to plumbing, sprinkler and standpipe systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
14 documents · 1 drawing sheet
Floor 47Under Construction26p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Installation, removal, and relocation of sprinkler heads to accommodate new architectural layout.
On file for this job
5 documents
New conference room, offices, and workstations
On file for this job
6 documents · 6 drawing sheets
Modification to the existing HVAC design to adaptively reuse the existing equipment and distribution for the new layout.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 467p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Modification of sprinkler heads as shown on plans. 44th floor: (1) head relocated 45th floor: (1) head relocated (2) heads removed, (2) new heads installed 46th floor: (5) heads replaced No change to use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Addition and removal of interior nonbearing partitions. New ceilings & finishes as per plans filed here within. No change in use, egress, or occupancy.
On file for this job
7 documents · 3 drawing sheets
Modification of ductwork in 45th floor pantries, relocated return grilles and thermostats on floors 44, 45, and 46, and rebalanced diffusers on floors 45 and 46. No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Floor 459p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Modification of sprinkler heads as shown on plans. 44th floor: (1) head relocated 45th floor: (1) head relocated (2) heads removed, (2) new heads installed 46th floor: (5) heads replaced No change to use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Addition and removal of interior nonbearing partitions. New ceilings & finishes as per plans filed here within. No change in use, egress, or occupancy.
On file for this job
7 documents · 2 drawing sheets
Modification of ductwork in 45th floor pantries, relocated return grilles and thermostats on floors 44, 45, and 46, and rebalanced diffusers on floors 45 and 46. No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 446p · 3 filings · 18 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Modification of sprinkler heads as shown on plans. 44th floor: (1) head relocated 45th floor: (1) head relocated (2) heads removed, (2) new heads installed 46th floor: (5) heads replaced No change to use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Modification of ductwork in 45th floor pantries, relocated return grilles and thermostats on floors 44, 45, and 46, and rebalanced diffusers on floors 45 and 46. No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
4 documents · 2 drawing sheets
Floor 43Under Construction40p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler work as shown on plans filed herewith.
On file for this job
18 documents · 3 drawing sheets
Application to add 23 new sprinkler heads and relocate 22 existing sprinkler heads. No change to use, egress, or occupancy herewith.
On file for this job
12 documents · 2 drawing sheets
Interior office renovation to change single tenant floor to multi-tenant floor. New demising wall, new 1-hr rated shared corridor, new private offices, & new huddle rooms.
On file for this job
7 documents · 8 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 423p · 1 filing · 4 docs
Architecture
ADDITION OF NEW INTERIOR NONBEARING PARTITION. NEW CEILING & FINISHES AS PER PLANS FILED HEREWITHIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this job
4 documents · 3 drawing sheets
Floor 413p · 1 filing · 4 docs
ArchitectureDM
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 41st Floor (Virtu Financial) as per plans. No change to use, egress or occupancy.
On file for this job
4 documents · 3 drawing sheets
Floor 401p · 1 filing · 4 docs
Structural
REMOVE EXISTING FIRE HOSE RACKS AND INSTALL NEW FIRE HOSE CABINETS ON FLOORS 1,10, 20, 30, 40 and 48. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this job
4 documents · 1 drawing sheet
Floor 39Under Construction12p · 4 filings · 15 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of existing plumbing fixtures and associated piping on the 39th floor (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Removal of existing sprinkler system with installation of a temporary loop on the 39th floor (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Removal and disposal of interior partitions, doors, ceilings and finishes on the 39th floor (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 38Under Construction40p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modification to existing plumbing, sprinkler, standpipe fixtures as per plans filed. No change in use, egress or occupancy.
On file for this job
8 documents · 2 drawing sheets
Removal and renovation of non-load bearing partitions. No change in use, egress or occupancy
On file for this job
6 documents · 6 drawing sheets
Modification and removal of existing HVAC and ductwork systems. No change in use, egress or occupancy.
On file for this job
9 documents · 2 drawing sheets
Floor 37Under Construction38p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modification to existing plumbing, sprinkler, standpipe fixtures as per plans filed. No change in use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Removal and renovation of non-load bearing partitions. No change in use, egress or occupancy
On file for this job
6 documents · 6 drawing sheets
Modification and removal of existing HVAC and ductwork systems. No change in use, egress or occupancy.
On file for this job
9 documents · 1 drawing sheet
Floor 36
Floor 35
Floor 34
Floor 338p · 3 filings · 18 docs
ArchitectureDMFire Protection
Minor interior demolition. Installation of 60' of new interior partitions, modify existing ceilings, patch carpet, new base on new walls, rework existing raised floor and ramps, new IOC doors only on the 33rd Floor as per plans (Morgan Stanley.)
On file for this job
6 documents · 5 drawing sheets
Modifications to the existing Sprinkler System: Install (2) new sprinkler heads and Relocate (4) existing sprinkler heads and associated piping on the 33rd Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Removal of office fronts, walls, ceiling and finishes; Installation of new partitions, limited office fronts, suspended ceilings, lighting and finishes as per plans (Tenant Work/ Morgan Stanley.) No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Floor 324p · 3 filings · 16 docs
Fire ProtectionMechanicalPlumbing
Removal of existing plumbing fixtures and associated piping on the 32nd floor (LL- Demo & Whitebox) as per plans. No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
HVAC removals on the 32nd floor (LL- Demo & Whitebox) as per plans. No change to use, egress or occupancy.
On file for this job
5 documents · 3 drawing sheets
Removal of existing sprinkler system with installation of a temporary loop on the 32nd floor (LL- Demo & Whitebox) as per plans. No change to use, egress or occupancy.
On file for this job
7 documents · 2 drawing sheets
Floor 31
Floor 304p · 1 filing · 8 docs
ArchitectureDM
Minor interior demolition. Installation of new interior partitions ,doors, suspended ceilings, flooring and finishes on the 29th & 30th Floors as per plans (Morgan Stanley - Office Renovations.) No change to use, egress or occupancy.
On file for this job
8 documents · 4 drawing sheets
Floor 295p · 3 filings · 20 docs
ArchitecturePlumbing
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 27th Floor as per plans (Morgan Stanley - Renovations.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions ,doors, suspended ceilings, flooring and finishes on the 29th & 30th Floors as per plans (Morgan Stanley - Office Renovations.) No change to use, egress or occupancy.
On file for this job
8 documents · 4 drawing sheets
Install one (1) new sink and (1) new eemax electric tankless hot water heater and associated CW/sanitary piping on the 29th Floor as per plans (Morgan Stanley - Office Renovations.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Floor 28Under Construction8p · 3 filings · 13 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Plumbing fixture cap and removal and sprinkler head demolition and installation of temp sprinkler heads as per plans filed herewith. No change in use, egress, occupancy
On file for this job
3 documents
Interior demolition of 28th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
4 documents
Demolition and removal of ductwork as per plans filed herewith. No change in use, egress, occupancy.
On file for this job
6 documents
Floor 276p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Modifications to the existing HVAC system: Removal of existing ductwork and relocation of diffusers; Installation of new ductwork, diffusers, return grills and controls on the 27th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy
On file for this job
6 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 27th Floor as per plans (Morgan Stanley - Renovations.) No change to use, egress or occupancy.
On file for this job
6 documents · 3 drawing sheets
Installation of new plumbing fixtures: (1) EEMAX Electric Tankless hot water heater, (1) sink and associated CW/sanitary piping on the 27th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 265p · 1 filing · 6 docs
ArchitectureDMGeneral
Minor interior demolition. Installation of new partitions, doors, suspended ceilings, flooring and finishes for layout modifications on the 26th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this job
6 documents · 5 drawing sheets
Floor 25Under Construction40p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Installation, removal, and relocation of sprinkler heads to accommodate new architectural layout.
On file for this job
3 documents · 1 drawing sheet
New conference room, offices, and workstations
On file for this job
6 documents · 5 drawing sheets
Modification to the existing HVAC design to adaptively reuse the existing equipment and distribution for the new layout.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 244p · 2 filings · 8 docs
ArchitectureElectricalMechanical
Removal and installation of existing mechanical systems. No change to egress, use or occupancy.
On file for this job
4 documents · 1 drawing sheet
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
4 documents · 3 drawing sheets
Floor 232p · 1 filing · 4 docs
Architecture
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
4 documents · 2 drawing sheets
Floor 22Under Construction48p · 14 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation of new partitions, doors, ceilings and finishes on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 4 drawing sheets
Installation of a new HVAC system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 8 drawing sheets
Removal of existing plumbing fixtures and associated piping on the 22nd floor as per plans. No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 211p · 1 filing · 5 docs
Fire Protection
Modification to sprinkler system as per plans filed herewith.
On file for this job
5 documents · 1 drawing sheet
Floor 202p · 2 filings · 10 docs
PlumbingStructural
REMOVE EXISTING FIRE HOSE RACKS AND INSTALL NEW FIRE HOSE CABINETS ON FLOORS 1,10, 20, 30, 40 and 48. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this job
4 documents · 1 drawing sheet
Install one (1) new sink and (1) new eemax electric tankless hot water heater and associated CW/sanitary piping on the 29th Floor as per plans (Morgan Stanley - Office Renovations.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Floor 191p · 1 filing · 3 docs
Structural
Structural modifications on the 18th floor as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Floor 1824p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Installation of a new HVAC system on the 18th floor as per plans. No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Modifications to the 18th floor terrace as per plans. No change to use, egress or occupancy.
On file for this job
17 documents · 3 drawing sheets
Installation of a new sprinkler system on the 18th floor as per plans. No change to use, egress or occupancy.
On file for this job
12 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 17Under Construction10p · 5 filings · 19 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Removal of interior non-load bearing partitions, doors and millwork. No change to use, egress or occupancy
On file for this job
3 documents · 1 drawing sheet
Infill of stair opening on 14th and 15th Floors, and removal of interior convenience stair between 13th and 15th Floors
On file for this job
5 documents
Demolition of existing mechanical equipment associated controls, ductwork and piping
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 16Under Construction22p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Installation of new interior finishes, lighting, glass guardrail at perimeter curtain wall.
On file for this job
6 documents · 4 drawing sheets
Reinforcement of existing 16th Floor construction for floor finish, new interior partition walls, etc.
On file for this job
5 documents
Heating/cooling and ventilation for the new perimeter area. Outdoor radiant heating for the new terrace area.
On file for this job
6 documents
Latest 3 of 8 filings on this floor.
Floor 15Under Construction10p · 5 filings · 19 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Removal of interior non-load bearing partitions, doors and millwork. No change to use, egress or occupancy
On file for this job
3 documents · 1 drawing sheet
Infill of stair opening on 14th and 15th Floors, and removal of interior convenience stair between 13th and 15th Floors
On file for this job
5 documents
Demolition of existing mechanical equipment associated controls, ductwork and piping
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 14Under Construction11p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Removal of interior non-load bearing partitions, doors and millwork. No change to use, egress or occupancy
On file for this job
3 documents · 1 drawing sheet
Infill of stair opening on 14th and 15th Floors, and removal of interior convenience stair between 13th and 15th Floors
On file for this job
5 documents
Demolition of existing mechanical equipment associated controls, ductwork and piping
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 13Under Construction11p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Removal of interior non-load bearing partitions, doors and millwork. No change to use, egress or occupancy
On file for this job
3 documents · 1 drawing sheet
Infill of stair opening on 14th and 15th Floors, and removal of interior convenience stair between 13th and 15th Floors
On file for this job
5 documents
Demolition of existing mechanical equipment associated controls, ductwork and piping
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 123p · 2 filings · 12 docs
Fire ProtectionMechanical
FILING TO REMOVE MECHANICAL EQUIPMENT & PIPING AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 1 drawing sheet
MODIFICATION OF EXISTING SPRINKLER SYSTEM & INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM. TIE INTO EXISTING STANDPIPE SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this job
7 documents · 2 drawing sheets
Floor 114p · 2 filings · 9 docs
ArchitectureFire ProtectionMechanical
Alterations to sprinkler system as per plans. No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Modification of existing mechanical ductwork, air diffusers and thermostats of new ductwork. No change to use, egress or occupancy.
On file for this job
5 documents · 2 drawing sheets
Floor 10
Floor 9
Floor 8
Floor 7
Floor 610p · 4 filings · 20 docs
DMFire ProtectionGeneralMechanicalPlumbingStructural
Stair infill framing & metal deck as per plans. No change to use, egress or occupancy.
On file for this job
26 documents · 6 drawing sheets
Mechanical demolition of ceiling units on floors 5 & 6
On file for this job
3 documents · 2 drawing sheets
Modification to existing Structural system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
16 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 555p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Furnish and install plumbing for grease trap and hot water heater on the 7th floor as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Installation of new sprinkler heads in pump room on the 7th floor as per plans. No change to use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Stair infill framing & metal deck as per plans. No change to use, egress or occupancy.
On file for this job
26 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4Under Construction15p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Infill of stair opening on 14th and 15th Floors, and removal of interior convenience stair between 13th and 15th Floors
On file for this job
5 documents · 1 drawing sheet
Removal and renovation of non-load bearing partition and interiors. No change in use, egress or occupanct.
On file for this job
6 documents · 5 drawing sheets
Modification to HVAC systems. No change in use, egress or occupancy.
On file for this job
6 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 3Under Construction13p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Mechanical demo on 2nd and 3rd floor as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
6 documents
DEMO OF METAL STAIR FROM 2ND TO 3RD FLOOR AND MEZZANINE SLAB AND STEAL BEAMS AT INTERMEDIATE LEVEL BETWEEN 2ND AND 3RD FLOOR. INFILL OF SLAB OPENINGS ON 2ND AND 3RD FLOOR WITH NEW SLAB SUPPORTED BY STEEL BEAMS. NO CHANGE TO USE,EGRESS,OCCUPANCY
On file for this job
5 documents
Removal of plumbing and sprinkler fixtures and installation of temporary sprinkler heads. No change in use, egress, or occupancy
On file for this job
3 documents
Latest 3 of 7 filings on this floor.
Floor 2Under Construction66p · 13 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modify existing ductwork for new lobby footprint, provide heating within vestibules and lobby, refurbishment of existing air handler, and installation of new air handler and unit heater to serve lobby space.
On file for this job
6 documents
Design of the steel canopy framing system, including connection details for attaching the canopy and curtain wall supports to the existing building's structural steel.
On file for this job
3 documents · 1 drawing sheet
Existing sprinkler heads in lobby area to be replaced and relocated. New sprinkler heads added in lobby expansion. Plumbing work to include outdoor canopy upgrade & storm drainage.
On file for this job
4 documents
Latest 3 of 8 filings on this floor.
Floor 112p · 23 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Demo and removal of concrete slab with installation of new structural beams beneath slab, restoration of existing and pouring new concrete on the 1st floor (Loading Dock) as per plans. No change to use, egress or occupancy.
On file for this job
10 documents
Furnish and install (2) new hot water coil units, associated duct and piping. Furnish and install (2) new steam-to-water instantaneous domestic water heaters, recirculating pumps and accessories. Remove and replace (26) hot water reheat coils and 40 contr
On file for this job
5 documents · 1 drawing sheet
Removal of existing plumbing fixtures and associated piping on the 1st floor (TD Bank Demo) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine10p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Modifications to the existing plumbing system (La Pecora Bianca) as per plans. No change to use, egress or occupancy.
On file for this job
15 documents · 4 drawing sheets
Creation of dog house/pump room on the 7th floor as per plans. No change to use, egress or occupancy.
On file for this job
9 documents · 1 drawing sheet
Furnish and install new ductwork venting for pump room with dampers on the 7th floor as per plans. No change to use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Cellar13p · 20 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction
Plumbing work associated with fit-out for a new restaurant in an existing below grade shell space. Installation of new plumbing and gas fixtures. No change in use, egress or occupancy under this application.
On file for this job
9 documents · 4 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the cellar and 18th floors as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Installation of a new HVAC system on the 18th floor as per plans. No change to use, egress or occupancy.
On file for this job
4 documents · 10 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction13p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Structural
Job M01446483Permit Issued · 09/29/2026
Minor demolition with installation of new rated walls and door for creation of ATS room in the sub-cellar 1 as per plans. No change to use, egress or occupancy.
Install temporary shoring to support deteriorated sections of the reinforced concrete slab.
On file for this job
2 documents
Modifications to the existing HVAC system (La Pecora Bianca) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Basement1p · 1 filing · 16 docs
Mechanical
Modification to existing Structural system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
16 documents · 1 drawing sheet