← Back
STATEN ISLAND
1631 RICHMOND AVENUE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5175438
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof47p · 4 filings · 20 docs
Floor 451p · 4 filings · 20 docs
Floor 349p · 4 filings · 20 docs
Floor 249p · 4 filings · 20 docs
Floor 152p · 5 filings · 20 docs
Cellar60p · 6 filings · 20 docs
Site & exterior11p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KEL-MAR DESIGNS603/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING3003/21/2026
RIGHT WAY SERVICES NYC2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEL-MAR DESIGNS INCGeneral Contractor807/08/2026
FIVE BOROUGH NYC LLCFire Protection407/08/2026
GBL MECHANICAL INCPlumbing307/08/2026
ALJER PLBG & HTG CORPPlumbing107/08/2026
S & J INDUSTRIAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT16882007/06/2023
WB ENGINEERING533106/07/2022
RICHMOND TESTING LAB263106/03/2022
Building Lifecycle
All (163)Filed (25)Permit Issued (14)Signed Off (8)Violation (8)Inspection (12)Objection (66)Special Inspection (30)
04/02/2025
Violation issued (FDNY_ORDER, closed)
04/01/2025
Violation issued (FDNY_NOV, closed)
09/26/2023
Signed off — Alteration
Plumbing and Sprinkler with NB
S00469005-I1
08/22/2023
Signed off — Alteration
Mechanical Systems [MS] Heating and Air Conditioning Systems inconjuncion with New Building
S00518363-I1
07/27/2023
Signed off — Alteration
S00746778-I1
07/27/2023
Signed off — Alteration
Temporary use / operation of four (4) self-contained preinstalled HVAC units servicing heating and cooling needs of prefabricated TEMPORAY educational building which contains preinstalled ductwork. ***See Comments for important additional data ***
S00746783-I1
07/26/2023
Signed off — Alteration
S00746765-I1
07/13/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBASTIAN SETTEDUCATE JR., P.E
07/13/2023
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
07/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/06/2023
Filed — Alteration
Plumbing and Sprinkler with NB
S00469005-P6
07/05/2023
Filed — Alteration
Mechanical Systems [MS] Heating and Air Conditioning Systems inconjuncion with New Building
S00518363-P3
06/21/2023
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
06/21/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBASTIAN SETTEDUCATE JR., P.E
06/12/2023
Signed off — Alteration
Structural work in conjunction with NB
S00435136-I1
06/05/2023
Special inspection requirement — Structural Cold-Formed Steel
SEBASTIAN SETTEDUCATE JR., P.E
06/05/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SEBASTIAN SETTEDUCATE JR., P.E
06/05/2023
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
06/05/2023
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
06/05/2023
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
06/05/2023
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
06/05/2023
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
06/05/2023
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
06/05/2023
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
05/16/2023
Filed — Alteration
Structural work in conjunction with NB
S00435136-P2
05/16/2023
Signed off — Alteration
Boiler in conjunction with NB
S00517308-I1
05/15/2023
Special inspection requirement — Structural Cold-Formed Steel
SEBASTIAN SETTEDUCATE JR., P.E
05/15/2023
Special inspection requirement — Structural Steel - Details
SEBASTIAN SETTEDUCATE JR., P.E
05/15/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SEBASTIAN SETTEDUCATE JR., P.E
05/15/2023
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
05/15/2023
Special inspection requirement — Concrete - Cast-In-Place
SEBASTIAN SETTEDUCATE JR., P.E
05/15/2023
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
05/15/2023
Special inspection requirement — Structural Steel - Welding
SEBASTIAN SETTEDUCATE JR., P.E
05/15/2023
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
05/15/2023
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
05/09/2023
Signed off — Alteration
Boiler in Conjunction with NB
S00517351-I1
05/08/2023
Filed — Alteration
Mechanical Systems [MS] Heating and Air Conditioning Systems inconjuncion with New Building
S00518363-P2
05/07/2023
Filed — Alteration
Plumbing and Sprinkler with NB
S00469005-P5
05/05/2023
Permit issued — Mechanical Systems
S00518363-I1-MS
05/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2023
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2023
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2023
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2023
Special inspection requirement — Ventilation and air distribution system
SEBASTIAN SETTEDUCATE JR., P.E
05/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2023
Filed — Alteration
Boiler in Conjunction with NB
S00517351-P3
03/21/2023
Filed — Alteration
Plumbing and Sprinkler with NB
S00469005-P4
03/21/2023
Filed — Alteration
Structural work in conjunction with NB
S00435136-P1
03/20/2023
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
03/10/2023
Filed — Alteration
Boiler in Conjunction with NB
S00517351-P2
03/08/2023
Filed — Alteration
Boiler in conjunction with NB
S00517308-P1
02/27/2023
Filed — Alteration
Plumbing and Sprinkler with NB
S00469005-P3
02/24/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/24/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/24/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/21/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKEL-MAR DESIGNS INC05/05/2023
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC01/26/2023
DOB NOWPlumbingSigned-offFIVE BOROUGH NYC LLC01/11/2023
DOB NOWStandpipeSigned-offFIVE BOROUGH NYC LLC01/11/2023
DOB NOWBoiler EquipmentSigned-offS & J INDUSTRIAL CORP11/16/2022
DOB NOWStructuralSigned-offKEL-MAR DESIGNS INC11/15/2022
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC10/04/2022
DOB NOWGeneral ConstructionSigned-offKEL-MAR DESIGNS INC09/30/2022
DOB NOWMechanical SystemsSigned-offKEL-MAR DESIGNS INC09/28/2022
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC06/15/2022
DOB NOWMechanical SystemsSigned-offKEL-MAR DESIGNS INC05/05/2022
DOB NOWBoiler EquipmentSigned-offALJER PLBG & HTG CORP03/28/2022
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC02/10/2022
DOB NOWStandpipeSigned-offFIVE BOROUGH NYC LLC02/10/2022
BIS—ISSUEDKEL-MAR DESIGNS INC06/27/2023
BIS—ISSUEDKEL-MAR DESIGNS INC04/11/2023
BIS—ISSUEDKEL-MAR DESIGNS INC05/05/2022
BIS—ISSUEDKEL-MAR DESIGNS INC11/29/2021
BIS—ISSUEDKEL-MAR DESIGNS INC11/29/2021
BIS—ISSUEDKEL-MAR DESIGNS INC09/03/2021
BIS—ISSUEDKEL-MAR DESIGNS INC09/03/2021
BIS—ISSUEDKEL-MAR DESIGNS INC07/23/2021
BIS—ISSUEDKEL-MAR DESIGNS INC07/23/2021
BIS—ISSUEDKEL-MAR INTERIORS INC07/20/2021
BIS—ISSUEDKEL-MAR INTERIORS INC07/20/2021
1 project · most recent 04/11/2022
FiledStatusContractorScope
04/11/2022CompleteTUXEDO ELEC'L CONTR'G INC—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2023Pass-Final SD - Fire PumpPassView ↗
02/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/24/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/21/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/07/2022Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
10/25/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/20/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
07/13/2023Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
07/13/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBASTIAN SETTEDUCATE JR., P.Especial
06/21/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBASTIAN SETTEDUCATE JR., P.Especial
06/21/2023Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
06/05/2023FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/05/2023Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/05/2023Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
06/05/2023Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
06/05/2023Structural Cold-Formed SteelSEBASTIAN SETTEDUCATE JR., P.Especial
06/05/2023Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
06/05/2023Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
06/05/2023Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
06/05/2023MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
05/15/2023Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/15/2023Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
05/15/2023Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
05/15/2023Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
05/15/2023Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
05/15/2023Structural Cold-Formed SteelSEBASTIAN SETTEDUCATE JR., P.Especial
05/15/2023Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
05/15/2023MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
05/15/2023FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/05/2023HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/05/2023HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/05/2023Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 71.
▾Documents — 309 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch13
08/25/2026S00517308-P1Request digital key ↗
08/24/2026S00746765-I1Request digital key ↗
08/24/2026S00746778-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
08/23/2026S00469005-P2Request digital key ↗
08/23/2026S00469005-P5Request digital key ↗
08/23/2026S00469005-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
08/23/2026S00469005-P6Request digital key ↗
08/23/2026S00469005-P5Request digital key ↗
08/23/2026S00469005-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Structural3
08/25/2026S00435136-P2Request digital key ↗
08/25/2026S00435136-P1Request digital key ↗
08/25/2026S00435136-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/15/2026S08046276-I1Request digital key ↗
08/15/2026S08046279-I1Request digital key ↗
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION22
08/29/2025510115803Open ↗
07/25/2025510115803Open ↗
06/26/2025540244047Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION11
11/29/2021510115803Open ↗
11/29/2021510115803Open ↗
09/03/2021510115803Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
01/29/2024540244047Open ↗
01/29/2024540244047Open ↗
01/13/2023540197035Open ↗
▸BISOPEN APPLICATIONS SEARCH2
07/08/2025510115803Open ↗
07/08/2025510115803Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
01/26/2024540244047Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
05/05/2022510115803Open ↗
03/31/2022510115803Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/25/2021510115803Open ↗
▸BISVERIFY TAX LOT1
05/02/2023510115803Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/08/2025510115803Open ↗
▸BISZONING CHALLENGE1
05/05/2022510115803Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/25/2021510115803Open ↗
▸Seals & Professional Certifications69
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/25/2026S00435136-P2Open ↗
08/25/2026S00435136-P1Open ↗
08/25/2026S00435136-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/27/2026S00469005-I1Open ↗
09/27/2026S00469005-I1Open ↗
09/23/2026S00517351-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026S00517351-I1Open ↗
09/02/2026S00435136-P1Open ↗
09/02/2026S00435136-P1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/19/2023540244047Open ↗
02/23/2021540197035Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
01/19/2023540244047Open ↗
02/23/2021540197035Open ↗
▸Trade Schedules & Equipment12
▸DOB NOWFDNY: Letter of No Objection7
08/13/2026S00469005-P6Open ↗
08/13/2026S00469005-P2Open ↗
08/13/2026S00469005-I1Open ↗
Showing 3 of 7 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
07/07/2025510115803Open ↗
06/23/2025510115803Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/25/2023510115803Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
07/07/2025510115803Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/03/2023510115803Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
12/13/2024540244047Open ↗
06/25/2021510115803Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREE1
07/07/2025510115803Open ↗
▸BISSTREET TREE SIGNOFF1
07/08/2025510115803Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/06/2023510115803Open ↗
07/09/2021510115803Open ↗
06/25/2021510115803Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00517351-I1Open ↗
08/13/2026S00518363-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/25/2023510115803Open ↗
▸BISFENESTRATION AREAS1
01/25/2023510115803Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
01/25/2023510115803Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/25/2023510115803Open ↗
▸BISELECTRIC MOTORS1
04/25/2023510115803Open ↗
▸BISLIGHTING CONTROLS1
11/21/2023510115803Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00517351-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/23/2021510115803Open ↗
11/23/2021510115803Open ↗
07/16/2021510115803Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/01/2022510115803Open ↗
07/15/2021510115803Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
02/15/2023540244047Open ↗
08/11/2021540197035Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/06/2023510115803Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/02/2023510115803Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/04/2023510115803Open ↗
▸BISCONCRETE DELIVERY TICKET1
12/13/2024540244047Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
08/24/2026S00746765-I1Open ↗
08/24/2026S00746778-I1Open ↗
08/23/2026S00518363-P1Open ↗
Showing 3 of 25 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/01/2023510115803Open ↗
03/28/2023510115803Open ↗
03/27/2023510115803Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/31/2022510115803Open ↗
07/23/2021510115803Open ↗
04/23/2021510115803Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
01/29/2024540244047Open ↗
01/13/2023540197035Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL2
01/19/2023540244047Open ↗
02/23/2021540197035Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/23/2021510115803Open ↗
07/15/2021510115803Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION10
08/28/2025510115803Open ↗
01/26/2024540244047Open ↗
01/26/2024540244047Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
11/29/2021510115803Open ↗
09/03/2021510115803Open ↗
07/23/2021510115803Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
12/16/2020510115803Open ↗
12/16/2020510115803Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
01/19/2023540244047Open ↗
02/23/2021540197035Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026S00435136-P1Open ↗
▸Other Documents33
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
07/07/2025510115803Open ↗
07/07/2025510115803Open ↗
07/07/2025510115803Open ↗
Showing 3 of 9 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION7
12/13/2024540244047Open ↗
02/15/2023540244047Open ↗
01/19/2023540244047Open ↗
Showing 3 of 7 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
01/26/2024540244047Open ↗
08/11/2021540197035Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP2
01/19/2023540244047Open ↗
02/23/2021540197035Open ↗
▸BISLAA - Supporting Documentation1
09/03/2021510115803Open ↗
▸BISMETERING1
04/28/2023510115803Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
01/24/2024540244047Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
06/02/2023510115803Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/26/2024540244047Open ↗
▸BISVESTIBULES1
04/25/2023510115803Open ↗
▸BISMAINTENANCE INFORMATION1
11/21/2023510115803Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
11/21/2023510115803Open ↗
▸BISWAIVER OF LEGAL GRADE1
01/22/2025540244047Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
01/26/2024540244047Open ↗
▸BISVIOLATIONS SEARCH1
07/08/2025510115803Open ↗
▸BISDOB NOW REVIEW COMPLETE1
07/08/2025510115803Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/25/2023510115803Open ↗