Elevator apt, fireproof without stores
Bronx River (NYCHA)
1609 EAST 174 STREET · Soundview-Bruckner-Bronx River · BIN 2092902
💬 Discuss this project
1952Year Built
14Stories
D3Building Class
R6Zoning
1,214,370 sfGross Floor Area
1,251Units
LL97 Covered25 Open Violations 10 unresolved · 15 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 570,383 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivil
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 5 docs
CellarUnder Construction39p · 1 filing · 20 docs
Site & exteriorUnder Construction16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3807/08/2026
NYC Housing Authority1306/02/2026
NEELAM CONSTRUCTION403/21/2026
SKYWORX CONTRACTING203/21/2026
NEW YORK CITY HOUSING AUTHORITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT BEE, RA309/05/2025
H2M ARCHITECTS AND ENGINEERS708/15/2025
JOEL PHAGOO P.E. PLLC305/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY WIDE EXPEDITING2003/21/2026
JOEL PHAGOO P.E. PLLC303/21/2026
JOEL PHAGOO P E303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZORIA HOUSING, LLCGeneral Contractor1107/08/2026
VIKRANT CONTRACTING & BUILDERGeneral Contractor707/08/2026
DYNAMIC US, INCGeneral Contractor604/09/2026
TRISTATE PLBG SVCS CORPPlumbing506/28/2026
Q.Y. ELECTRIC, INCElectrical203/22/2026
M&L SIGNS INCElectrical103/21/2026
ANZELM KRYSAElectrical103/21/2026
SIEGEL, SElectrical103/21/2026
STEPHENS, KENNETHElectrical103/21/2026
LOCAL 40 IRON WORKERS UNIElectrical103/21/2026
LADIKOS, DIMITRIOSElectrical103/21/2026
HERNANDEZ, LElectrical103/21/2026
EVANS, DWAYNEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061009/05/2025
Building Lifecycle
All (101)Filed (13)Permit Issued (18)Signed Off (3)Facade (FISP) (15)Violation (16)Inspection (6)Special Inspection (30)
05/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/20/2026
Permit issued — Boiler Equipment
X00648337-S3-BE
04/14/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/02/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/24/2026
Permit issued — Plumbing
X00648337-S2-PL
12/29/2025
Permit issued — General Construction
X00648337-I1-GC
12/29/2025
Permit issued — Mechanical Systems
X00648337-S1-MS
09/05/2025
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-P6
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
09/03/2025
Special inspection requirement — Sprayed fire-resistant materials
GEORGE GHEBRYAL
09/03/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
09/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
09/03/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
09/03/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/15/2025
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-S3
08/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
05/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
04/29/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
04/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/29/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
04/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
04/24/2025
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-P5
04/24/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — Shutoff dampers
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — Chimneys and vents
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
04/23/2025
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-P4
04/02/2025
Special inspection requirement — Post-installed Anchors
04/02/2025
Special inspection requirement — Post-installed Anchors
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
01/28/2025
Permit issued — General Construction
X00648337-I1-GC
01/28/2025
Permit issued — Mechanical Systems
X00648337-S1-MS
01/15/2025
Permit issued — Plumbing
X00648337-S2-PL
01/06/2025
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-P3
01/06/2025
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-P1
01/03/2025
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-P2
12/30/2024
Violation issued (FDNY_NOV, closed)
03/30/2022
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-S1
03/24/2022
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-S2
02/04/2022
Filed — Alteration
General Construction work associated with Boiler Upgrade.
X00648337-I1
08/18/2021
Cycle 9 facade report signed — SWARMP
07/30/2021
Cycle 9 facade report submitted
06/01/2021
Cycle 9 facade inspection completed
12/18/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00096408-I1
12/18/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00096410-I1
10/08/2020
Signed off — Alteration
X00172884-I1
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedTRISTATE PLBG SVCS CORP04/20/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP01/24/2026
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC12/29/2025
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC12/29/2025
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC01/28/2025
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC01/28/2025
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP01/15/2025
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI10/05/2020
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC11/07/2019
DOB NOWSupported ScaffoldSigned-offZORIA HOUSING, LLC11/07/2019
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI09/10/2019
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI07/01/2019
DOB NOWSupported ScaffoldSigned-offZORIA HOUSING, LLC05/30/2019
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC04/19/2019
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI03/12/2019
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC11/15/2018
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC11/08/2018
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI11/08/2018
BISOTISSUEDZORIA HOUSING, LLC07/02/2020
BISOTISSUEDZORIA HOUSING, LLC01/10/2020
BISOTISSUEDZORIA HOUSING, LLC05/28/2019
BISEQISSUEDNEELAM CONSTRUCTION CORP10/04/2017
BISEQISSUEDSKYWORX CONTRACTING INC10/04/2017
BISEQISSUEDSKYWORX CONTRACTING INC10/11/2016
BISEQISSUEDNEELAM CONSTRUCTION CORP10/04/2016
BISOTISSUEDROMA SCAFFOLDING INC02/11/2015
BISOTISSUEDROMA SCAFFOLDING INC01/30/2015
BISEQISSUEDROMA SCAFFOLDING INC12/31/2014
BISEQISSUEDROMA SCAFFOLDING INC12/22/2014
BISPLISSUEDDYNAMIC CONTRACTING CORP06/21/2010
BISEQISSUEDTECHNICO CONSTRUCTION04/05/2005
BISEQISSUEDTECHNICO CONSTRUCTION01/13/2005
BISEQISSUEDTECHNICO CONSTRUCTION04/19/2004
BISEQISSUEDDAFFODIL GENERAL CONTRACTING02/02/2004
BISEQISSUEDTECHNICO CONSTRUCTION01/13/2004
BISPLISSUEDPYTHAGORAS GEN CONTRACTING CORP07/07/1999
BISOTISSUEDPYTHAGORAS GENERAL CONTRACTING06/24/1999
BISPLISSUEDNEW YORK STANDARD MECH CORP02/18/1998
BISOTISSUEDHEALTH & HOSPITAL CORP.10/31/1997
BISMHISSUEDHEALTH & HOSPITAL CORP.10/31/1997
+ 5 more permits on file
1 project · most recent 09/05/2025
Others
FiledStatusContractorScopeMake / Model / Capacity
09/05/2025Permit IssuedDYNAMIC US, INCOthers
Other
Arrow EA64 1 CFM ×3
1 project · most recent 09/05/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/05/2025Permit IssuedTRISTATE PLBG SVCS CORPGas, Water/Sanitary
3 projects · most recent 01/09/2025
General Wiring
FiledStatusContractorScope
01/09/2025Permit IssuedDYNAMIC ELEC. SYSTEM INCGeneral Wiring
03/08/2019CompleteQ.Y. ELECTRIC, INC—
11/02/2018CompleteQ.Y. ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/14/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2026Pass-Final PL - UndergroundPassView ↗
05/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
09/03/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/03/2025Sprayed fire-resistant materialsGEORGE GHEBRYALspecial
09/03/2025FinalGEORGE GHEBRYALprogress
09/03/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
09/03/2025MasonryGEORGE GHEBRYALspecial
09/03/2025Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/08/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
07/30/2025Heating SystemsGEORGE GHEBRYALspecial
04/29/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
04/29/2025Maintenance informationGEORGE GHEBRYALenergy_progress
04/29/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
04/29/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/29/2025Post-installed AnchorsGEORGE GHEBRYALspecial
04/29/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
04/29/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
04/24/2025FinalGEORGE GHEBRYALprogress
04/24/2025Maintenance informationGEORGE GHEBRYALenergy_progress
04/24/2025Shutoff dampersGEORGE GHEBRYALenergy_progress
04/24/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
04/24/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
04/24/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
04/24/2025Post-installed AnchorsGEORGE GHEBRYALspecial
04/24/2025Heating SystemsGEORGE GHEBRYALspecial
04/24/2025Mechanical SystemsGEORGE GHEBRYALspecial
04/24/2025Chimneys and ventsGEORGE GHEBRYALspecial
Latest 25 of 55.
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
08/26/2026X00096410-I1Request digital key ↗
08/26/2026X00096408-I1Request digital key ↗
08/19/2026X00648337-P4Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00172884-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION13
04/16/2021240269428Open ↗
09/15/2020240235946Open ↗
02/21/2020240269428Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION12
07/02/2020240269428Open ↗
05/28/2019240235946Open ↗
10/10/2017240158707Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications70
▸DOB NOWProgress Inspector Seal & Signature14
09/29/2026X00648337-P5Open ↗
09/29/2026X00648337-P5Open ↗
09/01/2026X00648337-P6Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026X00096410-I1Open ↗
08/26/2026X00096408-I1Open ↗
08/26/2026X00172884-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
10/06/2016240159109Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/29/2026X00648337-P5Open ↗
09/01/2026X00648337-P6Open ↗
08/30/2026X00648337-S1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
10/06/2016240159109Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
10/06/2016240159109Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/28/2016240085867Open ↗
06/14/2016240084957Open ↗
06/14/2016240085778Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/28/2016240085867Open ↗
06/14/2016240084957Open ↗
06/14/2016240085778Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/03/2010220046778Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
09/14/2018240235946Open ↗
02/03/2010220046778Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES4
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
10/06/2016240159109Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026X00172884-I1Open ↗
08/13/2026X00648337-S2Open ↗
08/13/2026X00648337-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0489BX201
04/06/2021240269428Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/17/2015240085867Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/04/2010220046778Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0574BX191
12/18/2020240235946Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
04/06/2021240269428Open ↗
12/18/2020240235946Open ↗
02/21/2020240269428Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
01/17/2015240085867Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/06/2021240269428Open ↗
12/18/2020240235946Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
10/06/2016240159109Open ↗
12/21/2014240084957Open ↗
▸BISNYCECC ANALYSIS2
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/28/2016240085867Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY12
04/06/2021240269428Open ↗
12/18/2020240235946Open ↗
12/14/2020240235946Open ↗
Showing 3 of 12 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
01/17/2015240085867Open ↗
12/29/2014240085778Open ↗
12/21/2014240084957Open ↗
▸Approvals, Objections & Sign-offs32
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/13/2026X00172884-I1Open ↗
08/13/2026X00096408-I1Open ↗
08/13/2026X00096410-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
08/13/2026X00648337-P2Open ↗
08/13/2026X00648337-S1Open ↗
08/13/2026X00648337-P4Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/19/2021240269428Open ↗
12/18/2020240235946Open ↗
05/27/2011220046778Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/02/2020240269428Open ↗
05/28/2019240235946Open ↗
05/27/2011220046778Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/03/2010220046778Open ↗
▸BISSHED LETTER1
10/10/2017240159109Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00648337-S3Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
06/28/2016240085867Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
04/06/2021240269428Open ↗
12/18/2020240235946Open ↗
▸Filing & Intake Forms11
▸BISEFILING JOB APPLICATION COVER SHEET7
02/21/2020240269428Open ↗
09/14/2018240235946Open ↗
10/06/2016240159109Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION3
06/28/2016240085867Open ↗
06/14/2016240084957Open ↗
06/14/2016240085778Open ↗
▸BISEFILING COVER SHEET1
02/03/2010220046778Open ↗
▸Other Documents5
▸DOB NOWProof of Historic Building3
08/13/2026X00648337-I1Open ↗
08/13/2026X00648337-P1Open ↗
08/13/2026X00648337-P6Open ↗
▸BISFEE EXEMPTION DOCUMENTATION2
02/21/2020240269428Open ↗
01/17/2015240085867Open ↗