← Back
Two family frame
164-04 109 AVENUE
QUEENS · BIN 4216710
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
R3AZoning
2,052 sfGross Floor Area
2Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Two family frame · 3,680 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 09/23/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2025——Ventilation Systems
Ventilation
Broan BROAN BLP150E75-HW 7,658 CFM · Exhaust Fan ×1
1 job · most recent 03/10/2020
FiledStatusContractorScope
03/10/2020Permit IssuedPOWER KEY ELECTRIC CORP.3 meters, 1 new_meters
1 job · most recent 09/23/2025
Concrete
FiledStatusContractorScope
09/23/2025——Concrete
Building Lifecycle
All (59)Filed (2)Violation (27)Objection (27)Special Inspection (3)
07/23/2026
Objection resolved — Addressed
11/25/2025
Violation issued (HPD, open)
I
09/30/2025
Objection resolved — Resolved
09/30/2025
Objection resolved — Resolved
09/29/2025
Objection raised — Admin
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Scope
09/23/2025
Filed — Alteration
PROPOSE TO RECONFIGURE DWELLING UNITS AT FIRST FLOOR AND INSTALL 3 PIECE BATHROOM IN CELLAR WITH NEW STAIRS TO ACCESS CELLAR FROM GRADE
Q01197744-S1
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
04/10/2025
Objection raised — Scope
04/10/2025
Objection raised — Scope
04/10/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Structural
04/09/2025
Objection raised — Mechanical
04/09/2025
Objection raised — Cost
04/09/2025
Objection raised — Admin
04/09/2025
Objection raised — Other
04/09/2025
Objection raised — Other
04/09/2025
Objection raised — Admin
04/09/2025
Objection raised — Structural
04/07/2025
Filed — Alteration
PROPOSE TO RECONFIGURE DWELLING UNITS AT FIRST FLOOR AND INSTALL 3 PIECE BATHROOM IN CELLAR WITH NEW STAIRS TO ACCESS CELLAR FROM GRADE
Q01197744-I1
03/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/19/2025
Special inspection requirement — Mechanical Systems
03/19/2025
Special inspection requirement — Final
12/05/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
11/18/2022
Violation issued (HPD, open)
I
03/17/2022
Violation issued (HPD, open)
I
04/21/2021
Violation issued (HPD, open)
I
04/23/2020
Violation issued (HPD, open)
B
11/08/2019
Violation issued (HPD, open)
I
01/12/2018
Violation issued (HPD, open)
I
03/06/2016
Violation issued (HPD, closed)
C
03/06/2016
Violation issued (HPD, closed)
C
03/06/2016
Violation issued (HPD, closed)
C
10/03/2015
Violation issued (HPD, closed)
B
10/03/2015
Violation issued (HPD, closed)
B
09/23/2015
Violation issued (HPD, closed)
B
08/30/2012
Violation issued (ECB, closed)
Construction
08/22/2012
Violation issued (ECB, closed)
Unknown
07/11/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/16/2012
Violation issued (ECB, closed)
Unknown
04/10/2012
Violation issued (ECB, closed)
Construction
04/10/2012
Violation issued (ECB, closed)
Construction
04/10/2012
Violation issued (ECB, closed)
Construction
03/21/2008
Violation issued (ECB, closed)
Construction
12/08/2004
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
05/29/2001
Violation issued (ECB, closed)
Construction
05/29/2001
Violation issued (ECB, closed)
Quality of Life
03/16/2001
Violation issued (ECB, closed)
HPD
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2016$530K—— → —$258/sf building
03/23/2016$171K—Private party → BIG APPLE REHAB CORP.$83/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLD3 ENGINEERING PLLC209/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC403/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/19/2025Structural Stability – Alterations of existing buildings—special
03/19/2025Mechanical Systems—special
03/19/2025Final—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01197744-I1Request digital key ↗
08/20/2026Q01197744-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q01197744-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01197744-S1Open ↗
08/13/2026Q01197744-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01197744-I1Open ↗
08/13/2026Q01197744-S1Open ↗