← Back
BuildNYC
Two family frame
164-04 109TH AVENUE
QUEENS · South Jamaica · BIN 4216710
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
R3AZoning
2,052 sfGross Floor Area
2Units
Rent Stabilized9 Active Violations ▸FDNY Report ↗
Two family frame · 3,680 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Install exterior door and cellar access stair1 filing · 7 docs
CellarInstall exterior door and cellar access stair1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2016$530K—— → —$258/sf building
03/23/2016$171K—Private party → BIG APPLE REHAB CORP.$83/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLD3 Engineering209/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MJB Consultants403/21/2026
Building Lifecycle
All (59)Filed (2)Violation (27)Objection (27)Special Inspection (3)
07/23/2026
Objection resolved — Addressed
11/25/2025
Violation issued (HPD, open)
I
09/30/2025
Objection resolved — Resolved
09/30/2025
Objection resolved — Resolved
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Admin
09/29/2025
Objection raised — Scope
09/23/2025
Filed — Alteration
PROPOSE TO RECONFIGURE DWELLING UNITS AT FIRST FLOOR AND INSTALL 3 PIECE BATHROOM IN CELLAR WITH NEW STAIRS TO ACCESS CELLAR FROM GRADE
Q01197744-S1
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
04/10/2025
Objection raised — Scope
04/10/2025
Objection raised — Scope
04/10/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Admin
04/09/2025
Objection raised — Cost
04/09/2025
Objection raised — Structural
04/09/2025
Objection raised — Admin
04/09/2025
Objection raised — Other
04/09/2025
Objection raised — Other
04/09/2025
Objection raised — Mechanical
04/09/2025
Objection raised — Structural
04/07/2025
Filed — Alteration
PROPOSE TO RECONFIGURE DWELLING UNITS AT FIRST FLOOR AND INSTALL 3 PIECE BATHROOM IN CELLAR WITH NEW STAIRS TO ACCESS CELLAR FROM GRADE
Q01197744-I1
03/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/19/2025
Special inspection requirement — Mechanical Systems
03/19/2025
Special inspection requirement — Final
12/05/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
11/18/2022
Violation issued (HPD, open)
I
03/17/2022
Violation issued (HPD, open)
I
04/21/2021
Violation issued (HPD, open)
I
04/23/2020
Violation issued (HPD, open)
B
11/08/2019
Violation issued (HPD, open)
I
01/12/2018
Violation issued (HPD, open)
I
03/06/2016
Violation issued (HPD, closed)
C
03/06/2016
Violation issued (HPD, closed)
C
03/06/2016
Violation issued (HPD, closed)
C
10/03/2015
Violation issued (HPD, closed)
B
10/03/2015
Violation issued (HPD, closed)
B
09/23/2015
Violation issued (HPD, closed)
B
08/30/2012
Violation issued (ECB, closed)
Construction
08/22/2012
Violation issued (ECB, closed)
Unknown
07/11/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/16/2012
Violation issued (ECB, closed)
Unknown
04/10/2012
Violation issued (ECB, closed)
Construction
04/10/2012
Violation issued (ECB, closed)
Construction
04/10/2012
Violation issued (ECB, closed)
Construction
03/21/2008
Violation issued (ECB, closed)
Construction
12/08/2004
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
05/29/2001
Violation issued (ECB, closed)
Construction
05/29/2001
Violation issued (ECB, closed)
Quality of Life
03/16/2001
Violation issued (ECB, closed)
HPD
Nothing on file for this building.
1 project · most recent 09/23/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2025——Ventilation Systems
Ventilation
Broan BROAN BLP150E75-HW 7,658 CFM · Exhaust Fan ×1
1 project · most recent 03/10/2020
FiledStatusContractorScope
03/10/2020Permit IssuedPower Key Electric3 meters, 1 new_meters
1 project · most recent 09/23/2025
Concrete
FiledStatusContractorScope
09/23/2025——Concrete
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/19/2025Structural Stability – Alterations of existing buildings—special
03/19/2025Mechanical Systems—special
03/19/2025Final—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01197744-S1Request digital key ↗
08/20/2026Q01197744-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q01197744-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01197744-I1Open ↗
08/13/2026Q01197744-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01197744-S1Open ↗
08/13/2026Q01197744-I1Open ↗