Miscellaneous one family
164 14 STREET
💬 Discuss this project
1901Year Built
2Stories
A9Building Class
R6BZoning
2,240 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous one family · Owner of record: 164 14TH STREET REALTY LLC · 1,992 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 1 filing · 20 docs
Floor 4Under Construction28p · 1 filing · 20 docs
Floor 3Under Construction27p · 1 filing · 20 docs
Floor 2Under Construction27p · 1 filing · 20 docs
Floor 1Under Construction32p · 2 filings · 20 docs
CellarUnder Construction31p · 1 filing · 20 docs
Site & exteriorUnder Construction7p · 2 filings · 4 docs
Filed — no permit issued16p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL CONSTRUCTION707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/18/2024$1.3M—— → —$598/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN PIONEERING ARCHITECTURE307/17/2026
MCHENERY TESTING LAB204/14/2026
FENG LI101/29/2026
BASIC GROUPS CORP604/01/2025
PATH ARCHITECTURE PC101/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
URBAN PIONEERING ARCHITECTURE DPC1203/21/2026
QUICK FILING OF NY INC103/21/2026
JENNY FLORES EXPEDITING103/21/2026
QUICK FILING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LBM CONSTRUCTION OF NY INGeneral Contractor907/08/2026
ADI AL CONSTRUCTION INCGeneral Contractor506/28/2026
STEEL CONSTRUCTION LLCGeneral Contractor207/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
RICHARD NEUElectrical103/22/2026
R&S ELITE CONSTRUCTIONGeneral Contractor107/08/2026
H.K. MECHANICAL SVC CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN PIONEERING ARCHITEC6521307/17/2026
BLUE LIGHT CONSULTING &AM9394404/01/2025
BEALIN GROUPS CORP9869103/24/2025
Building Lifecycle
All (93)Filed (13)Permit Issued (18)Violation (2)Inspection (8)Objection (22)Special Inspection (30)
10/01/2026
Permit issued — Sidewalk Shed
B01297630-I1-SH
08/24/2026
Objection resolved — Addressed
08/24/2026
Objection resolved — Addressed
08/21/2026
Objection raised — Cost
08/21/2026
Objection raised — Other
08/10/2026
Objection resolved — Addressed
08/10/2026
Objection resolved — Addressed
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Other
07/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB#B01124516-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01124516-P1
06/09/2026
Permit issued — Sprinklers
B01124516-S5-EW-SP
06/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/20/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/18/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/06/2026
Permit issued — Plumbing
B01124516-S1-PL
04/17/2026
Violation issued (ECB, open)
Unknown
04/17/2026
Violation issued (ECB, open)
Unknown
04/14/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01386885-I1
04/14/2026
Permit issued — Supported Scaffold
B01386885-I1-SF
04/14/2026
Permit issued — Construction Fence
B01165797-I1-FN
04/14/2026
Permit issued — Mechanical Systems
B01124516-S6-MS
04/14/2026
Permit issued — Structural
B01124516-S3-ST
04/14/2026
Permit issued — Foundation
B01124516-S4-FO
04/10/2026
Permit issued — General Construction
B01124516-I1-GC
03/01/2026
Objection resolved — Addressed
02/22/2026
Special inspection requirement — Footing and Foundation
02/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/22/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/07/2026
Objection raised — Admin
02/06/2026
Permit issued — Structural
B01124516-S3-ST
02/06/2026
Permit issued — Foundation
B01124516-S4-FO
02/06/2026
Permit issued — Mechanical Systems
B01124516-S6-MS
01/29/2026
Filed — Alteration
SOE with JOB#B01124516-11
B01346925-I1
12/12/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/03/2025
Permit issued — General Construction
B01124516-I1-GC
10/07/2025
Permit issued — Sidewalk Shed
B01297630-I1-SH
10/06/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01297630-I1
09/08/2025
Permit issued — General Construction
B01124516-I1-GC
09/08/2025
Permit issued — Construction Fence
B01165797-I1-FN
05/02/2025
Objection resolved — Addressed
04/10/2025
Objection raised — Other
04/08/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/02/2025
Special inspection requirement — Maintenance information
ANDREW GOODRICH
04/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB#B01124516-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01124516-S3
04/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB#B01124516-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01124516-S7
04/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB#B01124516-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01124516-S4
04/01/2025
Objection raised — Other
04/01/2025
Objection resolved — Addressed
04/01/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB#B01124516-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01124516-S6
03/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB#B01124516-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01124516-S5
03/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB#B01124516-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01124516-S1
02/05/2025
Special inspection requirement — Shutoff dampers
ANDREW GOODRICH
02/04/2025
Permit issued — General Construction
B01124516-I1-GC
01/22/2025
Permit issued — Construction Fence
B01165797-I1-FN
01/17/2025
Filed — Alteration
install temporary construction fence in conjunction with the main application # B01124516-I1
B01165797-I1
01/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANDREW GOODRICH
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC10/01/2026
DOB NOWSprinklersPermit IssuedORBIT SPRINKLER CORP06/09/2026
DOB NOWPlumbingPermit IssuedH.K. MECHANICAL SVC CORP05/06/2026
DOB NOWSupported ScaffoldPermit IssuedSTEEL CONSTRUCTION LLC04/14/2026
DOB NOWConstruction FencePermit IssuedADI AL CONSTRUCTION INC04/14/2026
DOB NOWMechanical SystemsPermit IssuedADI AL CONSTRUCTION INC04/14/2026
DOB NOWStructuralPermit IssuedADI AL CONSTRUCTION INC04/14/2026
DOB NOWFoundationPermit IssuedADI AL CONSTRUCTION INC04/14/2026
DOB NOWGeneral ConstructionPermit IssuedADI AL CONSTRUCTION04/10/2026
DOB NOWStructuralPermit IssuedLBM CONSTRUCTION OF NY IN02/06/2026
DOB NOWFoundationPermit IssuedLBM CONSTRUCTION OF NY IN02/06/2026
DOB NOWMechanical SystemsPermit IssuedLBM CONSTRUCTION OF NY IN02/06/2026
DOB NOWGeneral ConstructionPermit IssuedLBM CONSTRUCTION OF NY IN12/03/2025
DOB NOWSidewalk ShedPermit IssuedSTEEL CONSTRUCTION LLC10/07/2025
DOB NOWGeneral ConstructionPermit IssuedLBM CONSTRUCTION OF NY IN09/08/2025
DOB NOWConstruction FencePermit IssuedLBM CONSTRUCTION OF NY IN09/08/2025
DOB NOWGeneral ConstructionPermit IssuedLBM CONSTRUCTION OF NY IN02/04/2025
DOB NOWConstruction FencePermit IssuedR&S ELITE CONSTRUCTION01/22/2025
1 project · most recent 07/17/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026Permit IssuedADI AL CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-GL09NA-U2 9,000 BTU · Fan Coil Indoor ×8
MSZ-GL12NA-U2 12,000 BTU · Fan Coil Indoor ×6
MXZ-4C36NA3-U1 35,400 BTU · Condensing Unit ×2
MXZ-2C20NA4-U1 18,000 BTU · Condensing Unit ×1
MXZ-3C24NAHZ2-U1 22,000 BTU · Condensing Unit ×1
MXZ-3C30NA4-U1 28,400 BTU · Vrf Outdoor ×1
Ventilation
Panasonic FV-06VE1 40 CFM · Erv ×4
Greenheck SFB-9 360 CFM · Exhaust Fan ×2
1 project · most recent 07/17/2026
Sprinkler System
FiledStatusContractorScope
07/17/2026Permit IssuedORBIT SPRINKLER CORPSprinkler System
1 project · most recent 07/17/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/17/2026Permit IssuedH.K. MECHANICAL SVC CORPStorm, Water/Sanitary
2 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedDENMAR ELECTRIC CORPGeneral Wiring
10/07/2025Permit IssuedRICHARD NEU—
2 projects · most recent 07/17/2026
Steel
FiledStatusContractorScope
07/17/2026Permit IssuedORBIT SPRINKLER CORPSteel
01/29/2026——3 scope_items
3 projects · most recent 04/14/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
04/14/2026Permit IssuedSTEEL CONSTRUCTION LLCScaffold
10/06/2025Permit IssuedSTEEL CONSTRUCTION LLCSidewalk Shed
01/17/2025Permit IssuedADI AL CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/04/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/20/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/18/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/12/2025Pass-Final PL - UndergroundPassView ↗
04/08/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
02/22/2026Footing and Foundation—progress
02/22/2026Structural Stability – Alterations of existing buildings—special
02/22/2026Excavations - Sheeting, Shoring, and Bracing—special
04/02/2025Maintenance informationANDREW GOODRICHenergy_progress
04/01/2025Excavations - Sheeting, Shoring, and Bracing—special
02/05/2025Shutoff dampersANDREW GOODRICHenergy_progress
01/16/2025HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
01/16/2025HVAC-R and service water heating equipmentANDREW GOODRICHenergy_progress
01/16/2025HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
12/17/2024Interior lighting powerJames Hillenergy_progress
12/17/2024MeteringJames Hillenergy_progress
12/17/2024Exterior lighting powerJames Hillenergy_progress
12/12/2024Lighting controlsJames Hillenergy_progress
12/12/2024Lighting in dwelling unitsJames Hillenergy_progress
12/05/2024Structural Stability – Alterations of existing buildingsFeng Lispecial
12/05/2024Structural Stability – Alterations of existing buildingsANDREW GOODRICHspecial
12/03/2024Concrete - PrecastFeng Lispecial
12/03/2024Concrete - Cast-In-PlaceFeng Lispecial
12/03/2024Structural Stability – Alterations of existing buildingsFeng Lispecial
12/03/2024Structural Cold-Formed SteelFeng Lispecial
12/03/2024Structural Steel - DetailsFeng Lispecial
11/25/2024Footing and FoundationFeng Liprogress
11/25/2024Mechanical SystemsANDREW GOODRICHspecial
11/25/2024FinalEric Sunprogress
11/25/2024Designated Seismic SystemFeng Lispecial
Latest 25 of 37.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/03/2026B01386885-I1Request digital key ↗
08/24/2026B01066867-I1Request digital key ↗
08/23/2026B01165797-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B01124516-P1Open ↗
08/13/2026B01066867-I1Open ↗
08/13/2026B01124516-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026B01124516-P1Open ↗
08/13/2026B01066867-I1Open ↗
08/13/2026B01124516-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01124516-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026B01386885-I1Open ↗
08/24/2026B01066867-I1Open ↗
08/22/2026B01124516-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B01124516-S6Open ↗
08/31/2026B01124516-S3Open ↗
08/31/2026B01124516-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01124516-S6Open ↗
09/01/2026B01124516-S6Open ↗
08/31/2026B01124516-S3Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026B01124516-P1Open ↗
08/13/2026B01124516-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01124516-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01124516-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/22/2026B01124516-S8Open ↗
08/22/2026B01124516-S6Open ↗
08/22/2026B01124516-S5Open ↗
Showing 3 of 8 on file for this type
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/15/2026B01124516-P1Open ↗
08/13/2026B01066867-I1Open ↗
08/13/2026B01124516-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026B01066867-I1Open ↗
08/15/2026B01124516-I1Open ↗
08/15/2026B01124516-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B01124516-P1Open ↗
08/13/2026B01066867-I1Open ↗
08/13/2026B01124516-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01346925-I1Open ↗