← Back
Two stories - detached, small or mid-size
164-30 75 ROAD
QUEENS · BIN 4150802
💬 Discuss this project
1926Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,386 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,342 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/04/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/04/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/06/2025
Signed off — Alteration
Q01043296-I1
06/12/2024
Permit issued — Solar
Q01043296-I1-SL
06/04/2024
Filed — Alteration
Q01043296-I1
04/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
04/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
04/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
04/29/2024
Special inspection requirement — Final
Mina Makar
04/29/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR06/12/2024
1 project · most recent 06/04/2024
FiledStatusContractorScope
06/04/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/29/2024Fire-Resistant Penetrations and JointsMina Makarspecial
04/29/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
04/29/2024Energy Code Compliance InspectionsMina Makarprogress
04/29/2024FinalMina Makarprogress
04/29/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01043296-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026Q01043296-I1Open ↗
09/02/2026Q01043296-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01043296-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026Q01043296-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01043296-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01043296-I1Open ↗