DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB07/09/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTED AT THE TIME OF MY INSEPCTION OBSERVED AT 3RD FLOOR BALCONY HAS BEEN REMOVED OR COLLAPSED LEAVING STRUCTURAL STEEL ON THE LEFT AN DRIGHT SIDE EXPOSED T$12K due
DOB06/23/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/31/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB03/29/2021FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED AT EXP#1 ON 3RD FL BALCONY HAS BEEN REMOVED(01)COLLAPSED LEAVING STRUCTURE STEEL ON THE LEFT & RIGHT SIDE.IT'S DANGEROUS CONDITIO$12K due
ECB01/08/2021FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT EXP#1;THE RD FL BALCONY HAS BEEN REMOVED OR HAS COLLAPSED,LEAVING STRUCTURAL STEEL ON THE LEFT & RIGHT SIDE EXPOSED TO THE ELEMENTS CREATING A HAZARD$3K due
DOB09/16/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/22/2020EMERGENCY WORK:3 STORY MASN WALLS AND WOOD FRAMED FLOORS SEMI ATTACHED RESIDENTIAL BUILDING.THE 3RD FLOOR BALCONY HAD COLLAPSED ON 2ND FLOOR BALCONY.2ND FLOOR BALCONY WAS DAMGED AND SHOWS SIGNIFICANT DEFLECTION AND IS IN DANGER OF COLLAPSE.IMMEDIATELY PROVIDE TEMPORARY SHORING AT 2ND FLOOR BALCONY UNDER SUPERVISION OF PE.FILE FOR PERMIT BY 6/25/20
DOB06/22/2020FAILURE TO MAINTAIN:3 STRY MASONRY WALLS AND WOOD FLOORS SEMI-ATTACHED BUILDING.THE 3RD FLOOR BALCONY HAD COLLAPSED.THE 2ND FLOOR BALCONY WAS DAMAGED AND WAS DEFLECTING & IS IN STATE OF DISREPAIR.OWNER TO ENGAGE NYS PE AND CONTRACTOR TO REPAIR BUILDING UNDER PERMIT.FILE BY 7/1/20 START BY 7/15/20
ECB06/17/2020AT FRONT OF BUILDING, 3RD FLOOR BALCONY MISSING DUE TO WATER DAMAGING DECK JOISTS CAUSING BALCONY TO COLLAPSE., REPAIR AND/REPLACE$1K due