← Back
BuildNYC
Three families
164 ATKINS AVENUE
BROOKLYN · BIN 3089011
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R5BZoning
2,760 sfGross Floor Area
3Units
Rent Stabilized13 Active Violations 10 unresolved · 3 paperwork only ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Resolve DOB violations, no use change7p · 1 filing · 20 docs
Floor 1Resolve DOB violations, no use change7p · 1 filing · 20 docs
Sub-BasementResolve DOB violations, no use change7p · 1 filing · 20 docs
Site & exteriorResolve DOB violations, no use change3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Inter-Realty1007/08/2026
Atkins Investors103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2025$1.1M—ATKINS INVESTORS LLC → Private party$417/sf building
09/23/2024$550K—164 ATKINS LLC → ATKINS INVESTORS LLC$199/sf building
05/20/2020$150K—Private party → 164 ATKINS LLC$54/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Madriaga Engineering310/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bernardo Gamba303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dfe ContractorGeneral Contractor303/21/2026
WCK ElectricElectrical103/22/2026
Just Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM Engineering Services P7975111/26/2024
Building Lifecycle
12/10/2025
Signed off — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE ECB VIOLATIONS 35484512P, 35243524P, AND 35241988Y. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
B01145775-I1
12/09/2025
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
B01145775-S1-PL
10/14/2025
Filed — Alteration
SUBSEQUENT ALTERATION APPLICATION FILED TO RESOLVE ECB VIOLATIONS 35484512P, 35243524P, AND 35241988Y. NO CHANGE TO USE, OCCUPANCY, AND/OR EGRESS PROPOSED.
B01145775-P1
07/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
108 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMohamed Abdelrazek12/09/2024
DOB NOWGeneral ConstructionSigned-offDfe Contractor12/06/2024
1 project · most recent 10/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/14/2025Permit IssuedJust Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 12/05/2024
General Wiring
FiledStatusContractorScope
12/05/2024Permit IssuedWCK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/11/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/25/2024HVAC-R and service water piping design and insulationAlbert Munozenergy_progress
11/25/2024Energy Code Compliance InspectionsAlbert Munozprogress
11/25/2024Fire-Resistance Rated ConstructionAlbert Munozprogress
11/25/2024Fire-Resistant Penetrations and JointsAlbert Munozspecial
11/25/2024Insulation placement and R valuesAlbert Munozenergy_progress
11/25/2024MeteringAlbert Munozenergy_progress
11/25/2024Air barrier - visual inspectionAlbert Munozenergy_progress
11/25/2024Interior lighting powerAlbert Munozenergy_progress
11/21/2024FinalAlbert Munozprogress
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account