DOB12/07/2013DUE TO SEVERE WEATHER CAUSED BY HURRICANE SANDY THE FOLLOWING DAMAGES OCCURED: DUE TO DAMAGES CAUSED BY FLOODING BOILER AND HOTWATER HEATER REPLACED WITH 1 LAARS BOILER AND 1 G.E. HOTWATER HEATER IN THE CELLAR REMEDY: MAKE ALL NECESSARY REPAIRS AND OBTAIN ALL REQUIRED PERMITS WITHIN 60 DAYS FROM INSPECTION DATE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.