← Back
Three families
164 BRIGHTON AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5002769
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R3AZoning
1,672 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 164 BRIGHTON LLC · 2,700 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Filed — no permit issued2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
164 BRIGHTON LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN ARCHITECTURAL DESIGN, PC107/06/2026
Building Lifecycle
All (18)Filed (1)Violation (13)Objection (2)Special Inspection (2)
07/28/2026
Objection resolved — Resolved
07/23/2026
Objection raised — Scope
07/06/2026
Filed — Alteration
Application herewith filed to remove all illegal interior partition walls and doors to discontinue illegal use. To rectify violation #39191806R & 35483707K to original legal condition. No change in egress, use, bulk and occupancy.
S01426469-I1
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/09/2026
Violation issued (ECB, open)
Construction
09/25/2025
Violation issued (ECB, open)
Construction
08/05/2025
Violation issued (HPD, open)
I
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/22/2025
Violation issued (HPD, closed)
B
07/22/2025
Violation issued (HPD, closed)
B
07/22/2025
Violation issued (HPD, closed)
B
07/07/2025
Violation issued (HPD, closed)
C
07/07/2025
Violation issued (HPD, closed)
A
07/07/2025
Violation issued (HPD, closed)
B
07/07/2025
Violation issued (HPD, closed)
A
07/07/2025
Violation issued (HPD, closed)
B
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/06/2026Fire-Resistant Penetrations and Joints—special
07/06/2026Fire-Resistance Rated Construction—progress
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026S01426469-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01426469-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026S01426469-I1Open ↗