Office with commercial, 1-6 stories
164 CANAL STREET
MANHATTAN · BIN 1002414
💬 Discuss this project
1915Year Built
6Stories
O5Building Class
C6-1GZoning
39,224 sfGross Floor Area
7Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: ASB GEORGE CANAL, LLC · 7,063 sf lot · 5.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 2 docs
Floor 624p · 6 filings · 20 docs
Floor 513p · 1 filing · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 319p · 3 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
5 jobs · most recent 08/22/2023
General Wiring
FiledStatusContractorScope
08/22/2023Permit IssuedALLIANCE ELEVATOR COMPANY—
06/22/2023CompleteTOP SHELF ELECTRIC CORP—
04/07/2023CompleteFLAG ELECTRIC INCGeneral Wiring
09/20/2021Permit IssuedDANICK ELEC'L CONTR'G CORGeneral Wiring
06/29/2021CompleteALLSTATE ELEC'L CONT INCGeneral Wiring
1 job · most recent 06/22/2026
Steel Masonry Wood
FiledStatusContractorScope
06/22/2026Signed-offFOLOR INCSteel, Masonry, Wood
Building Lifecycle
All (147)Filed (18)Permit Issued (16)Signed Off (12)Violation (59)Inspection (10)Objection (2)Special Inspection (30)
09/18/2026
Permit issued — Structural
M01314241-I1-ST
07/07/2026
Objection resolved — Resolved
07/06/2026
Objection raised — Structural
06/22/2026
Filed — Alteration CO
Structural modifications associated with passive recreation roof deck installation.
M08051013-P2
05/19/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JOSEPH MARTINES
05/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH MARTINES
04/14/2026
Filed — Alteration
M01314241-I1
03/31/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/28/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Philip Murray
01/28/2026
Special inspection requirement — Structural Steel - Welding
Philip Murray
01/27/2026
Special inspection requirement — Structural Steel - Details
Philip Murray
11/26/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/05/2025
Special inspection requirement — Final
Philip Murray
07/16/2025
Signed off — Alteration
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM ON THE 6TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08050944-I1
07/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/24/2025
Permit issued — Sprinklers
M08050944-I1-EW-SP
01/27/2025
Signed off — Alteration
M08050941-I1
11/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH MARTINES
11/25/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JOSEPH MARTINES
11/14/2024
Filed — Alteration CO
Structural modifications associated with passive recreation roof deck installation.
M08051013-P1
11/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH MARTINES
11/07/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JOSEPH MARTINES
09/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2024
Signed off — Alteration
MECHANICAL SYSTEMS MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08050938-I1
05/03/2024
Signed off — Alteration
M08050930-I1
05/03/2024
Filed — Alteration
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM ON THE 6TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08050944-P1
05/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH MARTINES
05/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH MARTINES
05/03/2024
Special inspection requirement — Interior lighting power
JOSEPH MARTINES
05/03/2024
Special inspection requirement — Mechanical Systems
JOSEPH MARTINES
05/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH MARTINES
05/03/2024
Special inspection requirement — Final
JOSEPH MARTINES
05/03/2024
Special inspection requirement — Maintenance information
JOSEPH MARTINES
05/02/2024
Filed — Alteration
MECHANICAL SYSTEMS MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08050938-P1
05/01/2024
Signed off — Alteration CO
Structural modifications associated with passive recreation roof deck installation.
M08051013-S1
03/08/2024
Signed off — Alteration
Installation of working platform as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00929654-I1
02/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH MARTINES
02/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH MARTINES
02/13/2024
Special inspection requirement — Sprinkler Systems
JOSEPH MARTINES
02/13/2024
Special inspection requirement — Mechanical Systems
JOSEPH MARTINES
02/13/2024
Special inspection requirement — Final
JOSEPH MARTINES
02/13/2024
Special inspection requirement — Interior lighting power
JOSEPH MARTINES
02/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH MARTINES
02/13/2024
Special inspection requirement — Maintenance information
JOSEPH MARTINES
02/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH MARTINES
12/07/2023
Signed off — Alteration
Installation of support scaffolding as indicated on the attached drawings. There are no changes in use, egress or occupancy
M00906823-I1
12/07/2023
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00891715-I1
12/07/2023
Signed off — Alteration
Installation of roof protection as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00891726-I1
11/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/18/2023
Filed — Alteration
Installation of working platform as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00929654-I1
09/18/2023
Permit issued — Protection and Mechanical Methods
M00929654-I1-PMM
07/20/2023
Filed — Alteration
Installation of support scaffolding as indicated on the attached drawings. There are no changes in use, egress or occupancy
M00906823-I1
07/20/2023
Permit issued — Supported Scaffold
M00906823-I1-SF
06/27/2023
Permit issued — Sidewalk Shed
M00891715-I1-SH
06/26/2023
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00891715-I1
06/22/2023
Permit issued — Protection and Mechanical Methods
M00891726-I1-PMM
06/21/2023
Filed — Alteration
Installation of roof protection as indicated on the attached drawings. There are no changes in use, egress or occupancy.
M00891726-I1
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 147 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NU COR CONSTRUCTION103/22/2026
DADOURIAN MANAGEMENT2303/21/2026
NEW YORK LIFE INS. CO103/21/2026
CITIBANK NA203/21/2026
D G HART MANAGEMENT203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2013$61.9M—Private party → ASB GEORGE CANAL, LLC$1,578/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP903/21/2026
PREEMPTIVE SOLUTIONS & CONSULTING L603/21/2026
OUTSOURCE CONSULTANTS, INC.403/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor1007/08/2026
FOLOR INCGeneral Contractor807/08/2026
GREGORY BOWMANElectrical503/21/2026
MOSKOWITZ STUARTElectrical203/21/2026
W5 GROUP LLCGeneral Contractor203/21/2026
STUART MOSKOWITZElectrical203/21/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
MACKLER MASTER FIRE INCFire Protection107/08/2026
PAR FIRE PROTECTION LLCFire Protection107/08/2026
MARLEX MANAGEMENT INCGeneral Contractor109/19/2026
M&T PLBG AND HTG CO., INCPlumbing108/26/2026
ALLSTATE ELEC'L CONT INCElectrical103/22/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
ALPHONSE, MICHAELElectrical103/21/2026
FEDER, IRVINGElectrical103/21/2026
PEREIRA, WESLLEYElectrical103/21/2026
RALPH OCCHIPINTIElectrical103/21/2026
VIVIANO, PAULElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH MARTINES PE, PLLC1428906/22/2026
GILSANZ MURRAY STEFICEK240104/14/2026
ALAN MARGOLIN & ASSOC423108/11/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMARLEX MANAGEMENT INC09/18/2026
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP06/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC09/18/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC07/20/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC06/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC06/22/2023
DOB NOWStructuralSigned-offFOLOR INC04/18/2023
DOB NOWPlumbingSigned-offJW DEVELOPMENT HOLDINGS L04/17/2023
DOB NOWSprinklersSigned-offMACKLER MASTER FIRE INC04/13/2023
DOB NOWMechanical SystemsSigned-offFOLOR INC03/31/2023
DOB NOWGeneral ConstructionSigned-offFOLOR INC03/31/2023
DOB NOWGeneral ConstructionPermit IssuedFOLOR INC01/23/2023
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE01/27/2022
DOB NOWGeneral ConstructionSigned-offW5 GROUP LLC10/29/2021
DOB NOWGeneral ConstructionSigned-offFOLOR INC06/16/2021
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC09/24/2020
BISOTISSUEDA.W. & S. CONSTRUCTION CO08/13/2020
BISOTISSUEDA.W. & S. CONSTRUCTION CO08/11/2020
BISSPISSUEDADVANCED PLBG, MECH & SPR10/27/2017
BISMHISSUEDAIR STREAM AIR CONDITIONING11/21/2016
BISMHISSUEDSOUND REFRIGERATION & AIR10/18/2016
BISOTISSUEDFOLOR INC09/26/2016
BISSPISSUEDGO PRO FIRE PROTECTION C05/24/2016
BISPLISSUEDHYDROKINETIC PLBG & HTG I04/29/2016
BISMHISSUEDFOLOR INC04/25/2016
BISOTISSUEDFOLOR INC04/25/2016
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.10/19/2015
BISPLISSUEDLAB PLBG & HTG CO INC08/24/2015
BISOTISSUEDHANNAH SERVICES INC05/08/2015
BISOTISSUEDHANNAH SERVICES INC05/08/2015
BISOTISSUEDEXCEL INTERIOR CONSTRUCTION02/04/2015
BISOTISSUEDGUSTAV RESTORATION LLC12/16/2014
BISSPISSUEDABCO-PEERLESS SPRKLR CORP12/10/2014
BISPLISSUEDTRISTATE PLBG SVCS CORP10/28/2014
BISOTISSUEDEXCEL INTERIOR CONSTRUCTION10/24/2014
BISOTISSUEDEXCEL INTERIOR CONSTRUCTION10/24/2014
BISSPISSUEDTRIANGLE FIRE PROT. CORP10/23/2014
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.10/17/2014
BISSPISSUEDADVANCED PLBG, MECH & SPR09/16/2014
BISOTISSUEDACE ATLAS CORPORATION08/26/2014
+ 26 more permits on file
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/31/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/26/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/11/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
05/19/2026Construction Operations Influencing Adjacent StructuresJOSEPH MARTINESspecial
05/19/2026Structural Stability – Alterations of existing buildingsJOSEPH MARTINESspecial
01/28/2026Structural Steel - High Strength BoltingPhilip Murrayspecial
01/28/2026Structural Steel - WeldingPhilip Murrayspecial
01/27/2026Structural Steel - DetailsPhilip Murrayspecial
11/05/2025FinalPhilip Murrayprogress
11/25/2024Structural Stability – Alterations of existing buildingsJOSEPH MARTINESspecial
11/25/2024Construction Operations Influencing Adjacent StructuresJOSEPH MARTINESspecial
11/07/2024Structural Stability – Alterations of existing buildingsJOSEPH MARTINESspecial
11/07/2024Construction Operations Influencing Adjacent StructuresJOSEPH MARTINESspecial
05/03/2024HVAC-R and service water heating equipmentJOSEPH MARTINESenergy_progress
05/03/2024HVAC-R and service water piping design and insulationJOSEPH MARTINESenergy_progress
05/03/2024Interior lighting powerJOSEPH MARTINESenergy_progress
05/03/2024Mechanical SystemsJOSEPH MARTINESspecial
05/03/2024HVAC-R and service water heating system controlsJOSEPH MARTINESenergy_progress
05/03/2024FinalJOSEPH MARTINESprogress
05/03/2024Maintenance informationJOSEPH MARTINESenergy_progress
02/13/2024HVAC-R and service water heating system controlsJOSEPH MARTINESenergy_progress
02/13/2024Fire-Resistant Penetrations and JointsJOSEPH MARTINESspecial
02/13/2024Sprinkler SystemsJOSEPH MARTINESspecial
02/13/2024Mechanical SystemsJOSEPH MARTINESspecial
02/13/2024FinalJOSEPH MARTINESprogress
02/13/2024Interior lighting powerJOSEPH MARTINESenergy_progress
02/13/2024HVAC-R and service water piping design and insulationJOSEPH MARTINESenergy_progress
02/13/2024Maintenance informationJOSEPH MARTINESenergy_progress
Latest 25 of 41.
▾Documents — 713 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch18
09/03/2026M00523641-I1Request digital key ↗
09/03/2026M00576404-I1Request digital key ↗
09/01/2026M08050930-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00360454-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00360454-I1Request digital key ↗
▸Applications & Permits121
▸BISPLAN / WORK APPROVAL APPLICATION66
02/26/2025121919406Open ↗
08/07/2020140925961Open ↗
08/07/2020140925989Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION54
08/13/2020140925961Open ↗
08/11/2020140925989Open ↗
10/30/2017121919406Open ↗
Showing 3 of 54 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M08051013-I1Open ↗
▸Seals & Professional Certifications211
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION80
02/05/2020122896456Open ↗
12/12/2017122168055Open ↗
12/12/2017121922189Open ↗
Showing 3 of 80 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST26
02/08/2018123166661Open ↗
11/28/2016122943887Open ↗
10/12/2016122896456Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT24
08/07/2020140925961Open ↗
08/07/2020140925989Open ↗
02/08/2018123166661Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
08/29/2026M08051013-S1Open ↗
08/29/2026M08051013-S1Open ↗
08/29/2026M08051013-S1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00360454-I1Open ↗
09/01/2026M08050930-I1Open ↗
09/01/2026M08050941-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
08/29/2026M08051013-S1Open ↗
08/29/2026M08051013-S1Open ↗
08/29/2026M01314241-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/07/2020140925961Open ↗
08/07/2020140925989Open ↗
10/12/2016140555566Open ↗
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/07/2020140925961Open ↗
08/07/2020140925989Open ↗
10/12/2016140555566Open ↗
▸Trade Schedules & Equipment50
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
10/20/2016122896456Open ↗
10/14/2016122749366Open ↗
10/12/2016122896456Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS7
04/26/2017140555566Open ↗
04/26/2017140555566Open ↗
12/14/2016122749366Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
04/24/2020122969822Open ↗
06/10/2019122969822Open ↗
02/08/2018123166661Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
04/26/2017140555566Open ↗
12/14/2016122749366Open ↗
Showing 2 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
02/08/2018123166661Open ↗
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/14/2026M08051013-P2Open ↗
08/13/2026M08051013-I1Open ↗
08/13/2026M08051013-P1Open ↗
▸BISTenant Protection Plan and Notes2
10/12/2016122896456Open ↗
10/04/2016122896456Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/26/2017140555566Open ↗
▸Environmental & Asbestos54
▸BISASBESTOS: CERTIFICATION (DEP ACP5)29
08/07/2020140925961Open ↗
08/07/2020140925989Open ↗
12/21/2016122969822Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/04/2026M00360454-I1Open ↗
09/01/2026M08050930-I1Open ↗
09/01/2026M08050941-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance57
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS31
02/05/2020122896456Open ↗
12/12/2017122168055Open ↗
12/12/2017121922189Open ↗
Showing 3 of 31 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
01/12/2022140925989Open ↗
01/12/2022140925961Open ↗
02/05/2020122896456Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
01/13/2022140925989Open ↗
01/13/2022140925989Open ↗
01/12/2022140925989Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/07/2020140925961Open ↗
08/07/2020140925989Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00523641-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
01/12/2022140925989Open ↗
01/12/2022140925961Open ↗
08/13/2020140925961Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs47
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
04/01/2025121919406Open ↗
01/20/2022140925989Open ↗
01/13/2022140925961Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/24/2020122969822Open ↗
05/15/2017140555566Open ↗
Showing 2 of 5 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership67
▸BISCOST AFFIDAVIT66
01/12/2022140925989Open ↗
01/12/2022140925961Open ↗
08/07/2020140925961Open ↗
Showing 3 of 66 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/30/2025121919406Open ↗
▸Filing & Intake Forms64
▸BISEFILING COVER SHEET35
02/08/2018123166661Open ↗
12/21/2016122969822Open ↗
11/28/2016122943887Open ↗
Showing 3 of 35 on file for this type
▸BISBOROUGH INTAKE FORM12
06/08/2020120661015Open ↗
05/18/2020120599227Open ↗
05/18/2020100114350Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION11
10/24/2016122749366Open ↗
10/20/2016122896456Open ↗
Showing 2 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/07/2020140925961Open ↗
08/07/2020140925989Open ↗
10/12/2016140555566Open ↗
Showing 3 of 6 on file for this type
▸Other Documents7
▸DOB NOWProperty Ownership Certification3
08/14/2026M08051013-P2Open ↗
08/13/2026M08051013-P1Open ↗
08/13/2026M08051013-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISARA Supporting Document1
12/07/2016122749366Open ↗