← Back
Three families
164 CLIFTON PLACE
BROOKLYN · BIN 3055788
💬 Discuss this project
1915Year Built
3Stories
C0Building Class
R6BZoning
3,200 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: CHAUNCEY ST COLLECTIVE LLC · 1,920 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof7p · 2 filings · 20 docs
Floor 37p · 4 filings · 20 docs
Floor 24p · 4 filings · 20 docs
Floor 14p · 3 filings · 20 docs
Cellar9p · 5 filings · 20 docs
Basement3p · 1 filing · 20 docs
2 jobs · most recent 05/10/2023
General Wiring
FiledStatusContractorScope
05/10/2023CompletePRUDENT ELECTRIC INCGeneral Wiring
01/05/2023Permit IssuedAAA'S ELECTL CONTG CORPGeneral Wiring
Building Lifecycle
All (108)Filed (17)Permit Issued (21)Signed Off (6)Violation (4)Inspection (6)Objection (24)Special Inspection (30)
02/28/2024
Signed off — Alteration
B00668701-I1
02/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/05/2024
Signed off — Alteration
SPRINKLER SYSTEM INSTALLED AS PER PLANS FILED HEREWITH
B00730417-I1
01/17/2024
Signed off — Alteration
STRUCTURAL AND FOUNDATION WORK AS PER PLANS FILED HEREWITH
B00655531-I1
01/16/2024
Signed off — Alteration
HVAC WORK TO ADD CONDENSER UNITS TO REAR YARD AS PER PLANS FILED HEREWITH
B00668705-I1
01/16/2024
Signed off — Alteration
INTERIOR AND EXTERIOR RENOVATION AS PER PLANS FILED HEREWITH
B00648694-I1
01/16/2024
Permit issued — General Construction
B00655531-I1-GC
01/15/2024
Signed off — Alteration
B00663047-I1
01/12/2024
Permit issued — Foundation
B00655531-I1-ST
01/02/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/21/2023
Permit issued — Structural
B00655531-I1-ST
12/21/2023
Permit issued — Structural
B00655531-I1-FO
12/15/2023
Special inspection requirement — Sprinkler Systems
SOFIA KAPELYAN
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
12/14/2023
Filed — Alteration
SPRINKLER SYSTEM INSTALLED AS PER PLANS FILED HEREWITH
B00730417-P3
12/13/2023
Special inspection requirement — Sprinkler Systems
SOFIA KAPELYAN
12/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
11/30/2023
Permit issued — Mechanical Systems
B00668705-I1-MS
09/07/2023
Filed — Alteration
SPRINKLER SYSTEM INSTALLED AS PER PLANS FILED HEREWITH
B00730417-P2
09/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
08/31/2023
Special inspection requirement — Sprinkler Systems
SOFIA KAPELYAN
08/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
08/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
JEFF AKERMAN
08/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
JEFF AKERMAN
08/22/2023
Special inspection requirement — Maintenance information
JEFF AKERMAN
08/22/2023
Special inspection requirement — Final
SOFIA KAPELYAN
08/22/2023
Special inspection requirement — Mechanical Systems
JEFF AKERMAN
08/22/2023
Special inspection requirement — Energy Code Compliance Inspections
JEFF AKERMAN
08/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFF AKERMAN
08/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOFIA KAPELYAN
08/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
08/17/2023
Special inspection requirement — Final
SOFIA KAPELYAN
08/17/2023
Special inspection requirement — Insulation placement and R values
JEFF AKERMAN
08/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
JEFF AKERMAN
08/17/2023
Special inspection requirement — Interior lighting power
JEFF AKERMAN
08/17/2023
Special inspection requirement — Energy Code Compliance Inspections
JEFF AKERMAN
08/17/2023
Special inspection requirement — Air barrier - visual inspection
JEFF AKERMAN
08/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
JEFF AKERMAN
08/17/2023
Special inspection requirement — Fenestration air leakage
JEFF AKERMAN
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
08/14/2023
Filed — Alteration
B00668701-P1
08/14/2023
Filed — Alteration
HVAC WORK TO ADD CONDENSER UNITS TO REAR YARD AS PER PLANS FILED HEREWITH
B00668705-P1
08/14/2023
Special inspection requirement — Mechanical Systems
JEFF AKERMAN
08/14/2023
Special inspection requirement — Energy Code Compliance Inspections
JEFF AKERMAN
08/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
08/14/2023
Special inspection requirement — Final
SOFIA KAPELYAN
08/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
JEFF AKERMAN
08/10/2023
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION AS PER PLANS FILED HEREWITH
B00648694-P5
08/01/2023
Permit issued — Sprinklers
B00730417-I1-EW-SP
07/13/2023
Permit issued — Mechanical Systems
B00668705-I1-MS
07/13/2023
Permit issued — Structural
B00655531-I1-ST
07/13/2023
Permit issued — General Construction
B00648694-I1-GC
07/13/2023
Permit issued — Foundation
B00655531-I1-FO
06/13/2023
Permit issued — Plumbing
B00668701-I1-PL
05/04/2023
Permit issued — General Construction
B00655531-I1-FO
05/04/2023
Permit issued — General Construction
B00648694-I1-GC
Latest 60 of 108 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/13/2021$1.9M—Private party → CHAUNCEY ST COLLECTIVE LLC$578/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERS LLC312/14/2023
RISE ARCHITECTURE NJ LLC608/14/2023
RISE ARCHITECTURE508/10/2023
CELIN MUNOZ CONSULTING ENGINEER, PC301/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES1703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CASTLE BAR INTERIORS INCGeneral Contractor3307/08/2026
BUILDTEK LLCGeneral Contractor807/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor303/21/2026
LLOYD G DRUMMOND PLBG&GENFire Protection107/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIA INSPECTIONS LLC73061812/14/2023
BIZ DESIGNS LLC6312103/09/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCASTLE BAR INTERIORS INC01/16/2024
DOB NOWFoundationSigned-offCASTLE BAR INTERIORS INC01/12/2024
DOB NOWStructuralSigned-offCASTLE BAR INTERIORS INC12/21/2023
DOB NOWStructuralSigned-offCASTLE BAR INTERIORS INC12/21/2023
DOB NOWMechanical SystemsSigned-offCASTLE BAR INTERIORS INC11/30/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL08/01/2023
DOB NOWMechanical SystemsSigned-offCASTLE BAR INTERIORS INC07/13/2023
DOB NOWStructuralSigned-offCASTLE BAR INTERIORS INC07/13/2023
DOB NOWGeneral ConstructionSigned-offCASTLE BAR INTERIORS INC07/13/2023
DOB NOWFoundationSigned-offCASTLE BAR INTERIORS INC07/13/2023
DOB NOWPlumbingSigned-offN AND S PLUMBING INC06/13/2023
DOB NOWGeneral ConstructionSigned-offCASTLE BAR INTERIORS INC05/04/2023
DOB NOWGeneral ConstructionSigned-offCASTLE BAR INTERIORS INC05/04/2023
DOB NOWFoundationSigned-offCASTLE BAR INTERIORS INC05/04/2023
DOB NOWConstruction FenceSigned-offJOHN EVAN CONTRACTING COR03/27/2023
DOB NOWSprinklersSigned-offLLOYD G. DRUMMOND02/28/2023
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN10/13/2022
DOB NOWStructuralSigned-offBUILDTEK LLC07/29/2022
DOB NOWStructuralSigned-offBUILDTEK LLC07/28/2022
DOB NOWConstruction FenceSigned-offBUILDTEK LLC06/10/2022
DOB NOWGeneral ConstructionSigned-offBUILDTEK LLC06/01/2022
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/02/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
12/15/2023Sprinkler SystemsSOFIA KAPELYANspecial
12/15/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
12/13/2023Sprinkler SystemsSOFIA KAPELYANspecial
12/13/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
08/31/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
08/31/2023Sprinkler SystemsSOFIA KAPELYANspecial
08/22/2023FinalSOFIA KAPELYANprogress
08/22/2023Mechanical SystemsJEFF AKERMANspecial
08/22/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
08/22/2023Maintenance informationJEFF AKERMANenergy_progress
08/22/2023HVAC-R and service water heating system controlsJEFF AKERMANenergy_progress
08/22/2023HVAC-R and service water piping design and insulationJEFF AKERMANenergy_progress
08/22/2023HVAC-R and service water heating equipmentJEFF AKERMANenergy_progress
08/22/2023Energy Code Compliance InspectionsJEFF AKERMANprogress
08/17/2023Interior lighting powerJEFF AKERMANenergy_progress
08/17/2023Air barrier - visual inspectionJEFF AKERMANenergy_progress
08/17/2023Insulation placement and R valuesJEFF AKERMANenergy_progress
08/17/2023Fenestration and door U-factor and product ratingsJEFF AKERMANenergy_progress
08/17/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
08/17/2023Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
08/17/2023FinalSOFIA KAPELYANprogress
08/17/2023Energy Code Compliance InspectionsJEFF AKERMANprogress
08/17/2023Fire-Resistance Rated ConstructionJEFF AKERMANprogress
08/17/2023Fenestration air leakageJEFF AKERMANenergy_progress
08/16/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
Latest 25 of 90.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/31/2026B00663047-I1Request digital key ↗
08/31/2026B00693424-I1Request digital key ↗
08/29/2026B00730417-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications105
▸DOB NOWProgress Inspector Seal & Signature50
08/31/2026B00668705-I1Open ↗
08/31/2026B00668705-I1Open ↗
08/31/2026B00668705-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/27/2026B00730417-P2Open ↗
09/27/2026B00730417-P2Open ↗
09/01/2026B00730417-P3Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/31/2026B00663047-I1Open ↗
08/31/2026B00693424-I1Open ↗
08/29/2026B00730417-P3Open ↗
Showing 3 of 17 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/31/2026B00693424-I1Open ↗
08/29/2026B00730417-P3Open ↗
08/29/2026B00730417-P2Open ↗
Showing 3 of 16 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/29/2026B00648694-I1Open ↗
08/13/2026B00668705-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/28/2026B00655531-P1Open ↗
08/15/2026B00655531-I1Open ↗
08/13/2026B00655531-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00655531-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00655531-I1Open ↗