DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB06/01/1994V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB06/01/1993V-DOB VIOLATION - ACTIVE
ECB09/15/2017AS PER CLASS 2 (B265)28-303.7 FAILURE TO FILE A COMPLETE INITIAL INSPECTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT INITIAL INSPECTION REPORT.Nothing owed — awaiting certificate of correction
ECB11/13/1995WORK WITHOUT A PERMIT. WORK NOTED: WALL AND PARTITIONS IN BASEMENT AND1ST FLOOR AREA SHEETROCK & H.V.A.C. DUCT WORK 1ST & BASEMENT FLOOR AS WELL REMEDY: OBTAIN A PERMIT.Nothing owed — awaiting certificate of correction
ECB10/12/1994WORK WITHOUT A PERMIT IN THAT:ERECTING PARITIONS AT THE BASEMENT AND FIRST FLOOR 2. STUDS TRO RECIEVE SHEET AND ROCK. 3. H.V.A.C. DUCT AND VENTS AT BSMT AND FIRST FL NOTE:ITEM NO.2 AT SECOND FLOOR. REMEDY:STOPNothing owed — awaiting certificate of correction
ECB06/23/1993FAILURE TO MAINTAIN EXTERIOR BUILDING WALL WEST EXTERIOR MASONRY WALL IS BULGING AND SEPARATING FROM STRUCTURE FROM 2ND STORY TO ROOF. EROD-ED AND MISSING MOTAR JOINTS ON THE ENTIRE WEST WALL.Nothing owed — awaiting certificate of correction