← Back
BuildNYC
One family attached or semi-detached
164 DUPONT STREET
BROOKLYN · Greenpoint · BIN 3063850
💬 Discuss this project
1901Year Built
1Stories
A5Building Class
R6AZoning
650 sfGross Floor Area
1Units
One family attached or semi-detached · 2,500 sf lot · 0.26 FAR built · Flood zone X500
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing · 20 docs
Floor 1Unit 1N, Unit 1S1 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Blank Property Group309/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/17/2025$3.1M—Private party → 164 DUPONT STREET LLC$4,769/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XC Engineering405/20/2026
Brian McDonough, PE303/26/2026
James Cleary Architecture109/16/2025
Building Lifecycle
10/27/2026
Objection raised — Other
07/31/2026
Objection raised — Other
06/23/2026
Objection raised — Other
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/15/2026
Objection resolved — Resolved
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 05/20/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
05/20/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 05/20/2026
Sprinkler System
FiledStatusContractorScope
05/20/2026——Sprinkler System
1 project · most recent 05/20/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/20/2026——Storm, Water/Sanitary
1 project · most recent 05/20/2026
Steel Masonry
FiledStatusContractorScope
05/20/2026——Steel, Masonry
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
06/18/2026Structural Stability – Alterations of existing buildings—special
04/30/2026Lowest Floor Elevation—progress
04/30/2026Final—progress
04/30/2026Structural Steel - Details—special
04/30/2026Masonry—special
04/30/2026Structural Cold-Formed Steel—special
04/30/2026Structural Steel - Welding—special
04/30/2026Structural Steel - High Strength Bolting—special
04/30/2026Post-installed Anchors—special
04/30/2026Structural Stability – Alterations of existing buildings—special
04/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
04/30/2026Subgrade Inspections—special
04/30/2026Excavations - Sheeting, Shoring, and Bracing—special
04/30/2026Footing and Foundation—progress
04/30/2026Final—progress
04/30/2026Lowest Floor Elevation—progress
04/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
04/30/2026Subsurface Investigations (Borings/Test Pits)—special
04/30/2026Structural Stability – Alterations of existing buildings—special
04/30/2026Concrete - Cast-In-Place—special
03/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/26/2026Fire-Resistant Penetrations and Joints—special
03/26/2026Lowest Floor Elevation—progress
03/26/2026Energy Code Compliance Inspections—progress
03/26/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 60.
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account