← Back
Two family frame
164 LAKE AVENUE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5026774
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R3AZoning
1,824 sfGross Floor Area
2Units
Two family frame · 5,700 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 3 filings · 20 docs
Floor 33p · 2 filings · 18 docs
Floor 2
Floor 1
Cellar5p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AFM INSPECTIONS & ENGINEERING, PLLC106/21/2021
CM ARCHITECTURE PLLC206/08/2021
LEVIN ENGINEERING PLLC205/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRISE PARTNERS603/21/2026
LEVIN ENGINEERING PLLC403/21/2026
Building Lifecycle
All (42)Filed (5)Objection (7)Special Inspection (30)
07/06/2021
Objection raised — Admin
06/21/2021
Filed — Alteration CO
STRUCTURAL WORK RELATED TO VERTICAL ENLARGEMENT AND INTERIOR RENOVATIONS. NO CHANGE IN USE, EGRESS, OR OCCUAPNCY UNDER THIS APPLICATION.
S00531745-S1
06/18/2021
Objection raised — Scope
06/18/2021
Objection resolved — Addressed
06/16/2021
Objection raised — Scope
06/10/2021
Special inspection requirement — Structural Wood Frame
06/10/2021
Special inspection requirement — Subgrade Inspections
06/10/2021
Special inspection requirement — Concrete - Cast-In-Place
06/09/2021
Special inspection requirement — Final
06/09/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/08/2021
Filed — Alteration CO
STRUCTURAL WORK RELATED TO VERTICAL ENLARGEMENT AND INTERIOR RENOVATIONS. NO CHANGE IN USE, EGRESS, OR OCCUAPNCY UNDER THIS APPLICATION.
S00531745-I1
06/02/2021
Objection raised — Scope
06/02/2021
Objection resolved — Addressed
06/01/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
06/01/2021
Special inspection requirement — Fenestration air leakage
06/01/2021
Special inspection requirement — Fenestration areas
06/01/2021
Special inspection requirement — Air barrier - visual inspection
06/01/2021
Special inspection requirement — Insulation placement and R values
06/01/2021
Special inspection requirement — Metering
06/01/2021
Special inspection requirement — Lighting in dwelling units
06/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/01/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Kevin Feath
06/01/2021
Special inspection requirement — Fire-Resistance Rated Construction
06/01/2021
Special inspection requirement — Energy Code Compliance Inspections
05/26/2021
Filed — Alteration
INSTALLATION OF MECHICAL SYSTEM FOR TWO FAMILY DWELLING IN CONJUNCTION WITH DOBNOW APPLICATION #S00502431. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00527529-I1
05/25/2021
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR A TWO FAMILY DWELLING IN CONJUNCTION WITH S00531745 . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00522545-I1
05/24/2021
Objection raised — Scope
05/24/2021
Special inspection requirement — Final
05/24/2021
Special inspection requirement — HVAC-R and service water heating equipment
05/24/2021
Special inspection requirement — Ventilation and air distribution system
05/24/2021
Special inspection requirement — Maintenance information
05/24/2021
Special inspection requirement — HVAC-R and service water heating system controls
05/24/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
05/24/2021
Special inspection requirement — Duct leakage testing, insulation and design
05/24/2021
Special inspection requirement — Mechanical Systems
05/13/2021
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR, NEW VERTICAL EXTENSION @ PROPOSED 3RD FLOOR. No change in use, egress, or occupancy under this application.
S00502431-I1
05/05/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/04/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/12/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
04/12/2021
Special inspection requirement — Fenestration air leakage
04/12/2021
Special inspection requirement — Metering
Nothing on file for this building.
1 project · most recent 05/26/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/26/2021——Air Conditioning Systems
Cooling
Trane XR17048B1000A 4 tons · Heat Pump Outdoor ×2
1 project · most recent 05/25/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/25/2021——Gas, Storm, Water/Sanitary
1 project · most recent 06/21/2021
Concrete Wood
FiledStatusContractorScope
06/21/2021——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
06/10/2021Structural Wood Frame—progress
06/10/2021Subgrade Inspections—special
06/10/2021Concrete - Cast-In-Place—special
06/09/2021Final—progress
06/09/2021Structural Stability – Alterations of existing buildings—special
06/01/2021Fenestration and door U-factor and product ratings—energy_progress
06/01/2021Fenestration air leakage—energy_progress
06/01/2021Fenestration areas—energy_progress
06/01/2021Air barrier - visual inspection—energy_progress
06/01/2021Insulation placement and R values—energy_progress
06/01/2021Metering—energy_progress
06/01/2021Lighting in dwelling units—energy_progress
06/01/2021Structural Stability – Alterations of existing buildings—special
06/01/2021Fire-Resistant Penetrations and Joints—special
06/01/2021Subsurface Investigations (Borings/Test Pits)Kevin Feathspecial
06/01/2021Fire-Resistance Rated Construction—progress
06/01/2021Energy Code Compliance Inspections—progress
05/24/2021Final—progress
05/24/2021HVAC-R and service water heating equipment—energy_progress
05/24/2021Ventilation and air distribution system—energy_progress
05/24/2021Maintenance information—energy_progress
05/24/2021HVAC-R and service water heating system controls—energy_progress
05/24/2021HVAC-R and service water piping design and insulation—energy_progress
05/24/2021Duct leakage testing, insulation and design—energy_progress
05/24/2021Mechanical Systems—special
Latest 25 of 37.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026S00522545-P1Request digital key ↗
08/25/2026S00522545-I1Request digital key ↗
08/15/2026S00502431-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00502431-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026S00531745-S1Open ↗
09/01/2026S00531745-S1Open ↗
08/30/2026S00531745-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026S00531745-S1Open ↗
09/01/2026S00531745-S1Open ↗
09/01/2026S00531745-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026S00502431-I1Open ↗
08/25/2026S00522545-I1Open ↗
08/25/2026S00527529-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026S00502431-I1Open ↗
▸Other Documents2
▸DOB NOWPlot Diagram1
08/13/2026S00502431-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00502431-I1Open ↗