← Back
BuildNYC
Walk-up apt, over six families with stores
1640 3RD AVENUE
MANHATTAN · BIN 1078536
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C1-9Zoning
44,239 sfGross Floor Area
75Units
Rent Stabilized12 Active Violations ▸
Walk-up apt, over six families with stores · Owner of record: 172 East 92nd Street · 11,025 sf lot · 4.01 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofC-SOYU Interior21p · 3 filings · 20 docs
Floor 6Emergency light and exit sign installation1p · 1 filing · 18 docs
Floor 5Emergency light and exit sign installation1p · 1 filing · 18 docs
Floor 4Emergency light and exit sign installation1p · 1 filing · 18 docs
Floor 3Emergency light and exit sign installation1p · 1 filing · 18 docs
Floor 2Emergency light and exit sign installation1p · 1 filing · 18 docs
Floor 1C-SOYU Interior27p · 4 filings · 20 docs
CellarC-SOYU Interior6p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
172 E 92nd Street1303/21/2026
1638 Pizza903/22/2026
Kerman Company503/21/2026
Kamran Company503/21/2026
EL-Kam Realty303/21/2026
Starbucks103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BL Consultant306/12/2024
SY Engineering201/27/2023
New Age112/20/2022
Talal Alokush PE109/22/2022
Issa Khorasanchi P.E205/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Design Studio603/21/2026
Leekodesign203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Katan P & HPlumbing1207/08/2026
American Ventilation Servicespecialty_contractor507/08/2026
Morell BuildersGeneral Contractor303/21/2026
Symmetrical ConstructionGeneral Contractor307/08/2026
County Electrical Contractor IElectrical203/21/2026
Aljer Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252306/12/2024
SY Engineering5149101/27/2023
Soyu Architecture7399101/13/2023
New Age Engineering7746212/20/2022
Building Lifecycle
All (74)Filed (9)Permit Issued (10)Violation (13)Inspection (11)Objection (4)Special Inspection (27)
01/29/2026
Violation issued (HPD, closed)
A
08/07/2024
Permit issued — Mechanical Systems
M01054572-S2-MS
08/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/05/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
08/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/26/2024
Permit issued — Plumbing
M01054572-S1-PL
07/03/2024
Permit issued — General Construction
M01054572-I1-GC
06/13/2024
Objection raised — Scope
06/13/2024
Objection resolved — Addressed
06/13/2024
Objection raised — Energy
06/13/2024
Objection resolved — Addressed
06/12/2024
Filed — Alteration
M01054572-S2
06/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
06/04/2024
Filed — Alteration
M01054572-S1
06/03/2024
Filed — Alteration
M01054572-I1
06/02/2024
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
06/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
05/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
05/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
05/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
05/21/2024
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
05/21/2024
Special inspection requirement — Final
NAVEEN KUMAR
05/21/2024
Special inspection requirement — Final
NAVEEN KUMAR
04/16/2024
Violation issued (HPD, closed)
A
12/21/2023
Violation issued (HPD, closed)
C
12/21/2023
Violation issued (HPD, closed)
C
06/27/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2023
Permit issued — Plumbing
M08050450-S1-PL
02/08/2023
Permit issued — Plumbing
M00516090-I1-PL
02/06/2023
Permit issued — Mechanical Systems
M00390967-I1-MS
01/27/2023
Filed — Alteration
RENOVATION OF EXISTING STORE, INCLUDING INSTALLATION OF PARTITION, S/S KITCHEN HOOD AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
M08050450-S1
01/27/2023
Permit issued — General Construction
M08050450-I1-GC-CX
01/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
SUNGBOM YI
01/13/2023
Filed — Alteration
RENOVATION OF EXISTING STORE, INCLUDING INSTALLATION OF PARTITION, S/S KITCHEN HOOD AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
M08050450-I1
12/20/2022
Filed — Alteration
REPLACE COMMERCIAL KITCHEN EXHAUST FAN AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00390967-P1
12/20/2022
Special inspection requirement — Final
Stephen Shishko
12/20/2022
Special inspection requirement — Electrical motors
Stephen Shishko
12/20/2022
Special inspection requirement — Mechanical Systems
Stephen Shishko
12/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
YOUNGSAM YU
12/07/2022
Special inspection requirement — Tenant Protection Plan Compliance
YOUNGSAM YU
12/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
YOUNGSAM YU
12/07/2022
Special inspection requirement — Fenestration areas
YOUNGSAM YU
12/07/2022
Special inspection requirement — Duct leakage testing, insulation and design
YOUNGSAM YU
12/07/2022
Special inspection requirement — Air barrier - visual inspection
YOUNGSAM YU
12/07/2022
Special inspection requirement — Fenestration air leakage
YOUNGSAM YU
12/06/2022
Special inspection requirement — Final
SUNGBOM YI
12/06/2022
Special inspection requirement — Mechanical Systems
YOUNGSAM YU
11/03/2022
Violation issued (HPD, closed)
I
10/19/2022
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
09/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
TALAL ALOKUSH
09/22/2022
Filed — Alteration
INSTALLATION OF PLUMBIN FIXTUERS AND GAS COOKING EQUIPEMENT.
M00516090-P2
09/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
TALAL ALOKUSH
08/02/2022
Inspection — Fail-Final PL - More than 10 Requested Floors
Fail
View inspection ↗
06/30/2022
Permit issued — Mechanical Systems
M00390967-I1-MS
06/29/2022
Permit issued — Plumbing
M00516090-I1-PL
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSymmetrical Construction08/07/2024
DOB NOWPlumbingSigned-offKatan P & H07/26/2024
DOB NOWGeneral ConstructionPermit IssuedSymmetrical Construction07/03/2024
DOB NOWPlumbingPermit IssuedKatan P & H02/10/2023
DOB NOWPlumbingSigned-offKatan P & H02/08/2023
DOB NOWMechanical SystemsPermit IssuedAmerican Ventilation Service02/06/2023
DOB NOWGeneral ConstructionPermit IssuedMorell Builders01/27/2023
DOB NOWMechanical SystemsPermit IssuedAmerican Ventilation Service06/30/2022
DOB NOWPlumbingSigned-offAljer Plumbing & Heating06/29/2022
DOB NOWMechanical SystemsPermit IssuedAmerican Ventilation Service10/22/2020
BISOTISSUEDAmerican Ventilation Service06/21/2022
BISOTISSUEDNova Vasquez & Associates08/04/2021
BISPLISSUEDClean Tech Mechanical09/14/2018
BISOTISSUEDBuckingham Trading Partners09/14/2018
BISPLISSUEDLandmark Plumbing & Heating05/01/2018
BISSPISSUEDBig Apple Fire Sprinkler Co I01/04/2018
BIS—ISSUEDBuckingham Trading Partners10/04/2017
BISOTISSUEDAP-Tech Contracting08/28/2017
BISOTISSUEDAP-Tech Contracting08/28/2017
BISOTRE-ISSUEDAP-Tech Contracting06/09/2017
BISOTRE-ISSUEDAP-Tech Contracting06/09/2017
BISOTISSUEDBuckingham Trading Partners10/04/2016
BISOTISSUEDBuckingham Trading Partners10/04/2016
BIS—ISSUEDBuckingham Trading Partners10/04/2016
BISOTISSUEDBuckingham Trading Partners08/15/2016
BISOTISSUEDBuckingham Trading Partners08/15/2016
BISEQISSUEDBuckingham Trading Partners08/15/2016
BISPLISSUEDTW Plumbing & Heating01/28/2016
BISSPISSUEDBig Apple Fire Sprinkler Co I01/26/2016
BISPLISSUEDTW Plumbing & Heating01/26/2016
BIS—ISSUEDBuckingham Trading Partners01/26/2016
BISOTISSUEDPlus K Construction05/20/2014
BISFPISSUEDNY Fire10/16/2013
BISPLISSUEDI Do Plumbing & Heating08/19/2013
BIS—ISSUEDUnitech Design08/12/2013
BISOTISSUEDPlus K Construction06/10/2013
BISOTISSUEDMond Design Assoicates03/04/2008
BISOTISSUEDUltimate Signs & Designs Co04/07/1998
BIS—ISSUEDUltimate Signs & Designs Co04/02/1998
BIS—ISSUEDUltimate Signs & Designs Co03/20/1998
+ 7 more permits on file
2 projects · most recent 01/27/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/27/2023Permit IssuedMorell BuildersVentilation Systems
Ventilation
Dayton ×2
12/20/2022Permit IssuedAmerican Ventilation ServiceVentilation Systems
Ventilation
Twin City Fan BCVR-182 6,528 CFM · Exhaust Fan ×4
1 project · most recent 09/22/2022
Gas Water/Sanitary
FiledStatusContractorScope
09/22/2022Signed-offKatan P & HGas, Water/Sanitary
3 projects · most recent 11/13/2025
General Wiring Lighting
FiledStatusContractorScope
11/13/2025Permit IssuedCounty Electrical Contractor I—
06/27/2024CompleteJong Hyun Kim—
04/30/2024Permit IssuedBDS ElectricGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
08/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/19/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/02/2022Fail-Final PL - More than 10 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/12/2024Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
06/02/2024Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
06/02/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
05/23/2024Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
05/23/2024Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
05/23/2024Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
05/21/2024Mechanical SystemsINDARDEO PARBHUNATHspecial
05/21/2024FinalNAVEEN KUMARprogress
05/21/2024FinalNAVEEN KUMARprogress
01/25/2023Tenant Protection Plan ComplianceSUNGBOM YIspecial
12/20/2022FinalStephen Shishkoprogress
12/20/2022Electrical motorsStephen Shishkoenergy_progress
12/20/2022Mechanical SystemsStephen Shishkospecial
12/07/2022Structural Stability – Alterations of existing buildingsYOUNGSAM YUspecial
12/07/2022Tenant Protection Plan ComplianceYOUNGSAM YUspecial
12/07/2022Fire-Resistant Penetrations and JointsYOUNGSAM YUspecial
12/07/2022Fenestration areasYOUNGSAM YUenergy_progress
12/07/2022Duct leakage testing, insulation and designYOUNGSAM YUenergy_progress
12/07/2022Air barrier - visual inspectionYOUNGSAM YUenergy_progress
12/07/2022Fenestration air leakageYOUNGSAM YUenergy_progress
12/06/2022FinalSUNGBOM YIprogress
12/06/2022Mechanical SystemsYOUNGSAM YUspecial
09/23/2022HVAC-R and service water piping design and insulationTALAL ALOKUSHenergy_progress
09/20/2022HVAC-R and service water piping design and insulationTALAL ALOKUSHenergy_progress
04/29/2021Electrical motorsStephen Shishkoenergy_progress
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
C-SOYU InteriorRestaurant / Food ServiceCellar, Floor 1, Roof
Project M08050450 Alteration · Permit Entire · 01/13/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 340 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
09/01/2026M00516090-I1Request digital key ↗
09/01/2026M00516090-P2Request digital key ↗
09/01/2026M08050450-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026M00390967-P1Request digital key ↗
09/01/2026M00390967-I1Request digital key ↗
▸Applications & Permits78
▸BISPLAN / WORK APPROVAL APPLICATION48
01/11/2023140997599Open ↗
01/25/2021140997599Open ↗
08/19/2019140082620Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION27
06/23/2022140997599Open ↗
08/04/2021140997599Open ↗
08/13/2019140082620Open ↗
Showing 3 of 27 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1132
07/29/2019100355116Open ↗
07/29/2019100344272Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/30/2017122457304Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT I: CERTIFICATION1
09/06/2016122457304Open ↗
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
09/30/2019140082620Open ↗
07/25/2019140082620Open ↗
07/10/2019140082620Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M01054572-S1Open ↗
09/01/2026M08050450-I1Open ↗
09/01/2026M08050450-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M01054572-S1Open ↗
09/02/2026M01054572-S1Open ↗
09/01/2026M08050450-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026M00516090-P2Open ↗
09/01/2026M00516090-I1Open ↗
09/01/2026M00390967-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
01/25/2021140997599Open ↗
09/17/2018123451013Open ↗
06/09/2017122660101Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/17/2018123451013Open ↗
06/09/2017122660101Open ↗
04/25/2017122660101Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/25/2021140997599Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/25/2021140997599Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
06/01/2017122660101Open ↗
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
08/19/2019140082620Open ↗
08/14/2019140082620Open ↗
07/25/2019140082620Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes3
09/17/2018123451013Open ↗
08/19/2016122660101Open ↗
07/14/2016122457304Open ↗
▸BISSTREET TREE CHECKLIST2
01/16/2019122457304Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00390967-P1Open ↗
08/13/2026M00390967-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
08/04/2021140997599Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026M00516090-I1Open ↗
09/01/2026M00516090-P2Open ↗
09/01/2026M00390967-P1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
01/25/2021140997599Open ↗
09/17/2018123451013Open ↗
Showing 2 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
09/30/2019140082620Open ↗
07/25/2019140082620Open ↗
07/10/2019140082620Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/30/2019140082620Open ↗
12/21/2018122457304Open ↗
04/23/2018122660101Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/04/2021140997599Open ↗
01/25/2021140997599Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/25/2021140997599Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/04/2021140997599Open ↗
01/25/2021140997599Open ↗
Showing 2 of 3 on file for this type
▸Approvals, Objections & Sign-offs35
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
11/22/2019122457304Open ↗
11/15/2019122457304Open ↗
10/04/2019122457304Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
06/22/2022140997599Open ↗
10/04/2019122457304Open ↗
10/04/2019122457304Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/14/2016122457304Open ↗
Showing 1 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER1
08/13/2019140082620Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
06/13/2018122660058Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT24
01/25/2021140997599Open ↗
09/30/2019140082620Open ↗
01/16/2019122457304Open ↗
Showing 3 of 24 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
11/27/2017122660101Open ↗
▸Filing & Intake Forms57
▸BISBOROUGH INTAKE FORM30
11/22/2019122457304Open ↗
11/15/2019122457304Open ↗
10/04/2019122457304Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION16
08/26/2019140082620Open ↗
07/25/2019140082620Open ↗
08/21/2018122457304Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET9
09/17/2018123451013Open ↗
08/19/2016122660101Open ↗
08/19/2016122660101Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/25/2021140997599Open ↗
Showing 1 of 2 on file for this type
▸Other Documents4
▸BISPLOT DIAGRAM3
10/04/2019122457304Open ↗
07/14/2016122457304Open ↗
Showing 2 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type