ECB02/26/2026OBSERVED AT EXP 2 ELECTRICAL SERVICE METERS AND MAST ARE DETACHED FROM HOUSE TO INSTALL VINYL SIDING. ONLY 1 STRAP AT TOP BY ELBOW IS NOW SUPPORTING THE ENTIRE SERVICE. POTENTIAL FOR ENTRIE SERVICE TO FALL. PRE$2K due
ECB02/26/2026OBSERVED ELECTRICAL WIRES PROTRUDING FROM FACADE OF EXP 2 OVER NEW ENTRY DOORS. ALSO IN CELLAR WHITE ROMEX WIRES COILED UP HANGING. NO PERMIT ON FILE. OBSERVED 11:30AM. WORK 50% COMPLETE., OBTAIN PERMIT$2K due
ECB02/26/2026EXTERIOR HAS BEEN ALTERED. FRONT PORCH FULLY ENCLOSED WITH WALLS AND WINDOWS. EXP 2 SIDE DOORS RELOCATED. WINDOWS LOCATIONS AND NUMBER CHANGED. 6 CHANGED TO 4. EXP 3 OPEN PORCH FULLY ENCLOSED WITH WALLS AND WIN$2K due
DOB02/26/2026UNPERMITTED/UNDOCUMENTED STRUCTURAL UNDERPINNING IN CELLAR. STRUCTURAL INTEGRITY IN QUESTION. WITH NO STRUCTURAL DETAIL/DRAWINGS/PERMITS FILED AS PER CODE. ENGINEERS REPORT FOR STRUCTURAL STABILITY REQUIRED.
ECB02/26/2026UNPERMITTED/UNDOCUMENTED STRUCTURAL UNDERPINNING OF FOUNDATION IN CELLAR. OBSERVED NEW CONCRETE AND FOUNDATION HAUNCH AT PERIMETER OF EXISITNG BRICK FOUNDATION., OBTAIN PERMIT$2K due
ECB07/08/2026OBSERVED ADDITIONAL ELECTRICAL WORK AGAINST STOP WORK ORDER ISSUED ON 2/26/26 COMP#5194965. PRIOR H3 CITING ELECTRICAL ON 3/26/26 COMP #5195435. CURRENT ELEC WORK CONSISTS OR 2 EXTERIOR LIGHTS AT EXP 2. ALSO MIHearing held — result not yet published$25K proposed
ECB03/26/2026OBSVD CONST AND ELEC WORK AGAINST FSWO ISSUED ON 2/26/26 PER COMPLAINT# 5194965. SWO INCL GENERAL CONSTRUCTION AND ELECTRICAL. POSTED TO FRONT ENTRY DOOR EXP 1. 3 ELECTRCIANS INSTALLING NEW SERVICE METER PANS (Hearing held — result not yet published$10K proposed
ECB03/26/2026FULL STOP WORK ORDER POSTED TO THE FRONT ENTRY DOOR EXP 1 ON 2/26/26 IN REF TO COMPLAINT # 5194965 IS NO LONGER POSTED. DOT PERMITS POSTED IN ITS PLACE. REPOSTED NOTICE # OP-71-26-00225, COMPLY WITH CODEHearing held — result not yet published$5K proposed