← Back
Two family frame
1641 NEW YORK AVENUE
BROOKLYN · East Flatbush-Farragut · BIN 3205992
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R6Zoning
1,824 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,000 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
Structural
Floor 11 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INC BVC CONSULTING 1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/14/2014$525K—— → —$288/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUIS PICHARDO, PE108/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAB CONSULTING SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HALAL BUILDING & CONSTRU*General Contractor303/21/2026
BVC CONSULTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369108/12/2021
Building Lifecycle
All (18)Filed (1)Permit Issued (2)Signed Off (1)Violation (3)Inspection (1)Objection (10)
05/15/2023
Signed off — Alteration
GENERAL CONSTRUCTION TO RESPOND THE VIOLATION#35560130L. WORK WILL INCLUDE NEW WOOD RAFTER ABOVE EXISTING COLUMNS, NEW WOOD JOIST STRUCTURAL POCKET AT 1ST FLR BALCONY/CANOPY. BRICK POINTING AS NEEDED AT EXPOSURE 1 AS PER PLANS. NO CHANGE IN USE EGRESS OR
B00574526-I1
05/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/25/2022
Violation issued (ECB, closed)
Construction
05/02/2022
Permit issued — Structural
B00574526-I1-GC-CX
09/09/2021
Permit issued — Structural
B00574526-I1-GC-CX
08/17/2021
Objection raised — Accessibility
08/17/2021
Objection resolved — Addressed
08/17/2021
Objection raised — Other
08/17/2021
Objection resolved — Addressed
08/17/2021
Objection raised — Other
08/17/2021
Objection resolved — Addressed
08/17/2021
Objection raised — Other
08/17/2021
Objection resolved — Addressed
08/17/2021
Objection raised — Scope
08/17/2021
Objection resolved — Addressed
08/12/2021
Filed — Alteration
GENERAL CONSTRUCTION TO RESPOND THE VIOLATION#35560130L. WORK WILL INCLUDE NEW WOOD RAFTER ABOVE EXISTING COLUMNS, NEW WOOD JOIST STRUCTURAL POCKET AT 1ST FLR BALCONY/CANOPY. BRICK POINTING AS NEEDED AT EXPOSURE 1 AS PER PLANS. NO CHANGE IN USE EGRESS OR
B00574526-I1
03/31/2021
Violation issued (ECB, closed)
Construction
03/27/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBVC CONTRACTING LLC05/02/2022
DOB NOWStructuralSigned-offHALAL BUILDING & CONSTRU*09/09/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B00574526-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00574526-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00574526-I1Open ↗