← Back
One story retail building
1645 PITKIN AVENUE
BROOKLYN · BIN 3080741
💬 Discuss this project
1930Year Built
1Stories
K1Building Class
C4-3Zoning
10,400 sfGross Floor Area
1Units
9 Open Violations ▸FDNY Report ↗
One story retail building · Owner of record: 1645 PITKIN INC · 10,850 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1p · 2 filings · 20 docs
Floor 14p · 2 filings · 14 docs
Cellar10p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
200 EAST 16TH STREET HOUSING COR103/21/2026
MCDONALDS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP1003/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
4444 PPPP CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHIMENTI CONSTRUCTION COGeneral Contractor907/08/2026
NATIONAL MAINTENANCEScaffold207/08/2026
NOVA ELECTRIC LLCElectrical103/22/2026
MACKLER MASTER FIRE INCFire Protection107/08/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423808/24/2022
Building Lifecycle
All (83)Filed (13)Permit Issued (11)Signed Off (8)Violation (16)Inspection (5)Special Inspection (30)
10/20/2023
Signed off — Alteration
Construction fence at the sidewalk to protect the construction area and provide enclosure to the building storefront.
B00732534-I1
08/02/2023
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN ON BRISTOL AVE STOREFRONT ELEVATION FOR JD SPORTS.
B00744561-I1
08/02/2023
Signed off — Alteration
ERECT 2 ILLUMINATED ACCESSORY BUSINESS WALL SIGNS FOR JD SPORTS ON PITKIN AVE.
B00744540-I1
08/01/2023
Violation issued (FDNY_NOV, closed)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/20/2023
Signed off — Alteration
SPRINKLER MODIFICATIONS ON THE CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY
B00732038-I1
02/09/2023
Signed off — Alteration
B00669743-I1
02/09/2023
Signed off — Alteration
B00669729-I1
02/09/2023
Signed off — Alteration
Mechanical modifications on the cellar, 1st floor and roof as per plans filed herewith. No change to use egress or occupancy.
B00669735-I1
02/08/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/07/2023
Signed off — Alteration
Plumbing modifications on the cellar and 1st floor as per plans filed herewith. No change to use, egress or occupancy.
B00669740-I1
01/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/25/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/15/2022
Special inspection requirement — Structural Steel - Welding
Young Suh
09/15/2022
Special inspection requirement — Structural Wood Frame
Young Suh
09/15/2022
Special inspection requirement — Final
Young Suh
09/15/2022
Special inspection requirement — Structural Cold-Formed Steel
Young Suh
09/15/2022
Special inspection requirement — Masonry
Young Suh
09/15/2022
Special inspection requirement — Structural Steel - Details
Young Suh
09/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
09/15/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
09/11/2022
Special inspection requirement — Ventilation and air distribution system
Young Suh
09/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
09/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
09/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
09/11/2022
Special inspection requirement — Shutoff dampers
Young Suh
09/11/2022
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
09/09/2022
Special inspection requirement — Metering
Young Suh
09/09/2022
Special inspection requirement — Interior lighting power
Young Suh
09/09/2022
Special inspection requirement — Lighting controls
Young Suh
09/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/24/2022
Filed — Alteration
B00669743-P1
08/23/2022
Filed — Alteration
B00669729-P1
08/12/2022
Special inspection requirement — Post-installed Anchors
Young Suh
08/12/2022
Special inspection requirement — Sprinkler Systems
Young Suh
08/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/11/2022
Filed — Alteration
SPRINKLER MODIFICATIONS ON THE CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY
B00732038-P1
07/28/2022
Special inspection requirement — Structural Cold-Formed Steel
Young Suh
07/28/2022
Special inspection requirement — Sprinkler Systems
Young Suh
07/28/2022
Special inspection requirement — Post-installed Anchors
Young Suh
07/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
07/28/2022
Special inspection requirement — Masonry
Young Suh
07/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/28/2022
Special inspection requirement — Interior lighting power
Young Suh
07/28/2022
Special inspection requirement — Metering
Young Suh
07/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2022
Filed — Alteration
Plumbing modifications on the cellar and 1st floor as per plans filed herewith. No change to use, egress or occupancy.
B00669740-P1
07/19/2022
Filed — Alteration
Mechanical modifications on the cellar, 1st floor and roof as per plans filed herewith. No change to use egress or occupancy.
B00669735-P1
06/29/2022
Permit issued — General Construction
B00669729-I1-GC
06/29/2022
Permit issued — Structural
B00669743-I1-ST
06/29/2022
Permit issued — Mechanical Systems
B00669735-I1-MS
06/23/2022
Permit issued — Sign
B00744540-I1-SG
06/17/2022
Filed — Alteration
ERECT 2 ILLUMINATED ACCESSORY BUSINESS WALL SIGNS FOR JD SPORTS ON PITKIN AVE.
B00744540-I1
06/13/2022
Permit issued — Sign
B00744561-I1-SG
06/08/2022
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN ON BRISTOL AVE STOREFRONT ELEVATION FOR JD SPORTS.
B00744561-I1
06/08/2022
Permit issued — Sprinklers
B00732038-I1-EW-SP
05/19/2022
Filed — Alteration
SPRINKLER MODIFICATIONS ON THE CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY
B00732038-I1
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO06/29/2022
DOB NOWStructuralSigned-offSCHIMENTI CONSTRUCTION CO06/29/2022
DOB NOWMechanical SystemsSigned-offSCHIMENTI CONSTRUCTION CO06/29/2022
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC06/23/2022
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC06/13/2022
DOB NOWSprinklersSigned-offMACKLER MASTER FIRE INC06/08/2022
DOB NOWConstruction FenceSigned-offSCHIMENTI CONSTRUCTION CO05/09/2022
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC04/21/2022
DOB NOWMechanical SystemsSigned-offSCHIMENTI CONSTRUCTION CO03/30/2022
DOB NOWStructuralSigned-offSCHIMENTI CONSTRUCTION CO03/25/2022
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO03/22/2022
BISPLISSUEDAURORA P & H CONT INC08/18/1998
BISBLISSUEDAURORA P & H CONT INC08/18/1998
BIS—ISSUEDVARDARO CONSTR04/03/1991
4 projects · most recent 06/22/2022
General Wiring
FiledStatusContractorScope
06/22/2022CompleteRAINBOW ELECTRIC CO., INC—
06/22/2022CompleteRAINBOW ELECTRIC CO., INC—
06/22/2022CompleteRAINBOW ELECTRIC CO., INC—
04/12/2022CompleteNOVA ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/08/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
09/15/2022Structural Steel - WeldingYoung Suhspecial
09/15/2022Structural Wood FrameYoung Suhprogress
09/15/2022FinalYoung Suhprogress
09/15/2022Structural Cold-Formed SteelYoung Suhspecial
09/15/2022MasonryYoung Suhspecial
09/15/2022Structural Steel - DetailsYoung Suhspecial
09/15/2022Structural Stability – Alterations of existing buildingsYoung Suhspecial
09/15/2022Structural Steel - High Strength BoltingYoung Suhspecial
09/11/2022Ventilation and air distribution systemYoung Suhenergy_progress
09/11/2022HVAC-R and service water piping design and insulationYoung Suhenergy_progress
09/11/2022HVAC-R and service water heating equipmentYoung Suhenergy_progress
09/11/2022HVAC-R and service water heating system controlsYoung Suhenergy_progress
09/11/2022Shutoff dampersYoung Suhenergy_progress
09/11/2022Duct leakage testing, insulation and designYoung Suhenergy_progress
09/09/2022MeteringYoung Suhenergy_progress
09/09/2022Interior lighting powerYoung Suhenergy_progress
09/09/2022Lighting controlsYoung Suhenergy_progress
09/09/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
08/12/2022Post-installed AnchorsYoung Suhspecial
08/12/2022Sprinkler SystemsYoung Suhspecial
08/12/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
07/28/2022Structural Cold-Formed SteelYoung Suhspecial
07/28/2022Sprinkler SystemsYoung Suhspecial
07/28/2022Post-installed AnchorsYoung Suhspecial
07/28/2022Fire-Resistant Penetrations and JointsYoung Suhspecial
Latest 25 of 38.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Jd SportsRetailCellar, Floor 1
Project B00669743 Alteration · LOC Issued · 02/04/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026B00669743-P1Request digital key ↗
08/31/2026B00669743-I1Request digital key ↗
08/31/2026B00669735-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/31/2026B00669743-P1Open ↗
08/31/2026B00669743-I1Open ↗
08/31/2026B00669735-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026B00669729-P1Open ↗
08/25/2026B00669743-I1Open ↗
08/25/2026B00669743-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00744540-I1Open ↗
08/31/2026B00669729-P1Open ↗
08/29/2026B00669735-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/31/2026B00669743-I1Open ↗
08/31/2026B00669743-P1Open ↗
08/31/2026B00669735-P1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00669729-I1Open ↗
08/13/2026B00669735-I1Open ↗