← Back
BuildNYC
Three families
1646 BOGART AVENUE
BRONX · BIN 2044452
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R4-1Zoning
3,276 sfGross Floor Area
3Units
Rent Stabilized6 Active Violations ▸
Three families · Owner of record: 1646 Bogart · 5,000 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 211p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Basement5p · 2 filings · 20 docs
Sub-Basement6p · 2 filings · 20 docs
Site & exterior6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1646 Bogart103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/24/2021$720K—S DECISION LLC → 1646 BOGART LLC$220/sf building
07/29/2020$692K—Private party → S DECISION LLC$211/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering705/22/2024
Billah Engineering109/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J Building Consulting1403/21/2026
Insha Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor407/08/2026
AMC Plumbing, Heating & CLNGPlumbing307/08/2026
Intelogic ElectricElectrical103/22/2026
Kle ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781705/22/2024
Billah Engineering5838109/23/2021
Building Lifecycle
04/29/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/17/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
06/04/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/25/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/18/2024
Signed off — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT EXISTING 2-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X00684807-S1
70 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG02/29/2024
DOB NOWMechanical SystemsSigned-offKle Construction01/11/2024
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG12/13/2022
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG05/12/2022
DOB NOWGeneral ConstructionSigned-offSplen Construction03/02/2022
DOB NOWGeneral ConstructionPermit IssuedSplen Construction10/12/2021
1 project · most recent 03/25/2024
General Wiring
FiledStatusContractorScope
03/25/2024CompleteIntelogic ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/12/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/11/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
05/23/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/23/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/23/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
05/23/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
05/23/2024Air barrier — testing CHRISTIAN LOZADAenergy_progress
05/23/2024Lighting controlsCHRISTIAN LOZADAenergy_progress
05/23/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
05/23/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
05/23/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
05/23/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
05/23/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
05/23/2024Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
05/23/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
01/06/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/06/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/06/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/06/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
01/06/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/06/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
01/06/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
01/06/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
12/23/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
12/23/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
12/23/2023Lighting controlsCHRISTIAN LOZADAenergy_progress
12/23/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
Latest 25 of 50.
40 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account