← Back
BuildNYC
Over six families without stores
1647 HOBART AVENUE
BRONX · BIN 2046068
💬 Discuss this project
1929Year Built
4Stories
C1Building Class
R7-1Zoning
17,340 sfGross Floor Area
21Units
Rent Stabilized2 Active Violations ▸
Over six families without stores · Owner of record: 1647 Hobart · 5,000 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofParapet wall repairs3p · 1 filing · 8 docs
Site & exteriorTemporary pipe scaffold installation7p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chimienti Realty407/08/2026
1647 Hobart203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G R Restivo AIA202/09/2022
Enthink Engineers212/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ferrco Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Metro Contracting NYScaffold407/08/2026
Triera ContractingScaffold303/21/2026
Rose Contractor NYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Meldan Group8100202/09/2022
Building Lifecycle
All (46)Filed (4)Permit Issued (5)Signed Off (1)Violation (34)Special Inspection (2)
02/20/2026
Violation issued (HPD, closed)
B
02/20/2026
Violation issued (HPD, closed)
B
02/20/2026
Violation issued (HPD, closed)
A
02/20/2026
Violation issued (HPD, closed)
A
02/20/2026
Violation issued (HPD, closed)
C
02/20/2026
Violation issued (HPD, closed)
B
02/18/2024
Violation issued (HPD, closed)
C
09/25/2023
Violation issued (HPD, closed)
A
09/25/2023
Violation issued (HPD, closed)
A
09/25/2023
Violation issued (HPD, closed)
C
09/25/2023
Violation issued (HPD, closed)
A
09/06/2023
Violation issued (HPD, open)
C
09/06/2023
Violation issued (HPD, closed)
C
09/06/2023
Violation issued (HPD, closed)
C
09/06/2023
Violation issued (HPD, closed)
C
09/06/2023
Violation issued (HPD, closed)
A
09/06/2023
Violation issued (HPD, closed)
A
09/06/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
C
01/31/2023
Violation issued (HPD, closed)
A
01/31/2023
Violation issued (HPD, open)
B
05/05/2022
Signed off — Alteration
Repair damaged street facade parapet walls as per attached plans.
X00631521-I1
02/10/2022
Special inspection requirement — Masonry
Jeffrey Reid
02/10/2022
Special inspection requirement — Final
Jeffrey Reid
02/09/2022
Filed — Alteration
Repair damaged street facade parapet walls as per attached plans.
X00631521-P1
12/13/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00646366-I1
12/13/2021
Permit issued — Supported Scaffold
X00646366-I1-SF
12/09/2021
Permit issued — General Construction
X00631521-I1-GC
11/23/2021
Filed — Alteration
Repair damaged street facade parapet walls as per attached plans.
X00631521-I1
07/19/2021
Permit issued — Sidewalk Shed
X00546069-I1-SH
06/30/2021
Permit issued — Sidewalk Shed
X00546069-I1-SH
06/29/2021
Permit issued — Sidewalk Shed
X00546069-I1-SH
06/25/2021
Filed — Alteration
X00546069-I1
12/28/2016
Violation issued (HPD, closed)
B
12/28/2016
Violation issued (HPD, closed)
B
12/09/2016
Violation issued (HPD, closed)
C
10/31/2016
Violation issued (HPD, closed)
I
12/29/1999
Violation issued (ECB, closed)
Boilers
08/20/1997
Violation issued (HPD, closed)
A
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/08/1994
Violation issued (HPD, closed)
C
07/08/1994
Violation issued (HPD, closed)
A
06/09/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/1994
Violation issued (HPD, closed)
A
05/17/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedMetro Contracting NY12/13/2021
DOB NOWGeneral ConstructionSigned-offRose Contractor NY12/09/2021
DOB NOWSidewalk ShedPermit IssuedMetro Contracting NY07/19/2021
DOB NOWSidewalk ShedPermit IssuedMetro Contracting NY06/30/2021
DOB NOWSidewalk ShedPermit IssuedTriera Contracting06/29/2021
BISFBISSUEDJack Piccini05/03/2013
BISPLISSUEDA.R.L. Plumbing & Heating05/03/2013
BISFBISSUEDF & B Fuel Oi. Co06/07/1995
1 project · most recent 06/30/2021
FiledStatusContractorScope
06/30/2021Permit IssuedRichard Neu—
1 project · most recent 12/13/2021
Scaffold
FiledStatusContractorScope
12/13/2021Permit IssuedMetro Contracting NYScaffold
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/10/2022MasonryJeffrey Reidspecial
02/10/2022FinalJeffrey Reidprogress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026X00546069-I1Request digital key ↗
08/25/2026X00631521-I1Request digital key ↗
08/25/2026X00631521-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
05/04/2013220287856Open ↗
05/04/2013220287856Open ↗
▸BISWORK PERMIT APPLICATION2
05/04/2013220287856Open ↗
05/04/2013220287856Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00631521-P1Open ↗
08/25/2026X00631521-I1Open ↗
08/25/2026X00646366-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/07/2018220287856Open ↗
05/04/2013220287856Open ↗
05/04/2013220287856Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/04/2013220287856Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/04/2013220287856Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026X00631521-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026X00631521-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE4
02/05/2014220287856Open ↗
12/09/2013220287856Open ↗
11/15/2013220287856Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
05/04/2013220287856Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00631521-I1Open ↗
08/25/2026X00631521-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/04/2013220287856Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/07/2018220287856Open ↗
05/04/2013220287856Open ↗
05/04/2013220287856Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/07/2018220287856Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/07/2018220287856Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/07/2018220287856Open ↗
05/04/2013220287856Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
05/04/2013220287856Open ↗
▸BISBOROUGH INTAKE FORM1
05/07/2018220287856Open ↗