← Back
One family attached or semi-detached
1649 EAST 56 STREET
BROOKLYN · Flatlands · BIN 3236125
💬 Discuss this project
1955Year Built
2Stories
A5Building Class
R5Zoning
1,567 sfGross Floor Area
1Units
9 Open Violations ▸FDNY Report ↗
One family attached or semi-detached · Owner of record: 1649 EAST 56 123 LLC · 2,000 sf lot · 0.78 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction17p · 3 filings · 20 docs
Floor 1Under Construction17p · 3 filings · 20 docs
BasementUnder Construction10p · 1 filing · 19 docs
Sub-Basement10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ABRAHAM CONTRACTORS2208/06/2026
1649 EAST 123103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/28/2025$540K—— → —$345/sf building
12/15/2020$436K—Private party → INTERGALACTIC GROUP, LLC$278/sf building
03/12/2020$1.2M—Private party → Private party$789/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DANIEL GERDES ARCHITECT709/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MILLIEN DESIGN AND CONSULTAN1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KING CONSTR & RESTORATIONGeneral Contractor408/06/2026
ABRAHAM CONTRACTORS INCGeneral Contractor204/09/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
CLAIRMONT ELEC'L CONTR'GElectrical103/22/2026
TRIANGLE ELECTRIC INC.Electrical103/22/2026
HORBRIDGE PLUMBING & HEATINGPlumbing106/28/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129108/26/2022
JCO CONSULTING INC.8447105/16/2022
SJS INSPECTIONS AND CONSU8286104/05/2022
Building Lifecycle
All (95)Filed (7)Permit Issued (8)Violation (10)Inspection (5)Objection (46)Special Inspection (19)
08/05/2026
Permit issued — General Construction
B00690920-I1-GC
04/09/2026
Violation issued (ECB, open)
Construction
01/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Permit issued — General Construction
B00690920-I1-GC
11/24/2025
Violation issued (HPD, open)
I
10/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/24/2025
Filed — Alteration
Herewith is a filing post-amendment to revise the plumbing schedule, plumbing riser diagram, gas riser diagram, and the domestic water riser diagram.
B00693017-P4
09/03/2025
Permit issued — Sprinklers
B00735588-I1-EW-SP
06/17/2025
Permit issued — Plumbing
B00693017-I1-PL
06/05/2025
Permit issued — General Construction
B00690920-I1-GC
12/04/2024
Violation issued (HPD, open)
I
11/06/2024
Violation issued (HPD, open)
B
11/28/2023
Violation issued (HPD, open)
I
03/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/15/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/07/2023
Objection resolved — Addressed
03/06/2023
Objection raised — Other
03/03/2023
Filed — Alteration
Herewith is a filing post-amendment to revise the plumbing schedule, plumbing riser diagram, gas riser diagram, and the domestic water riser diagram.
B00693017-P2
01/26/2023
Filed — Alteration
Herewith is a filing post-amendment to revise the plumbing schedule, plumbing riser diagram, gas riser diagram, and the domestic water riser diagram.
B00693017-P1
01/19/2023
Permit issued — General Construction
B00690920-I1-GC
11/17/2022
Violation issued (HPD, open)
I
10/17/2022
Permit issued — Plumbing
B00693017-I1-PL
09/27/2022
Special inspection requirement — Lighting controls
SERGEY BOLOTOV
09/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
09/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
09/27/2022
Special inspection requirement — Lighting in dwelling units
SERGEY BOLOTOV
09/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
SERGEY BOLOTOV
09/27/2022
Special inspection requirement — Interior lighting power
SERGEY BOLOTOV
09/27/2022
Special inspection requirement — Fenestration areas
SERGEY BOLOTOV
09/27/2022
Special inspection requirement — Insulation placement and R values
SERGEY BOLOTOV
09/27/2022
Special inspection requirement — Fenestration air leakage
SERGEY BOLOTOV
09/23/2022
Permit issued — General Construction
B00690920-I1-GC
08/26/2022
Filed — Alteration CO
Herewith is requesting to waive ST-1 Street "PARK DEPARTMENT ACKNOWLEDGMENT LETTER FOR STREET TREE PLAN. The filing is to convert from 1-family to 2-family dwelling units. Not an extension or enlargement exceeds 20%.
B00690920-P1
08/24/2022
Special inspection requirement — Lighting in dwelling units
NANIK MASSAND
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
08/24/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
08/24/2022
Special inspection requirement — Interior lighting power
NANIK MASSAND
08/24/2022
Special inspection requirement — Lighting controls
NANIK MASSAND
08/24/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
NANIK MASSAND
08/24/2022
Special inspection requirement — Fenestration areas
NANIK MASSAND
08/24/2022
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
08/24/2022
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
05/16/2022
Filed — Alteration
B00735588-I1
05/11/2022
Special inspection requirement — Sprinkler Systems
joseph oreste
04/12/2022
Objection raised — Inspections
04/12/2022
Objection resolved — Addressed
04/12/2022
Objection raised — Zoning
04/12/2022
Objection resolved — Addressed
04/12/2022
Objection raised — Admin
04/12/2022
Objection resolved — Addressed
04/12/2022
Objection raised — Zoning
04/12/2022
Objection resolved — Addressed
04/12/2022
Objection raised — Fire_Protection
04/12/2022
Objection resolved — Addressed
04/12/2022
Objection raised — Fire_Protection
04/12/2022
Objection resolved — Addressed
04/12/2022
Objection raised — Zoning
04/12/2022
Objection resolved — Addressed
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKING CONSTR & RESTORATION08/05/2026
DOB NOWGeneral ConstructionPermit IssuedKING CONSTR & RESTORATION01/07/2026
DOB NOWSprinklersPermit IssuedA M B MECHANICAL INC09/03/2025
DOB NOWPlumbingPermit IssuedHORBRIDGE PLUMBING & HEAT06/17/2025
DOB NOWGeneral ConstructionPermit IssuedKING CONSTR & RESTORATION06/05/2025
DOB NOWGeneral ConstructionPermit IssuedABRAHAM CONTRACTORS INC01/19/2023
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C10/17/2022
DOB NOWGeneral ConstructionPermit IssuedABRAHAM CONTRACTORS INC09/23/2022
1 project · most recent 09/24/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/24/2025Permit IssuedHORBRIDGE PLUMBING & HEATGas, Storm, Water/Sanitary
2 projects · most recent 06/16/2025
General Wiring
FiledStatusContractorScope
06/16/2025Permit IssuedCLAIRMONT ELEC'L CONTR'GGeneral Wiring
04/20/2020Permit IssuedTRIANGLE ELECTRIC INC.1 meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/27/2022Lighting controlsSERGEY BOLOTOVenergy_progress
09/27/2022Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
09/27/2022Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
09/27/2022Lighting in dwelling unitsSERGEY BOLOTOVenergy_progress
09/27/2022Fenestration and door U-factor and product ratingsSERGEY BOLOTOVenergy_progress
09/27/2022Interior lighting powerSERGEY BOLOTOVenergy_progress
09/27/2022Fenestration areasSERGEY BOLOTOVenergy_progress
09/27/2022Insulation placement and R valuesSERGEY BOLOTOVenergy_progress
09/27/2022Fenestration air leakageSERGEY BOLOTOVenergy_progress
08/24/2022Lighting in dwelling unitsNANIK MASSANDenergy_progress
08/24/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
08/24/2022Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
08/24/2022Interior lighting powerNANIK MASSANDenergy_progress
08/24/2022Lighting controlsNANIK MASSANDenergy_progress
08/24/2022Fenestration and door U-factor and product ratingsNANIK MASSANDenergy_progress
08/24/2022Fenestration areasNANIK MASSANDenergy_progress
08/24/2022Fenestration air leakageNANIK MASSANDenergy_progress
08/24/2022Insulation placement and R valuesNANIK MASSANDenergy_progress
05/11/2022Sprinkler Systemsjoseph orestespecial
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026B00735588-I1Request digital key ↗
08/28/2026B00690920-P2Request digital key ↗
08/28/2026B00690920-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026B00690920-P2Open ↗
08/28/2026B00690920-P1Open ↗
08/28/2026B00690920-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00690920-I1Open ↗
08/26/2026B00735588-I1Open ↗
08/25/2026B00690920-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00690920-I1Open ↗
08/25/2026B00690920-P1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/28/2026B00690920-P2Open ↗
08/13/2026B00690920-I1Open ↗
08/13/2026B00690920-P1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B00690920-P1Open ↗
08/28/2026B00690920-I1Open ↗
08/28/2026B00690920-P2Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/28/2026B00690920-P1Open ↗
08/28/2026B00690920-I1Open ↗
08/28/2026B00690920-P2Open ↗