← Back
Public elementary, junior or senior high
165-15 88TH AVENUE
QUEENS · Jamaica · BIN 4624256
💬 Discuss this project
2024Year Built
5Stories
W1Building Class
C4-4DZoning
139,308 sfGross Floor Area
0Units
3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC SCHOOL CONSTRUCTION AUTHORITY · 38,795 sf lot · 3.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction86p · 2 filings · 20 docs
Floor 5Under Construction83p · 2 filings · 20 docs
Floor 4Under Construction128p · 2 filings · 20 docs
Floor 3Under Construction128p · 3 filings · 20 docs
Floor 2Under Construction129p · 2 filings · 20 docs
Floor 1Under Construction132p · 3 filings · 20 docs
CellarUnder Construction127p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION1609/13/2026
NYC SCHOOL CONSTRUCTION AUTHORITY5707/23/2026
OZONE DEMULITION CORP103/22/2026
NYC SCHOOL CONSTRUCTION AUTH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES1403/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY N3403/21/2026
JMG CONSULTANTS603/21/2026
MRA ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEON D. DEMATTEIS CONSTGeneral Contractor3008/13/2026
RAEL AUTOMATIC SPR.CO INCFire Protection407/03/2026
PJP INSTALLERS INCGeneral Contractor404/09/2026
PAR PLUMBING CO., INCPlumbing307/08/2026
RAEL AUTOMATIC SPR. CO.INFire Protection207/08/2026
JCC CONSTRUCTION CORPGeneral Contractor107/08/2026
DARCON CONSTRUCTION INCGeneral Contractor104/08/2026
JCC CONSTRUCTION CORPPlumbing107/08/2026
OLYMPIC PLBG & HTG SVC INPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS1438908/12/2026
TECTONIC ENGINEERING CONS1063008/12/2026
Building Lifecycle
All (179)Filed (40)Permit Issued (39)Violation (19)Inspection (12)Objection (39)Special Inspection (30)
08/27/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/27/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/27/2026
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
08/27/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
GEORGE GHEBRYAL
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
08/27/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
08/27/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/27/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
08/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2026
Objection resolved — Addressed
08/13/2026
Objection raised — Other
08/12/2026
Filed — New Building
Q497- ADDITIONAL MECHANICAL EQUIPMENT ONLY
Q00687157-B1
08/12/2026
Permit issued — Mechanical Systems
Q00687157-Z6-MS
08/10/2026
Objection raised — Other
08/03/2026
Filed — New Building
Q497- ADDITIONAL MECHANICAL EQUIPMENT ONLY
Q00687157-A9
07/22/2026
Permit issued — Construction Fence
Q00844240-I1-FN
07/01/2026
Permit issued — Sprinklers
Q00710199-I1-EW-SP
07/01/2026
Permit issued — Sprinklers
Q00710199-I1-EW-SD
06/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/15/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/11/2026
Special inspection requirement — Public Assembly Emergency Lighting
GEORGE GHEBRYAL
06/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/10/2026
Special inspection requirement — Maintenance information
JAMES WILSON
06/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES WILSON
06/10/2026
Special inspection requirement — Heating Systems
JAMES WILSON
06/10/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES WILSON
06/09/2026
Filed — New Building
Q497- ADDITIONAL MECHANICAL EQUIPMENT ONLY
Q00687157-A8
06/08/2026
Filed — No Work
Q00766152-P1
06/08/2026
Special inspection requirement — Public Assembly Emergency Lighting
GEORGE GHEBRYAL
06/08/2026
Special inspection requirement — Maintenance information
JAMES WILSON
06/08/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES WILSON
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES WILSON
06/08/2026
Special inspection requirement — Heating Systems
JAMES WILSON
05/28/2026
Objection resolved — Addressed
05/04/2026
Special inspection requirement — Standpipe Systems
GEORGE GHEBRYAL
05/04/2026
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
05/04/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
04/29/2026
Filed — New Building
Q497- ADDITIONAL MECHANICAL EQUIPMENT ONLY
Q00687157-A6
04/29/2026
Objection resolved — Addressed
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES WILSON
04/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
04/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES WILSON
04/29/2026
Special inspection requirement — Shutoff dampers
JAMES WILSON
04/28/2026
Objection raised — Other
04/27/2026
Filed — New Building
Q497- ADDITIONAL MECHANICAL EQUIPMENT ONLY
Q00687157-Z6
04/24/2026
Special inspection requirement — Final
JAMES WILSON
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/20/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/19/2026
Permit issued — General Construction
Q00687157-I1-GC
03/09/2026
Permit issued — General Construction
Q00687157-S9-GC
03/09/2026
Permit issued — Mechanical Systems
Q00709456-S1-MS
02/25/2026
Permit issued — Sidewalk Shed
Q00973878-I1-SH
02/03/2026
Filed — New Building
Q497- ADDITIONAL MECHANICAL EQUIPMENT ONLY
Q00687157-A3
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedLEON D. DEMATTEIS CONST08/12/2026
DOB NOWConstruction FencePermit IssuedLEON D. DEMATTEIS CONST07/22/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC07/01/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC07/01/2026
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONST03/19/2026
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONST03/09/2026
DOB NOWMechanical SystemsSigned-offLEON D. DEMATTEIS CONST03/09/2026
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC02/25/2026
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP01/06/2026
DOB NOWBoiler EquipmentSigned-offOLYMPIC PLBG & HTG SVC IN11/06/2025
DOB NOWMechanical SystemsPermit IssuedLEON D. DEMATTEIS CONST10/30/2025
DOB NOWMechanical SystemsSigned-offLEON D. DEMATTEIS CONST10/30/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC10/28/2025
DOB NOWStructuralPermit IssuedLEON D. DEMATTEIS CONST10/23/2025
DOB NOWSupport of ExcavationPermit IssuedJCC CONSTRUCTION CORP10/23/2025
DOB NOWPlumbingPermit IssuedJCC CONSTRUCTION CORP10/08/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/07/2025
DOB NOWConstruction FencePermit IssuedLEON D. DEMATTEIS CONST08/15/2025
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC06/16/2025
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC06/16/2025
DOB NOWSupport of ExcavationPermit IssuedLEON D. DEMATTEIS CONST04/30/2025
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONST03/26/2025
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC03/03/2025
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONST02/12/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedDARCON CONSTRUCTION INC12/03/2024
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC11/04/2024
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR. CO.IN10/21/2024
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR. CO.IN10/21/2024
DOB NOWFoundationPermit IssuedLEON D. DEMATTEIS CONST10/10/2024
DOB NOWMechanical SystemsPermit IssuedLEON D. DEMATTEIS CONST10/10/2024
DOB NOWStructuralPermit IssuedLEON D. DEMATTEIS CONST10/10/2024
DOB NOWMechanical SystemsSigned-offLEON D. DEMATTEIS CONST10/10/2024
DOB NOWConstruction FencePermit IssuedLEON D. DEMATTEIS CONST08/26/2024
DOB NOWSupport of ExcavationPermit IssuedLEON D. DEMATTEIS CONST04/30/2024
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC03/07/2024
DOB NOWFoundationPermit IssuedLEON D. DEMATTEIS CONST01/18/2024
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC01/16/2024
DOB NOWSupport of ExcavationPermit IssuedLEON D. DEMATTEIS CONST09/12/2023
DOB NOWConstruction FencePermit IssuedLEON D. DEMATTEIS CONST09/01/2023
BIS—ISSUEDC. & A. MASONRY CONTRACTO07/06/2012
+ 4 more permits on file
2 projects · most recent 08/12/2026
Air Conditioning Systems Heating and Air Conditioning Systems Others Refrigeration Systems Ventilation Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Permit IssuedLEON D. DEMATTEIS CONSTAir Conditioning Systems, Heating and Air Conditioning Systems, Others, Refrigeration Systems
Heat / Cool
Lg LSN243HLV3 24,000 BTU · Vrf Indoor ×12
LSN363HLV3 36,000 BTU · Heat Pump Outdoor ×5
LSN243GLV3 24,000 BTU · Heat Pump Outdoor ×3
LSU243HLV3 26,000 BTU · Heat Pump Outdoor ×1
LSU363HLV3 40,000 BTU · Heat Pump Outdoor ×1
__Junk__ LSN243HLV3 24,000 BTU · Heat Pump Outdoor ×2
Mitsubishi Electric PKA-A24KA7 / PUZ-A24NKA7-BS 24,000 BTU · Condensing Unit ×4
PKA-A24KA7 / PUZA24NKA7-BS 24,000 BTU · Condensing Unit ×1
PKA-A36KA7 / PUZ-A36NKA7-BS 36,000 BTU · Condensing Unit ×1
PKA-A36KA7 / PUZ-A36NKA7-BS 36,000 BTU · Condensing Unit ×1
Annexair ERP-E-25-EW12-H-C-SW 24,840 CFM · Fan Coil Indoor ×2
Ventilation
Pennbarry Z12GP 950 CFM · Exhaust Fan ×18
DX08QGP 50 CFM · Exhaust Fan ×6
UVS060-00T1 225 CFM · Exhaust Fan ×6
VPLUME-105A9 1,150 CFM · Kitchen Exhaust ×6
VPLUME-090A9 750 CFM · Kitchen Exhaust ×4
Z8GP 200 CFM · Exhaust Fan ×4
BCRD-085D 100 CFM · Exhaust Fan ×2
BCRD-100DHP 200 CFM · Exhaust Fan ×2
DX10R 150 CFM · Exhaust Fan ×2
DX14B 1,400 CFM · Boiler ×2
DX24B 4,150 CFM · Exhaust Fan ×2
FX24BHFT 3,650 CFM · Kitchen Exhaust ×2
Annexair AHU-I-07-H-C-SS 6,825 CFM · Ahu ×2
ERP-E-25-EW12-H-C-SW20-SS 24,840 CFM · Ahu ×2
ERP-E-30-EW12-H-C-SW25-SS 30,770 CFM · Ahu ×2
ERP-I-09-EW04-H-C-SW07-SS 9,650 CFM · Ahu ×2
ERP-E-30-EW12-H-C-SW 30,770 CFM · Ahu ×2
ERP-I-09-EW04-H-C-SW 9,650 CFM · Ahu ×2
Greenheck Vektor-H-10 1,150 CFM · Kitchen Exhaust ×6
CSP-A390-VG 200 CFM · Exhaust Fan ×2
CSP-A710-VG 525 CFM · Exhaust Fan ×2
CUBE-300XP-30 3,650 CFM · Exhaust Fan ×2
G-098-VG 50 CFM · Exhaust Fan ×2
GB-097-3 200 CFM · Exhaust Fan ×2
USF-06 225 CFM · Exhaust Fan ×2
AX-90-275-0615-A150 20,250 CFM · Exhaust Fan ×1
AX-90-275-0620-A200 26,000 CFM · Exhaust Fan ×1
G-0978-VG 50 CFM · Exhaust Fan ×1
GB-097 150 CFM · Exhaust Fan ×1
GB-130-3 1,400 CFM · Boiler ×1
Mitsubishi Electric CSP-A710-VG 400 CFM ×1
SP-A1050-VG 950 CFM · Vrf Outdoor ×1
SP-A390-VG 125 CFM · Vrf Outdoor ×1
Other
New York Blower Model 14606 50 CFM · Exhaust Fan ×4
Cooling
Arctic Chill PACVMV0300D3-MM-VS2 236 tons · Air Cooled Chiller ×1
Refrigeration
Bally BLP209LE-S2D-SVP 10,017 BTU · Condensing Unit ×2
BLP211MA-S1D-SVP 11,385 BTU · Condensing Unit ×2
BFZD070C8-HT3D-S0137 11,385 BTU · Condensing Unit ×1
BLP209LE-S2D-SV+ 10,017 BTU · Condensing Unit ×4
BLP211MA-S1D-SV+ 11,385 BTU · Condensing Unit ×4
BFZD070C8-HT3D-S 11,385 BTU · Condensing Unit ×1
BFZD070C 8-HT3D-S 11,385 BTU · Condensing Unit ×1
12/16/2025Signed-offLEON D. DEMATTEIS CONSTGenerators
Generators
Caterpillar Caterpillar C9 PGS 300 300 kW · Generator ×1
1 project · most recent 09/25/2025
FiledStatusContractorScope
09/25/2025Permit IssuedRAEL AUTOMATIC SPR.CO INC1,161 heads, 3 outlets
1 project · most recent 08/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/12/2026Signed-offOLYMPIC PLBG & HTG SVC INGas, Storm, Water/Sanitary
3 projects · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025Permit IssuedHELLMAN ELECTRIC LLCGeneral Wiring
03/06/2024CompleteRAIDEN ELECTRIC LLC—
12/27/2022Permit IssuedHELLMAN ELECTRIC LLC1 meters, 1 new_meters
2 projects · most recent 08/12/2026
FiledStatusContractorScope
08/12/2026Permit IssuedLEON D. DEMATTEIS CONST1 scope_items
06/14/2024Permit IssuedLEON D. DEMATTEIS CONST4 scope_items
1 project · most recent 10/16/2024
Sidewalk Shed
FiledStatusContractorScope
10/16/2024Permit IssuedPJP INSTALLERS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/27/2026Pass-Final PL - UndergroundPassView ↗
08/27/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/27/2026Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/15/2026Pass-Final Boiler Equipment InspectionPassView ↗
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/21/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/27/2026Post-installed AnchorsGEORGE GHEBRYALspecial
08/27/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/27/2026Emergency and Standby Power Systems (Generator)GEORGE GHEBRYALspecial
08/27/2026FinalGEORGE GHEBRYALprogress
08/27/2026Mechanical SystemsGEORGE GHEBRYALspecial
06/11/2026Public Assembly Emergency LightingGEORGE GHEBRYALprogress
06/10/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/10/2026Maintenance informationJAMES WILSONenergy_progress
06/10/2026HVAC-R and service water heating equipmentJAMES WILSONenergy_progress
06/10/2026HVAC-R and service water heating system controlsJAMES WILSONenergy_progress
06/10/2026HVAC-R and service water piping design and insulationJAMES WILSONenergy_progress
06/10/2026Post-installed AnchorsGEORGE GHEBRYALspecial
06/10/2026Heating SystemsJAMES WILSONspecial
06/08/2026HVAC-R and service water heating equipmentJAMES WILSONenergy_progress
06/08/2026HVAC-R and service water heating system controlsJAMES WILSONenergy_progress
06/08/2026Post-installed AnchorsGEORGE GHEBRYALspecial
06/08/2026Heating SystemsJAMES WILSONspecial
06/08/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/08/2026Public Assembly Emergency LightingGEORGE GHEBRYALprogress
06/08/2026HVAC-R and service water piping design and insulationJAMES WILSONenergy_progress
06/08/2026Maintenance informationJAMES WILSONenergy_progress
05/04/2026Sprinkler SystemsGEORGE GHEBRYALspecial
05/04/2026Post-installed AnchorsGEORGE GHEBRYALspecial
05/04/2026Standpipe SystemsGEORGE GHEBRYALspecial
05/04/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
Latest 25 of 150.
▾Documents — 389 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch37
08/26/2026Q00687157-B1Request digital key ↗
08/26/2026Q00687157-S8Request digital key ↗
08/26/2026Q00709456-S2Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/26/2026Q00766108-I1Request digital key ↗
08/26/2026Q00766161-I1Request digital key ↗
08/16/2026Q00766152-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
01/23/2017402082376Open ↗
11/02/2016402082376Open ↗
09/01/2016420888962Open ↗
▸BISPLACE OF ASSEMBLY2
05/13/2014420888962Open ↗
09/30/2013420888962Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications136
▸DOB NOWProgress Inspector Seal & Signature48
09/23/2026Q00687157-S7Open ↗
09/23/2026Q00687157-S7Open ↗
09/23/2026Q00687157-S7Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature46
09/23/2026Q00687157-S7Open ↗
09/23/2026Q00687157-S7Open ↗
09/01/2026Q00687157-S4Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
08/26/2026Q00687157-S8Open ↗
08/26/2026Q00709456-S2Open ↗
08/26/2026Q00709456-S1Open ↗
Showing 3 of 41 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/30/2013420888962Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWNYCSCA - Approved Site Safety Plans3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos31
▸DOB NOWOER: Notice to Proceed21
08/16/2026Q00687157-S7Open ↗
Showing 1 of 21 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
08/16/2026Q00687157-S9Open ↗
08/16/2026Q00687157-S7Open ↗
08/16/2026Q00687157-S6Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs73
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter39
08/26/2026Q00709456-S1Open ↗
08/26/2026Q00709456-S2Open ↗
08/26/2026Q00709456-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)29
08/26/2026Q00687157-B1Open ↗
08/26/2026Q00687157-S8Open ↗
08/16/2026Q00687157-A8Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/16/2026Q00687157-Z6Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
01/23/2017402082376Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/30/2013420888962Open ↗
▸Other Documents70
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal42
08/18/2026Q00710199-I1Open ↗
08/16/2026Q00766152-I1Open ↗
08/16/2026Q00766152-P1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSite Survey: Initial6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWProperty Ownership Certification5
08/16/2026Q00687157-P6Open ↗
08/16/2026Q00687157-I1Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/16/2026Q00687157-Z6Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 41
08/26/2026Q00766108-I1Open ↗
▸DOB NOWAlternate Plan 11
08/26/2026Q00766108-I1Open ↗
▸DOB NOWAlternate Plan 21
08/26/2026Q00766108-I1Open ↗