Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB06/30/2023Violation issued-failure to file 2020 external hgh pressure inspectionAnswered on the city's records: a 2020 boiler inspection report was accepted (Nov 2, 2020)
DOB06/30/2023Violation issued-failure to file 2020 internal hgh pressure inspectionAnswered on the city's records: a 2020 boiler inspection report was accepted (Nov 2, 2020)
DOB06/30/2023Violation issued-failure to file 2021 external hgh pressure inspectionAnswered on the city's records: a 2021 boiler inspection report was accepted (Nov 9, 2021)
DOB06/30/2023Violation issued-failure to file 2021 internal hgh pressure inspectionAnswered on the city's records: a 2021 boiler inspection report was accepted (Nov 9, 2021)
DOB06/20/2023Violation issued-failure to file 2019 internal hgh pressure inspectionAnswered on the city's records: a 2019 boiler inspection report was accepted (Aug 9, 2019)
DOB06/20/2023Violation issued-failure to file 2018 external hgh pressure inspectionAnswered on the city's records: a 2018 boiler inspection report was accepted (Jul 25, 2018)
DOB06/20/2023Violation issued-failure to file 2018 internal hgh pressure inspectionAnswered on the city's records: a 2018 boiler inspection report was accepted (Jul 25, 2018)
DOB06/20/2023Violation issued-failure to file 2019 external hgh pressure inspectionAnswered on the city's records: a 2019 boiler inspection report was accepted (Aug 9, 2019)
Predominantly retail with other uses · 1,440 sf lot · 2.49 FAR built · Flood zone X