Roof9p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 4 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Bulkhead2p · 1 filing · 20 docs
Plumbing
PLUMBING WORK AS PER PLANS FILED
On file for this project
29 documents · 2 drawing sheets
Floor 1513p · 4 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 6 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1412p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1312p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1212p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1112p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1013p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 912p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 813p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 712p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 6 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 612p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 6 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 514p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 7 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 413p · 4 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 6 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 312p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 4 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 210p · 5 filings · 20 docs
MechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 3 drawing sheets
STRUCTURAL WORK AS PER PLANS FILED
On file for this project
10 documents · 1 drawing sheet
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 112p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 4 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 4 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Cellar10p · 4 filings · 20 docs
CivilFire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 2 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 4 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Sub-Cellar12p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
MECHANICAL WORK AS PER PLANS FILED
On file for this project
40 documents · 2 drawing sheets
INSTALL COMBINED SPRINKLER STANDPIPE SYSTEM IN CONJUNCTION WITH NB #121205926
On file for this project
21 documents · 5 drawing sheets
INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED. NO CHANGE IN EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #121205926
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.