Elevator apt, fireproof with stores
167 ELDRIDGE STREET
MANHATTAN · BIN 1075907
💬 Discuss this project
2002Year Built
8Stories
D6Building Class
C4-4AZoning
32,700 sfGross Floor Area
19Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: 165 ELDRIDGE OWNER LLC · 5,029 sf lot · 6.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
CellarUnder Construction46p · 3 filings · 20 docs
BasementUnder Construction2p · 1 filing · 6 docs
Sub-Basement26p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES407/08/2026
CHURCH OF JESUS CHRIST OF LATTE1504/10/2026
JOBCO404/09/2026
165 ELDRIDGE OWNER LLC203/22/2026
SCHOOL YARD ENTERPRISES2703/22/2026
DOUGLASTON103/21/2026
SCHREIBER REALTY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2022$19.3M—ELDRIDGE JOEL CORP. → 165 ELDRIDGE OWNER LLC$589/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COSTA ARCH & ENG LLP907/06/2026
BITOPI CONSULTANTS LLC102/10/2026
OZAETA ENGINEERING, PLLC104/21/2025
MJE PROFESSIONAL SERVICES106/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COSTA ARCHITECTURE & ENGINEERING LL1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOBCO INCORPORATEDGeneral Contractor607/08/2026
AMI AND ASSOCIATES INCFire Protection207/08/2026
ODYSSEY PLMBG & HTNG CORPPlumbing206/27/2026
SASCO BUILDERS INCGeneral Contractor104/09/2026
NEXT GENERATION RESTORATIONGeneral Contractor107/08/2026
OLSI PELLUMBIElectrical103/21/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COSTA ARCHITECTS & ENGINE1321407/06/2026
METRIC CONSULTING AND INS1803605/19/2026
Building Lifecycle
All (131)Filed (12)Permit Issued (12)Signed Off (5)Facade (FISP) (9)Violation (59)Inspection (4)Objection (4)Special Inspection (26)
08/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01307431-I1
07/07/2026
Signed off — Alteration
mechanical work associated with the interior renovation of a church
M01160511-S2
07/06/2026
Filed — Alteration CO
filing for change of use for the basement and cellar floor to a place of worship. obtain a new CO for the basement and cellar floor only.
M01124331-P1
06/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
ANGELO COSTA
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGELO COSTA
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/26/2026
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
05/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
George Paider
05/19/2026
Filed — Alteration
mechanical work associated with the interior renovation of a church
M01160511-P2
05/06/2026
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/01/2026
Signed off — Alteration
mechanical work associated with the interior renovation of a church
M01160511-S3
04/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Filed — Alteration
mechanical work associated with the interior renovation of a church
M01160511-P1
03/12/2026
Filed — No Work
M01201372-I1
02/10/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01307431-I1
02/10/2026
Permit issued — Supported Scaffold
M01307431-I1-SF
12/29/2025
Permit issued — General Construction
M01124331-I1-GC
12/22/2025
Permit issued — Sprinklers
M01160511-S2-EW-SP
12/12/2025
Violation issued (HPD, closed)
A
12/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2025
Permit issued — General Construction
M01124331-I1-GC
08/12/2025
Permit issued — Plumbing
M01160511-S2-EW-SP
08/11/2025
Permit issued — Plumbing
M01160511-S2-PL
08/01/2025
Permit issued — Structural
M01160511-S3-ST
08/01/2025
Permit issued — General Construction
M01160511-I1-GC
08/01/2025
Permit issued — Mechanical Systems
M01160511-S1-MS
07/21/2025
Permit issued — General Construction
M01124331-I1-GC
04/21/2025
Filed — Alteration
mechanical work associated with the interior renovation of a church
M01160511-S3
04/11/2025
Objection resolved — Addressed
03/28/2025
Signed off — Alteration
removal of existing partitions and finishes on the cellar and first floor. no change to use, egress or occupancy.
M01117841-I1
03/27/2025
Filed — Alteration
mechanical work associated with the interior renovation of a church
M01160511-S1
03/26/2025
Special inspection requirement — Public Assembly Emergency Lighting
George Paider
03/25/2025
Objection resolved — Addressed
03/20/2025
Objection raised — Scope
03/20/2025
Objection raised — Scope
03/11/2025
Filed — Alteration
mechanical work associated with the interior renovation of a church
M01160511-S2
03/10/2025
Filed — Alteration
mechanical work associated with the interior renovation of a church
M01160511-I1
02/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/19/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
02/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
02/05/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
02/05/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
02/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
02/05/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
02/05/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
12/27/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
12/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/22/2024
Violation issued (HPD, closed)
I
11/13/2024
Filed — Alteration CO
filing for change of use for the basement and cellar floor to a place of worship. obtain a new CO for the basement and cellar floor only.
M01124331-I1
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offSASCO BUILDERS INC02/10/2026
DOB NOWGeneral ConstructionPermit IssuedJOBCO INCORPORATED12/29/2025
DOB NOWSprinklersSigned-offAMI AND ASSOCIATES INC12/22/2025
DOB NOWGeneral ConstructionPermit IssuedJOBCO INCORPORATED10/31/2025
DOB NOWPlumbingSigned-offAMI AND ASSOCIATES INC08/12/2025
DOB NOWPlumbingSigned-offODYSSEY PLMBG & HTNG CORP08/11/2025
DOB NOWStructuralSigned-offJOBCO INCORPORATED08/01/2025
DOB NOWGeneral ConstructionPermit IssuedJOBCO INCORPORATED08/01/2025
DOB NOWMechanical SystemsPermit IssuedJOBCO INCORPORATED08/01/2025
DOB NOWGeneral ConstructionPermit IssuedJOBCO INCORPORATED07/21/2025
DOB NOWGeneral ConstructionSigned-offNEXT GENERATION RESTORATI11/07/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC06/28/2023
BISEQISSUEDPILKU CONSTRUCTION SERVIC01/13/2014
BISPLISSUEDLEMODE PLBG & HTG CORP08/04/2006
BISMHISSUEDALL CITY REMODELING, INC07/13/2006
BISOTISSUEDCAPITAL ONE CONSTRUCTION INC03/10/2006
BISOTISSUEDPIER TECH INC01/12/2006
BISEQISSUEDJOBCO INCORPORATED12/15/2005
BIS—ISSUEDJOBCO INCORPORATED12/15/2005
BIS—ISSUEDJOBCO INCORPORATED12/02/2004
BISEQISSUEDJOBCO INCORPORATED01/16/2004
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.12/10/2003
BIS—ISSUEDJOBCO INCORPORATED11/13/2003
BISEQISSUEDJOBCO INCORPORATED09/04/2003
BIS—ISSUEDJOBCO INCORPORATED09/04/2003
BISEQISSUEDJOBCO INCORPORATED03/11/2003
BIS—ISSUEDJOBCO INCORPORATED03/11/2003
BISEQISSUEDJOBCO INCORPORATED02/22/2003
BIS—ISSUEDJOBCO INCORPORATED09/09/2002
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.04/04/2002
BIS—ISSUEDJOBCO INCORPORATED03/04/2002
BISEQISSUEDJOBCO INCORPORATED03/04/2002
BISEQISSUEDJOBCO INCORPORATED11/14/2001
BIS—ISSUEDBIG APPLE WRECKING & CONST. CORP06/29/2001
BISEQISSUEDBIG APPLE WRECKING & CONST. CORP06/29/2001
BIS—ISSUEDBIG APPLE WRECKING & CONST. CORP06/29/2001
BISEQISSUEDBIG APPLE WRECKING & CONST. CORP06/29/2001
1 project · most recent 05/19/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/19/2026Signed-offJOBCO INCORPORATEDHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PURY-EP120TNU-A1 EP120 135,000 BTU · Vrf Outdoor ×1
PURY-EP72TNU-A1 EP96 108,000 BTU · Vrf Outdoor ×1
1 project · most recent 05/19/2026
Sprinkler System
FiledStatusContractorScope
05/19/2026Signed-offAMI AND ASSOCIATES INCSprinkler System
1 project · most recent 05/19/2026
Water/Sanitary
FiledStatusContractorScope
05/19/2026Signed-offODYSSEY PLMBG & HTNG CORPWater/Sanitary
2 projects · most recent 08/07/2025
General Wiring
FiledStatusContractorScope
08/07/2025Permit IssuedAMKRO ELECTRIC INCGeneral Wiring
06/28/2023CompleteRICHARD NEU—
1 project · most recent 05/19/2026
Steel
FiledStatusContractorScope
05/19/2026Signed-offAMI AND ASSOCIATES INCSteel
1 project · most recent 02/10/2026
Scaffold
FiledStatusContractorScope
02/10/2026Signed-offSASCO BUILDERS INCScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
06/02/2026Tenant Protection Plan ComplianceANGELO COSTAspecial
06/02/2026Fire-Resistant Penetrations and JointsANGELO COSTAspecial
05/26/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/26/2026Sprinkler SystemsSAMI HAJJAR P.Especial
05/26/2026Tenant Protection Plan ComplianceGeorge Paiderspecial
05/06/2026Sprinkler SystemsSAMI HAJJAR P.Especial
05/06/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/06/2026Tenant Protection Plan Compliance—special
03/26/2025Public Assembly Emergency LightingGeorge Paiderprogress
02/26/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/19/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
02/19/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
02/19/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
02/19/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
02/19/2025Duct leakage testing, insulation and designSAMI HAJJAR P.Eenergy_progress
02/19/2025Shutoff dampersSAMI HAJJAR P.Eenergy_progress
02/19/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/19/2025Heating SystemsSAMI HAJJAR P.Especial
02/05/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
02/05/2025FinalSAMI HAJJAR P.Eprogress
02/05/2025Mechanical SystemsSAMI HAJJAR P.Especial
02/05/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/05/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
02/05/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
12/27/2024FinalSAMI HAJJAR P.Eprogress
Latest 25 of 26.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
08/30/2026M00896973-I1Request digital key ↗
08/26/2026M01117841-I1Request digital key ↗
08/25/2026M01124331-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/18/2026M01201372-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
12/10/2013140142806Open ↗
11/08/2010110220118Open ↗
▸BISWORK PERMIT APPLICATION1
12/10/2013140142806Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/30/2026M00896973-I1Open ↗
08/25/2026M01124331-I1Open ↗
08/25/2026M01124331-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026M01160511-S2Open ↗
08/31/2026M01160511-S2Open ↗
08/28/2026M01160511-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026M01160511-I1Open ↗
08/25/2026M01160511-I1Open ↗
08/24/2026M01160511-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/10/2013140142806Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/24/2015140142806Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/10/2013140142806Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/10/2013140142806Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA3
01/28/2013110220118Open ↗
11/08/2010110220118Open ↗
07/01/2010110220118Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/15/2008110220118Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/10/2013140142806Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/24/2015140142806Open ↗
01/28/2013110220118Open ↗
11/08/2010110220118Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/14/2008110220118Open ↗
03/27/2008110220118Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/10/2013140142806Open ↗
04/15/2008110220118Open ↗
▸BISSHED LETTER1
01/16/2014140142806Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/28/2013110220118Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/10/2013140142806Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/15/2008110220118Open ↗
04/15/2008110220118Open ↗