← Back
Over six families without stores
165 LUDLOW STREET
MANHATTAN · BIN 1005407
💬 Discuss this project
1910Year Built
5Stories
C1Building Class
C4-4AZoning
8,150 sfGross Floor Area
20Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: TATAR LUDLOW LLC · 2,188 sf lot · 3.72 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 12p · 1 filing · 12 docs
Cellar5p · 4 filings · 20 docs
Basement1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAGNUM3207/08/2026
TATAR LUDLOW LLC203/22/2026
165 LUDLOW OWNER4403/22/2026
OWNER OF 165 LUDLOW ST403/22/2026
OWNER OF PREMISES 165-167203/22/2026
OWNER OF 165/167 LUDLOW S103/22/2026
VILLAGE PARTNERS I803/22/2026
THE OWNER OF103/22/2026
DUFF FOOD INC.103/22/2026
WALSEY MANAGEMENT203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.203/21/2026
PEROTTO GROUP603/21/2026
A1 EXPEDITING SERVICE CORP.703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST STANDARD CONSTR INCGeneral Contractor1907/08/2026
SIGNORE & SONS PLBG CORPPlumbing607/08/2026
NOLAN, CORYElectrical303/21/2026
CARNEY, THOMASElectrical303/21/2026
INTERBORO SIGN & MAINT INElectrical303/21/2026
EMERALD MECHL SOLUTIONS IPlumbing307/08/2026
OCNYC ELECL CONTNG INCElectrical103/22/2026
JOHN JR MARIElectrical103/21/2026
WILFRED JEFFREYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947304/15/2021
ATELIER NY ARCHITECTURE2438102/03/2020
Building Lifecycle
All (109)Filed (11)Permit Issued (20)Signed Off (3)Violation (60)Special Inspection (15)
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2023
Signed off — Alteration
M00111740-I1
12/23/2022
Violation issued (HPD, closed)
C
08/29/2022
Permit issued — Plumbing
M00501962-I1-PL
08/29/2022
Permit issued — Boiler Equipment
M00501868-I1-BE
08/29/2022
Permit issued — Boiler Equipment
M00501942-I1-BE
06/06/2022
Signed off — Alteration
Plumbing filing for rear yard drainage
M00433862-I1
05/24/2022
Signed off — Alteration
Renovate existing storefronts (exterior) on the basement level and 1st floor and commercial space at the basement level (interior). No change to use or occupancy.
M00298306-I1
02/15/2022
Violation issued (HPD, closed)
A
07/07/2021
Permit issued — Plumbing
M00298310-I1-PL
06/24/2021
Filed — Alteration
Renovate existing storefronts (exterior) on the basement level and 1st floor and commercial space at the basement level (interior). No change to use or occupancy.
M00298310-P3
04/29/2021
Permit issued — Construction Fence
M00111740-I1-FN
04/29/2021
Permit issued — Mechanical Systems
M00298306-I1-MS
04/23/2021
Permit issued — Plumbing
M00501962-I1-PL
04/23/2021
Permit issued — Boiler Equipment
M00501942-I1-BE
04/23/2021
Permit issued — Boiler Equipment
M00501868-I1-BE
04/15/2021
Filed — Alteration
M00501962-I1
04/15/2021
Filed — Alteration
REPLACE BOILER AND BURNER. CHANGE FUEL FROM OIL TO GAS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00501868-I1
04/15/2021
Filed — Alteration
M00501942-I1
04/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
04/12/2021
Special inspection requirement — Heating Systems
Gregory Perotto
04/12/2021
Special inspection requirement — Lowest Floor Elevation
Gregory Perotto
04/12/2021
Special inspection requirement — Maintenance information
Gregory Perotto
04/12/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
04/12/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
04/12/2021
Special inspection requirement — Maintenance information
Gregory Perotto
04/12/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
04/12/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
04/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
04/12/2021
Special inspection requirement — Energy Code Compliance Inspections
Gregory Perotto
04/12/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
03/17/2021
Permit issued — Mechanical Systems
M00298306-I1-MS
03/16/2021
Permit issued — Construction Fence
M00111740-I1-FN
12/11/2020
Permit issued — Plumbing
M00433862-I1-PL
12/07/2020
Filed — Alteration
Plumbing filing for rear yard drainage
M00433862-I1
12/03/2020
Permit issued — Construction Fence
M00111740-I1-FN
11/13/2020
Permit issued — Mechanical Systems
M00298306-I1-MS
11/06/2020
Filed — Alteration
Renovate existing storefronts (exterior) on the basement level and 1st floor and commercial space at the basement level (interior). No change to use or occupancy.
M00298310-P2
10/16/2020
Permit issued — Plumbing
M00298310-I1-PL
10/08/2020
Filed — Alteration
Renovate existing storefronts (exterior) on the basement level and 1st floor and commercial space at the basement level (interior). No change to use or occupancy.
M00298306-P3
10/07/2020
Filed — Alteration
Renovate existing storefronts (exterior) on the basement level and 1st floor and commercial space at the basement level (interior). No change to use or occupancy.
M00298310-P1
10/05/2020
Special inspection requirement — Mechanical Systems
10/05/2020
Special inspection requirement — Final
10/05/2020
Special inspection requirement — Electrical motors
05/19/2020
Permit issued — Construction Fence
M00111740-I1-FN
04/01/2020
Permit issued — Construction Fence
M00111740-I1-FN
02/12/2020
Filed — Alteration
Renovate existing storefronts (exterior) on the basement level and 1st floor and commercial space at the basement level (interior). No change to use or occupancy.
M00298310-I1
02/03/2020
Filed — Alteration
Renovate existing storefronts (exterior) on the basement level and 1st floor and commercial space at the basement level (interior). No change to use or occupancy.
M00298306-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2019
Permit issued — Construction Fence
M00111740-I1-FN
03/13/2019
Permit issued — Construction Fence
M00111740-I1-FN
01/18/2019
Permit issued — Construction Fence
M00111740-I1-FN
01/09/2019
Filed — Alteration
M00111740-I1
08/21/2018
Violation issued (HPD, closed)
C
08/21/2018
Violation issued (HPD, closed)
A
08/21/2018
Violation issued (HPD, closed)
B
08/21/2018
Violation issued (HPD, closed)
B
08/21/2018
Violation issued (HPD, closed)
A
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2016
Violation issued (HPD, closed)
I
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP08/29/2022
DOB NOWBoiler EquipmentPermit IssuedSIGNORE & SONS PLBG CORP08/29/2022
DOB NOWBoiler EquipmentPermit IssuedSIGNORE & SONS PLBG CORP08/29/2022
DOB NOWPlumbingPermit IssuedA & C PLBG & HTG CO., INC07/07/2021
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC04/29/2021
DOB NOWMechanical SystemsSigned-offFIRST STANDARD CONSTR INC04/29/2021
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP04/23/2021
DOB NOWBoiler EquipmentPermit IssuedSIGNORE & SONS PLBG CORP04/23/2021
DOB NOWBoiler EquipmentPermit IssuedSIGNORE & SONS PLBG CORP04/23/2021
DOB NOWMechanical SystemsSigned-offFIRST STANDARD CONSTR INC03/17/2021
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC03/16/2021
DOB NOWPlumbingSigned-offA & C PLBG & HTG CO., INC12/11/2020
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC12/03/2020
DOB NOWMechanical SystemsSigned-offFIRST STANDARD CONSTR INC11/13/2020
DOB NOWPlumbingPermit IssuedA & C PLBG & HTG CO., INC10/16/2020
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC05/19/2020
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC04/01/2020
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC08/28/2019
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC03/13/2019
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC01/18/2019
BISOTISSUEDFIRST STANDARD CONSTR INC12/09/2021
BISOTISSUEDFIRST STANDARD CONSTR INC03/15/2021
BIS—ISSUEDFIRST STANDARD CONSTR INC03/15/2021
BIS—ISSUEDFIRST STANDARD CONSTR INC03/15/2021
BISOTISSUEDFIRST STANDARD CONSTR INC11/20/2020
BIS—ISSUEDFIRST STANDARD CONSTR INC09/28/2020
BIS—ISSUEDFIRST STANDARD CONSTR INC09/28/2020
BISOTISSUEDFIRST STANDARD CONSTR INC04/01/2020
BISOTRE-ISSUEDFIRST STANDARD CONSTR INC02/10/2020
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.05/29/2015
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.06/19/2014
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.06/28/2013
BISPLISSUEDTESTERMAN PLBG & HTG INC05/28/2013
BISOTISSUEDFIRST STANDARD CONSTR INC05/22/2013
BISPLISSUEDTESTERMAN PLBG & HTG INC04/18/2013
BISOTISSUEDFIRST STANDARD CONSTR INC04/10/2013
BISPLISSUEDTESTERMAN PLBG & HTG INC03/26/2013
BISOTISSUEDFIRST STANDARD CONSTR INC03/25/2013
BISPLISSUEDTESTERMAN PLBG & HTG INC03/18/2013
BISOTISSUEDFIRST STANDARD CONSTR INC02/28/2013
+ 17 more permits on file
1 project · most recent 06/24/2021
Gas Water/Sanitary
FiledStatusContractorScope
06/24/2021Permit IssuedEMERALD MECHL SOLUTIONS IGas, Water/Sanitary
1 project · most recent 03/18/2022
General Wiring
FiledStatusContractorScope
03/18/2022CompleteOCNYC ELECL CONTNG INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/12/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
04/12/2021Heating SystemsGregory Perottospecial
04/12/2021Lowest Floor ElevationGregory Perottoprogress
04/12/2021Maintenance informationGregory Perottoenergy_progress
04/12/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
04/12/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
04/12/2021Maintenance informationGregory Perottoenergy_progress
04/12/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
04/12/2021HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
04/12/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
04/12/2021Energy Code Compliance InspectionsGregory Perottoprogress
04/12/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
10/05/2020Mechanical Systems—special
10/05/2020Final—progress
10/05/2020Electrical motors—energy_progress
▾Documents — 506 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00433862-I1Request digital key ↗
09/03/2026M00298310-I1Request digital key ↗
08/15/2026M00298310-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch3
09/03/2026M00501962-I1Request digital key ↗
09/03/2026M00501868-I1Request digital key ↗
09/03/2026M00501942-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00298306-P3Request digital key ↗
09/05/2026M00298306-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00111740-I1Request digital key ↗
▸Applications & Permits100
▸BISPLAN / WORK APPROVAL APPLICATION63
10/19/2023110120690Open ↗
08/24/2023110120690Open ↗
01/09/2023110120690Open ↗
Showing 3 of 63 on file for this type
▸BISWORK PERMIT APPLICATION35
11/23/2020123698980Open ↗
11/16/2020123698980Open ↗
11/09/2020123698980Open ↗
Showing 3 of 35 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
05/24/2021123730436Open ↗
05/24/2021123730436Open ↗
▸Seals & Professional Certifications97
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
09/21/2020123730436Open ↗
09/21/2020123730436Open ↗
01/22/2020123698980Open ↗
Showing 3 of 41 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
01/22/2020123698980Open ↗
Showing 1 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/05/2026M00111740-I1Open ↗
09/05/2026M00298306-I1Open ↗
09/05/2026M00298306-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M00501868-I1Open ↗
09/23/2026M00501868-I1Open ↗
09/23/2026M00501868-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/13/2020140964981Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/13/2020140964981Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/13/2020140964981Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M00501868-I1Open ↗
09/23/2026M00501868-I1Open ↗
09/01/2026M00501962-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
01/22/2020123698980Open ↗
▸Trade Schedules & Equipment28
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/28/2021123730436Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/28/2018123531277Open ↗
▸Safety & Tenant Protection19
▸DOB NOWTenant Protection Plan7
09/05/2026M00298306-I1Open ↗
09/05/2026M00298306-P3Open ↗
09/04/2026M00433862-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTenant Protection Plan and Notes4
06/02/2020123730436Open ↗
01/22/2020123698980Open ↗
10/31/2018123520546Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
09/21/2020123730436Open ↗
09/21/2020123730436Open ↗
09/21/2020123730436Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
09/23/2020123730436Open ↗
01/22/2020123698980Open ↗
▸BISSTREET TREE CHECKLIST2
03/22/2019123730436Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos35
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
06/01/2020123730436Open ↗
01/29/2020123698980Open ↗
10/31/2018123520546Open ↗
Showing 3 of 27 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00501942-I1Open ↗
08/13/2026M00501868-I1Open ↗
08/13/2026M00501962-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance62
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
09/21/2020123730436Open ↗
01/22/2020123698980Open ↗
05/03/2019123520546Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/23/2021123730436Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/23/2021123730436Open ↗
09/24/2021123698980Open ↗
09/24/2021123698980Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/13/2020140964981Open ↗
Showing 1 of 3 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
08/10/2022123730436Open ↗
06/10/2022123698980Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/10/2022123730436Open ↗
06/10/2022123698980Open ↗
▸BISFENESTRATION AREAS2
08/10/2022123730436Open ↗
06/10/2022123698980Open ↗
▸BISLIGHTING CONTROLS2
08/10/2022123730436Open ↗
06/10/2022123698980Open ↗
▸BISEXTERIOR LIGHTING POWER2
08/10/2022123730436Open ↗
06/10/2022123698980Open ↗
▸BISFENESTRATION AIR LEAKAGE2
08/10/2022123730436Open ↗
06/10/2022123698980Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/24/2023123730436Open ↗
09/24/2021123698980Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/10/2022123730436Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
10/13/2020140964981Open ↗
▸BISINTERIOR LIGHTING POWER1
08/10/2022123730436Open ↗
▸BISNYCECC ANALYSIS1
10/13/2020140964981Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/23/2021123730436Open ↗
09/24/2021123698980Open ↗
09/24/2021123698980Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
08/10/2022123730436Open ↗
06/10/2022123698980Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/10/2022123730436Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/10/2022123730436Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
08/10/2022123730436Open ↗
▸Approvals, Objections & Sign-offs35
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
08/16/2022123698980Open ↗
04/04/2017121526713Open ↗
Showing 2 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
07/09/2020123730436Open ↗
07/09/2020123730436Open ↗
07/09/2020123730436Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
10/16/2020123730436Open ↗
05/20/2020123730436Open ↗
12/10/2019123730436Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT32
08/15/2022123698980Open ↗
10/13/2020140964981Open ↗
08/11/2020123730436Open ↗
Showing 3 of 32 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
11/23/2020123698980Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/09/2022123698980Open ↗
▸Filing & Intake Forms54
▸BISADDITIONAL INFORMATION28
10/18/2023110120690Open ↗
07/26/2021123730436Open ↗
07/14/2021123730436Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET20
01/22/2020123698980Open ↗
03/22/2019123730436Open ↗
03/22/2019123730436Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM3
11/13/2020123698980Open ↗
11/09/2020123698980Open ↗
09/28/2020123730436Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
10/13/2020140964981Open ↗
Showing 1 of 3 on file for this type
▸Other Documents3
▸BISPLOT DIAGRAM2
06/01/2020123730436Open ↗
03/22/2019123730436Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/28/2021123730436Open ↗