RoofUnder Construction19p · 5 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
Mechanical Systems · Structural
Filing for the replacement of 2 cooling towers at the roof. No change to use, egress, or occupancy.
On file for this project
24 documents · 3 drawing sheets
BULKHEAD REPAIRS
On file for this project
2 documents · 1 drawing sheet
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with building code, chapter 33. No changes in use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Bulkhead1p · 1 filing · 2 docs
Architecture
BULKHEAD REPAIRS
On file for this project
2 documents · 1 drawing sheet
PenthouseUnder Construction13p · 1 filing · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Filing for the replacement of 2 cooling towers at the roof. No change to use, egress, or occupancy.
On file for this project
24 documents · 1 drawing sheet
Floor 59Under Construction6p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work.
On file for this project
6 documents
Floor 58
Floor 57
Floor 569p · 3 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
INTERIOR RENOVATION OF APARTMENT PHA ON THE 56TH FLOOR. RELATED MECHANICAL AND PLUMBING FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
4 documents · 3 drawing sheets
REPLACE EXISTING AC UNITS AND EXISTING BATHROOM EXHAUST GRILLES. INSTALL RADIANT HEAT IN TWO BATHROOMS. NO CHANGE IN USE OCCUPANCY OR EGRESS.
On file for this project
6 documents · 1 drawing sheet
RENOVATE BATHROOMS, KITCHEN, INSTALL LAUNDRY ROOM AND REMOVE SAUNA IN APARTMENT PHA. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
10 documents · 1 drawing sheet
Floor 55
Floor 54
Floor 53Under Construction10p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Obtain DOB approval for renovation. Scope of work: general construction and plumbing. No change in use, egress, or occupancy.
On file for this project
11 documents
Interior renovation to enlarge kitchen area, wall finish and minor floor repair work. No change of use, egress and occuphancy proposed
On file for this project
10 documents
Floor 52Under Construction11p · 1 filing · 11 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Obtain DOB approval for renovation. Scope of work: general construction and plumbing. No change in use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46Under Construction5p · 2 filings · 8 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Interior renovation of existing apartment 46A on the 46th floor architectural / construction work only.
On file for this project
5 documents
interior Plumbing work of existing apartment 46A on the 46th floor. Plumbing work only.
On file for this project
3 documents
Floor 45
Floor 44
Floor 43Under Construction3p · 2 filings · 6 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Minor renovation of existing apartment #43C on the 43th floor. Architectural/ Construction work only
On file for this project
5 documents
Minor renovation of existing apartment #43C on the 43th floor. plumbing work only
On file for this project
1 document
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 336p · 1 filing · 8 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 33B ON THE 33RD FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
Floor 32
Floor 31
Floor 30
Floor 2913p · 3 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Structural
Interior renovation of exisint apt 29D on the 29th floor, architectural/ Construction .with minor plumbing repair
On file for this project
10 documents
Minor structural work for ceiling intel
On file for this project
3 documents
PLUMBING WORKING IN APARTMENT 29HJ ON THE 29TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Floor 284p · 1 filing · 19 docs
ArchitectureDMPlumbing
Removal and installation of non-load bearing partition walls, doors, ceiling, fixtures, millwork, and flooring on dormitory floors 16-19, 28-29 Removal of a part of abandoned trash shute, new kitchenette on 28 floors. No change of use, egress, occupancy.
On file for this project
19 documents · 4 drawing sheets
Floor 274p · 1 filing · 7 docs
Fire ProtectionPlumbing
Removal and replacement of existing plumbing fixtures. Removal, and relocation of sprinkler heads, and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 4 drawing sheets
Floor 264p · 1 filing · 7 docs
Fire ProtectionPlumbing
Removal and replacement of existing plumbing fixtures. Removal, and relocation of sprinkler heads, and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 4 drawing sheets
Floor 258p · 2 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Removal and installation of non-load bearing partition walls, doors, ceiling, fixtures, millwork, and flooring as shown on drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
10 documents · 4 drawing sheets
Removal and replacement of existing plumbing fixtures. Removal, relocation, and installation of sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
10 documents · 4 drawing sheets
Floor 245p · 2 filings · 18 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work.
On file for this project
8 documents · 1 drawing sheet
Removal and replacement of existing plumbing fixtures. Removal, relocation, and installation of sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 23
Floor 221p · 1 filing · 19 docs
Structural
Removal and installation of non-load bearing partition walls, doors, ceiling, fixtures, millwork, and flooring on dormitory floors 16-19, 28-29 Removal of a part of abandoned trash shute, new kitchenette on 28 floors. No change of use, egress, occupancy.
On file for this project
19 documents · 1 drawing sheet
Floor 214p · 1 filing · 7 docs
Fire ProtectionPlumbing
Removal and replacement of existing plumbing fixtures. Removal, and relocation of sprinkler heads, and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 4 drawing sheets
Floor 205p · 1 filing · 7 docs
ArchitectureFire ProtectionPlumbing
Removal and replacement of existing plumbing fixtures. Removal, and relocation of sprinkler heads, and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 5 drawing sheets
Floor 194p · 2 filings · 20 docs
ArchitectureDMFire ProtectionPlumbing
Removal and installation of non-load bearing partition walls, doors, ceiling, fixtures, millwork, and flooring on dormitory floors 16-19, 28-29 Removal of a part of abandoned trash shute, new kitchenette on 28 floors. No change of use, egress, occupancy.
On file for this project
19 documents · 2 drawing sheets
Removal and replacement of existing plumbing fixtures. Removal, and relocation of sprinkler heads, and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 2 drawing sheets
Floor 1815p · 3 filings · 20 docs
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Structural
finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work.
On file for this project
8 documents · 1 drawing sheet
Removal and installation of non-load bearing partition walls, doors, ceiling, fixtures, millwork, and flooring on dormitory floors 16-19, 28-29 Removal of a part of abandoned trash shute, new kitchenette on 28 floors. No change of use, egress, occupancy.
On file for this project
19 documents · 6 drawing sheets
Minor structural work in conjunction with interior renovation of existing apartment. 18D on the 18th floor.
On file for this project
5 documents
Floor 172p · 1 filing · 19 docs
DMPlumbing
Removal and installation of non-load bearing partition walls, doors, ceiling, fixtures, millwork, and flooring on dormitory floors 16-19, 28-29 Removal of a part of abandoned trash shute, new kitchenette on 28 floors. No change of use, egress, occupancy.
On file for this project
19 documents · 2 drawing sheets
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 71p · 1 filing · 9 docs
General
No filed description on record for this project.
On file for this project
9 documents · 1 drawing sheet
Floor 618p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Structural work filed in conjunction with interior renovation of existing commercial space at 6th floor as shown on plans filed herewith. Also filed for installation on new convenience stair between the 5th and 6th floor.
On file for this project
40 documents · 10 drawing sheets
New fire-rated door in existing opening to the tenant suite on 6th. Part of the 6th floor changed from community Facility offices to studios, lounge, and accessory offices (same use group). Occupant load of the 6th floor increased from 120 to 200.
On file for this project
14 documents · 2 drawing sheets
SPRINKLER DEMO AND TEMPORARY LOOP AS SHOWN ON PLANS FILED HEREWITH.
On file for this project
22 documents · 4 drawing sheets
Floor 57p · 2 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Structural work filed in conjunction with interior renovation of existing commercial space at 6th floor as shown on plans filed herewith. Also filed for installation on new convenience stair between the 5th and 6th floor.
On file for this project
40 documents · 6 drawing sheets
SPRINKLER DEMO AND TEMPORARY LOOP AS SHOWN ON PLANS FILED HEREWITH.
On file for this project
22 documents · 1 drawing sheet
Floor 42p · 1 filing · 19 docs
Architecture
No filed description on record for this project.
On file for this project
19 documents · 2 drawing sheets
Floor 31p · 1 filing · 2 docs
Fire Protection
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 23p · 1 filing · 20 docs
ArchitectureFire ProtectionPlumbing
Modifications to existing ventilation system and related piping. No change in use, egress, or occupancy.
On file for this project
21 documents · 3 drawing sheets
Floor 1