DOB04/06/2026Failure to maintain building in code compliant manner. At time of inspection observed the following:multiple hazardous conditions at all view exposures and roof area. Cracks, spalled loose brown stone missing roof tiles & shingles & crack missing window pane. Remedy: repair and/or replace
DOB11/14/2025Violation issued-failure to file 2024 external low pressure inspection
DOB09/10/2025Failure to maintain building in a code compliant manner.note at time o f inspection,observed at EXP1 and EXP2 multiple areas of cracked stone spalling stone,weathered stone,missing stone in various heights and lo cations of facade.remedy:repair and/or replace
DOB03/03/2025Failure to maintain building in code compllilant manner. At time of inspection it was observed stone facade spalling at locataions, and roof sheathing loose at exposure 1. Remedy: repair and/or replace
DOB09/24/2024Failure to maintain building in code compiant manner. Observed hazardous deteriorating conditions of building at the view exposures and elevations. Loose/crack brown stone. Broken stained glass and damaged roof shingles and tiles. Remedy: replace and/or repair
DOB09/23/2024Violation issued-failure to file 2023 external low pressure inspection
DOB04/24/2024Failure to maintain.bldg in a state of disrepair at all floors there are signs of water entering the bldg envelope damaging the interior finishes.ownr to engage nys pe&licnensd cntrctr to eval the bldg&rpair undr prmt.obtain prmt&strt wrk by 7/1/24
DOB04/24/2024Ftm-exterior walks in state of disrpair.spalled &missng stonenoted thruout.@exterior walls oin 86ST,the apex of gable walls is leaning& roof framng detaching@this location.immediately comply with commissioner's order #357281
DOB01/05/2024Emergency work order due to haz.cond.observed on expo#1SOUTH elev.&exp #2WEST elev.loose spalling roof slate tiles,eroding,disintegrating masonry at several floor & locations,open mortar joints in stone work remedy:immediately repair damaged facade,repair and or replace as per code
DOB01/05/2024Failure to maintain bldge in a code compliant manner. Exp#1 south elev eroding disintegrating masonry at several floors& locations.spalling loose slate roofing shingles.expo#2 west elev.:eroding disintegrating masonry@multiple floors & locations remedy:repair& or replace damage facade
ECB01/24/2022Failure to maintain building walls or appurtance.note:at front facade exposure#1 spalling stucco at road also ornamental masonry with cracksside walk shed installed under permit#M00376493 expires 11/3/22.remedyNothing owed — awaiting certificate of correction
ECB11/10/2021Failure to maintain building wall(s) and appurtenances. At time of inspection observed masonry facade in disrepair at expo #1 where sections of facade spalling, roof ridge ornamental masonry with large crack wiNothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB06/30/2023Violation issued-failure to file 2020 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2022). This one is not shown as answered
DOB06/20/2023Violation issued-failure to file 2018 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2022). This one is not shown as answered
DOB09/15/2017Violation issued to elevator-failure to file category 1 2016 inspection/testThe owner has filed since: Category 1 elevator reports are on file for later years (latest 2017). This one is not shown as answered
DOB12/01/2016Violation issued to elevator-failure to file category 1 2015 inspection/testThe owner has filed since: Category 1 elevator reports are on file for later years (latest 2017). This one is not shown as answered
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB09/19/2023Observed at view exposure south& west elevations.damaged roof shingles broken glass pane and cracks , spalling stone at multiple locations remedy:maintain building.replace and or replaceIssued 2023; DOB's record still lists it as active
DOB05/30/2023Failure to maintain building exterior walls&facade observed spalled stone work in multiple locations on exposure#1&2(south&west elevation) also observed damaged/missing mortarjoints in multiple location.remedy maintain building exterior walls and facade.fix or replace all defects on all exposuresIssued 2023; DOB's record still lists it as active
DOB02/14/2023Failure to maintain building in code compliant manner.at the time of inspection observed on all visible exposures w.86 street elevation& amsterdam avenue elevation:spalling,damaged,disingrating masonry,open mortar joints,missing mortar joints@several fl.&location also@paprapet walls.maint.exterior bldg walls&appurt.by repairing.damage as per codeIssued 2023; DOB's record still lists it as active
DOB08/12/2022Ftm building in code compliant manner. Building facade on EXP1 amsterdam ave and EXP4 86TH st has severe masonry spalling and disintegration of masonry at several locations and floors. Remedy: repair dmamged, disintegrating facade as per codeIssued 2022; DOB's record still lists it as active
DOB02/02/2022Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2022; DOB's record still lists it as active
DOB12/09/2021Failure to comply with commish order #357279,-immed provide temporary bracing @gable wall,issued on 11/19/2021.to date no work has commenced or jobs filed with the department.immed comple with commissioner's order #357279Issued 2021; DOB's record still lists it as active
DOB11/19/2021Ftm-extrior walls in state of disrpair.spalled &missng stone noted thruout.@extrior walls on 86ST,the apex of gable wall is leaning& roof framng detaching @ this location.ownr-engage nyspe&cntrctr-setup monitorng prgram,collct data weekly&prvde rprt-xcelo@buildings.NYC.gov rpr bldg undr prmt.file for prmt by 1/15/22.strt wrk by 2/1/22Issued 2021; DOB's record still lists it as active
DOB11/19/2021Ewo-exterior wall in state of disrepair,out of plumb and leaning @the apex of the gable has displaced aprox 3".potntialof further movement affecting strctral stability of wall&public safety.ownr-engag nyspe &cntrctr-imme provid temp bracng gablewall all wrk prfrmd undr dirct&contnous pe sprvisn.file w/in 48HRIssued 2021; DOB's record still lists it as active
DOB11/10/2021Failure to maintain building in code compliant manner. At time of insp. Observed masonry fa ade in disrepair at expo #1 where sections of fa ade spalling severely, roof ridge ornamental masonry with large crack with a potential to detach & fall onto sws & deflect onto public roadway. No open job filing to rectify issue. Cited above affectsIssued 2021; DOB's record still lists it as active
DOB09/06/2019Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tstIssued 2019; DOB's record still lists it as active
DOB05/24/2019Elevator: elevatorrequired (DOB violation)Issued 2019; DOB's record still lists it as active
DOB06/25/2018Elevator: elevatorrequired (DOB violation)Issued 2018; DOB's record still lists it as active
DOB06/02/2017Elevator: elevatorrequired (DOB violation)Issued 2017; DOB's record still lists it as active