← Back
BuildNYC
Three families
1650 NEW YORK AVENUE
BROOKLYN · BIN 3205981
💬 Discuss this project
1955Year Built
3Stories
C0Building Class
R6Zoning
3,160 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Three families · 2,050 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 13p · 3 filings · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rosas Co307/15/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BVC ConsultingGeneral Contractor407/08/2026
Lintech ElectricElectrical103/22/2026
Plumbing P & HPlumbing107/08/2026
Building Lifecycle
02/21/2023
Signed off — Alteration
APPLICATION IS TO GENERATE PLANS WITH JOB NO AND IS FILED IN CONJUNCTION WITH OT B00637515-I1 AND PL B00636586-I1
B00775557-I1
10/12/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/23/2022
Signed off — Alteration
B00637515-I1
08/22/2022
Signed off — Alteration
B00636586-I1
08/22/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
25 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBVC Contracting08/04/2022
DOB NOWPlumbingSigned-offPlumbing P & H03/17/2022
DOB NOWGeneral ConstructionSigned-offBVC Contracting01/12/2022
3 projects · most recent 02/17/2022
General Wiring
FiledStatusContractorScope
02/17/2022Permit IssuedLintech ElectricGeneral Wiring
02/14/2022CancelledLintech ElectricGeneral Wiring
02/12/2022CancelledLintech ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/12/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/13/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/04/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/23/2021Insulation placement and R valuesCAROLA ROSASenergy_progress
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account