← Back
One family attached or semi-detached
1652 42 STREET
BROOKLYN · BIN 3429383
💬 Discuss this project
2023Year Built
3Stories
A5Building Class
R5Zoning
4,290 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,605 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Roof4p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar27p · 2 filings · 20 docs
2 jobs · most recent 06/05/2025
General Wiring
FiledStatusContractorScope
06/05/2025CompleteLIGHTFORCE ELECL CONTNG IGeneral Wiring
05/24/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 job · most recent 02/19/2024
Steel Concrete Masonry
FiledStatusContractorScope
02/19/2024Permit IssuedCITYSCAPE BUILDERS LLCSteel, Concrete, Masonry
1 job · most recent 02/19/2024
Earthwork Support of Excavation
FiledStatusContractorScope
02/19/2024Permit IssuedCITYSCAPE BUILDERS LLCEarthwork, Support of Excavation
Building Lifecycle
All (166)Filed (14)Permit Issued (18)Signed Off (9)Violation (2)Inspection (13)Objection (80)Special Inspection (30)
07/01/2025
Signed off — Alteration
B00273640-I1
07/01/2025
Signed off — Alteration
Proposed new curb cut filed in conjunction with GC #B00731681-I1
B00753600-I1
06/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/05/2025
Signed off — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW NEW BUILDING JOB# B00731681.
B00770015-I1
06/05/2025
Signed off — Alteration
PLUMBING PLAN FOR PIPING AND PLUMBING FIXTURES TO NEW 3 STORY 1 FAMILY BUILDING, FILED IN CONJUNCTION WITH GC# B00731681-I1
B00803041-I1
06/04/2025
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00731681-I1.
B00731681-S5
05/29/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/27/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/02/2025
Signed off — Alteration
B00880079-I1
04/07/2025
Objection resolved — Addressed
04/02/2025
Objection raised — Mechanical
03/26/2025
Permit issued — Curb Cut
B00753600-I1-CC
03/25/2025
Filed — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW NEW BUILDING JOB# B00731681.
B00770015-P1
02/24/2025
Special inspection requirement — Sprinkler Systems
JEFFREY HANDLER
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
01/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Gas-Gas-Piping-Underground
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/18/2024
Permit issued — General Construction
B00731681-I1-GC
11/14/2024
Permit issued — Construction Fence
B00273640-I1-FN
07/16/2024
Permit issued — Sprinklers
B00770015-I1-EW-SP
06/10/2024
Permit issued — Plumbing
B00803041-I1-PL
06/04/2024
Permit issued — Supported Scaffold
B00880079-I1-SF
06/03/2024
Permit issued — Supported Scaffold
B00880079-I1-SH
05/07/2024
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00731681-I1.
B00731681-S3
04/02/2024
Permit issued — Mechanical Systems
B00731681-S5-MS
02/20/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
02/19/2024
Filed — New Building
Mechanical work filed in conjunction with GC Application Job #B00731681-I1.
B00731681-S5
02/15/2024
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00731681-I1.
B00731681-S2
02/05/2024
Filed — Alteration
PLUMBING PLAN FOR PIPING AND PLUMBING FIXTURES TO NEW 3 STORY 1 FAMILY BUILDING, FILED IN CONJUNCTION WITH GC# B00731681-I1
B00803041-P1
12/26/2023
Permit issued — General Construction
B00731681-I1-GC
11/03/2023
Permit issued — Construction Fence
B00273640-I1-FN
10/16/2023
Filed — Alteration
Proposed new curb cut filed in conjunction with GC #B00731681-I1
B00753600-I1
09/29/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/14/2023
Violation issued (ECB, closed)
Construction
09/14/2023
Violation issued (ECB, closed)
Construction
08/01/2023
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
08/01/2023
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
08/01/2023
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
08/01/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
08/01/2023
Special inspection requirement — Masonry
SOORJBALLY HARILALL
08/01/2023
Special inspection requirement — Final
Soorjbally Harilall
07/26/2023
Objection resolved — Addressed
07/25/2023
Objection raised — Admin
07/20/2023
Permit issued — Sprinklers
B00770015-I1-EW-SP
07/19/2023
Filed — New Building
Mechanical work filed in conjunction with GC Application Job #B00731681-I1.
B00731681-P2
06/16/2023
Permit issued — Plumbing
B00803041-I1-PL
06/12/2023
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
06/12/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
06/12/2023
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
06/12/2023
Special inspection requirement — Final
Soorjbally Harilall
06/12/2023
Special inspection requirement — Masonry
SOORJBALLY HARILALL
06/12/2023
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
06/10/2023
Permit issued — Supported Scaffold
B00880079-I1-SH
06/10/2023
Permit issued — Supported Scaffold
B00880079-I1-SF
Latest 60 of 166 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1107/08/2026
CITYSCAPE BUILDERS903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/03/2021$1.4M—M AND R 42 LLC → Private party— not available
10/31/2019$2.3M—Private party → M AND R 42 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EYAL LEVITT ARCHITECT PC203/25/2025
ASHER ARCHITECT502/19/2024
HY PE STRUCTURAL ENGINEERING507/19/2023
ASHRAF CORP106/09/2023
REVAP CONSULTING ENGINEERS LLC112/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERETZ BUILDERS ASSISTANCE.2003/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITYSCAPE BUILDERS LLCGeneral Contractor2007/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1007/08/2026
TARGET PIPING NY LLCFire Protection207/08/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681103/25/2025
METRO FIRE CONTROL LLC4538203/25/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCITYSCAPE BUILDERS LLC03/26/2025
DOB NOWGeneral ConstructionPermit IssuedCITYSCAPE BUILDERS LLC12/18/2024
DOB NOWConstruction FenceSigned-offCITYSCAPE BUILDERS LLC11/14/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC07/16/2024
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC06/10/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/04/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/03/2024
DOB NOWMechanical SystemsSigned-offCITYSCAPE BUILDERS LLC04/02/2024
DOB NOWGeneral ConstructionPermit IssuedCITYSCAPE BUILDERS LLC12/26/2023
DOB NOWConstruction FenceSigned-offCITYSCAPE BUILDERS LLC11/03/2023
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC07/20/2023
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC06/16/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/10/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/10/2023
DOB NOWStructuralSigned-offCITYSCAPE BUILDERS LLC06/01/2023
DOB NOWGeneral ConstructionPermit IssuedCITYSCAPE BUILDERS LLC12/28/2022
DOB NOWFoundationPermit IssuedCITYSCAPE BUILDERS LLC12/12/2022
DOB NOWSupport of ExcavationSigned-offCITYSCAPE BUILDERS LLC11/25/2022
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/26/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/29/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/31/2025Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/20/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/29/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
02/24/2025Sprinkler SystemsJEFFREY HANDLERspecial
02/24/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
08/01/2023Structural Steel - WeldingSOORJBALLY HARILALLspecial
08/01/2023Structural Steel - DetailsSOORJBALLY HARILALLspecial
08/01/2023Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
08/01/2023Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
08/01/2023MasonrySOORJBALLY HARILALLspecial
08/01/2023FinalSoorjbally Harilallprogress
06/12/2023Structural Steel - DetailsSOORJBALLY HARILALLspecial
06/12/2023Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
06/12/2023Structural Steel - WeldingSOORJBALLY HARILALLspecial
06/12/2023FinalSoorjbally Harilallprogress
06/12/2023MasonrySOORJBALLY HARILALLspecial
06/12/2023Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
01/20/2023Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
01/20/2023Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
01/20/2023Subgrade InspectionsSOORJBALLY HARILALLspecial
01/13/2023Subgrade InspectionsSOORJBALLY HARILALLspecial
01/13/2023Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
01/13/2023Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
10/06/2022Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
10/03/2022Footing and FoundationSoorjbally Harilallprogress
10/03/2022FinalSoorjbally Harilallprogress
06/02/2022Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
05/06/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
Latest 25 of 38.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
08/28/2026B00803041-I1Request digital key ↗
08/28/2026B00803041-P1Request digital key ↗
08/27/2026B00880079-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00273640-I1Request digital key ↗
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
11/09/2023340857013Open ↗
08/30/2022340857013Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/30/2022340857013Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00731681-I1Open ↗
08/13/2026B00731681-S5Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00731681-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00731681-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00731681-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature15
08/25/2026B00770015-P1Open ↗
08/25/2026B00770015-P1Open ↗
08/22/2026B00731681-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/29/2026B00770015-I1Open ↗
08/28/2026B00803041-I1Open ↗
08/28/2026B00803041-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/22/2026B00731681-I1Open ↗
08/22/2026B00731681-I1Open ↗
08/22/2026B00731681-P2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/30/2022340857013Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2022340857013Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00731681-I1Open ↗
▸Safety & Tenant Protection7
▸BISBPP: STREET TREES SITE PLAN1
11/01/2023340857013Open ↗
▸BISSTREET TREE CHECKLIST1
08/30/2022340857013Open ↗
▸BISSTREET TREE SIGNOFF1
11/09/2023340857013Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00731681-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00731681-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00731681-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00731681-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00731681-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026B00731681-S1Open ↗
08/13/2026B00731681-P1Open ↗
08/13/2026B00731681-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00731681-I1Open ↗
08/13/2026B00731681-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/13/2025340857013Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2022340857013Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/30/2022340857013Open ↗
▸Other Documents5
▸BISBPP - SUPPORTING DOCUMENTATION1
11/09/2023340857013Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00731681-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00731681-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00731681-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00731681-S1Open ↗