← Back
Elevator apt, semi-fireproof with stores
1653 1 AVENUE
MANHATTAN · BIN 1050031
💬 Discuss this project
1910Year Built
4Stories
D7Building Class
C2-8AZoning
29,987 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized44 Open Violations 40 unresolved · 4 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: EAST 86 REALTY LLC · 12,156 sf lot · 2.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 4 filings · 20 docs
Floor 23Under Construction12p · 2 filings · 20 docs
Floor 22Under Construction12p · 2 filings · 20 docs
Floor 21Under Construction12p · 2 filings · 20 docs
Floor 20Under Construction12p · 2 filings · 20 docs
Floor 19Under Construction12p · 2 filings · 20 docs
Floor 18Under Construction12p · 2 filings · 20 docs
Floor 17Under Construction12p · 2 filings · 20 docs
Floor 16Under Construction12p · 3 filings · 20 docs
Floor 15Under Construction12p · 3 filings · 20 docs
Floor 14Under Construction12p · 3 filings · 20 docs
Floor 13Under Construction12p · 3 filings · 20 docs
Floor 12Under Construction12p · 3 filings · 20 docs
Floor 11Under Construction12p · 3 filings · 20 docs
Floor 10Under Construction12p · 3 filings · 20 docs
Floor 9Under Construction12p · 3 filings · 20 docs
Floor 8Under Construction12p · 3 filings · 20 docs
Floor 7Under Construction12p · 3 filings · 20 docs
Floor 6Under Construction12p · 3 filings · 20 docs
Floor 5Under Construction13p · 2 filings · 20 docs
Floor 4Under Construction13p · 4 filings · 20 docs
Floor 3Under Construction13p · 2 filings · 20 docs
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction13p · 2 filings · 20 docs
CellarUnder Construction13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1909/29/2026
CHESS BUILDERS7709/18/2026
EXTELL DEVELOPMENT404/09/2026
B CONTRACTORS GROUP103/22/2026
355 EAST 86TH STREET LP703/22/2026
YATZIV303/22/2026
BREMEN HOUSING503/22/2026
BREMSN HOUSE INC103/22/2026
THE OWNER OF103/22/2026
OLLIO REALTY CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2025$50.0M—— → —$1,667/sf building
12/21/2020$14.5M—BREMEN HOUSE, INC. → 355 EAST 86TH STREET LP$484/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1403/21/2026
BAC Developers Group1403/21/2026
YBL NY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B CONTRACTORS GROUP LLCGeneral Contractor1709/18/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor709/29/2026
METFLOW FIRE CONTROL LLCFire Protection609/17/2026
CS BRIDGE CORPGeneral Contractor403/21/2026
SIENA CONSTRUCTION LTDGeneral Contractor207/08/2026
YATZIV CORPGeneral Contractor207/08/2026
CREATIVE PLUMBING INPlumbing209/17/2026
PAUL M. & SON'S ELECL CONElectrical103/22/2026
SALAZAR, PEDROElectrical103/21/2026
SUGARMAN, IRAElectrical103/21/2026
TOVIA WERZBERGERElectrical103/21/2026
N TECH DESIGN OF AMERICAGeneral Contractor104/09/2026
BEHNAMBAKHSH, SHAYANElectrical103/21/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
CARL WEISSElectrical103/21/2026
DAVID WONEElectrical103/21/2026
M.R. ELEC'L SERVICE LLCElectrical103/22/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
OTTEN, GERALDElectrical103/21/2026
PAUL LEFKOWITZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681708/18/2026
ADROIT ENGINEERING PLLC8885202/19/2025
Building Lifecycle
All (233)Filed (42)Permit Issued (38)Signed Off (3)Violation (60)Inspection (19)Objection (38)Special Inspection (30)Tax Incentive (3)
09/28/2026
Permit issued — Protection and Mechanical Methods
M01301118-I1-PMM
09/17/2026
Permit issued — General Construction
M01142990-I1-GC
09/16/2026
Permit issued — Sprinklers
M01142990-S7-EW-SP
09/16/2026
Permit issued — Sprinklers
M01142990-S7-EW-SD
09/16/2026
Permit issued — Standpipe
M01142990-S8-EW-SD
09/16/2026
Permit issued — Plumbing
M01142990-S6-PL
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/19/2026
Objection raised — Other
08/18/2026
Filed — New Building
PROPOSED TWENTY THREE (23) MIXED-USE DEVELOPMENT.
M01142990-A2
08/18/2026
Filed — New Building
PROPOSED TWENTY THREE (23) MIXED-USE DEVELOPMENT.
M01142990-A3
08/14/2026
Permit issued — Sidewalk Shed
M01272088-I1-SH
08/05/2026
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
08/05/2026
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
08/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SOORJBALLY HARILALL
08/05/2026
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
08/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SOORJBALLY HARILALL
08/05/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
08/05/2026
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
08/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SOORJBALLY HARILALL
08/05/2026
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
08/03/2026
Filed — Alteration
INSTALLATION OF NEW PUMP JACK SCAFFOLD AS PER PLANS
M01439330-I1
08/01/2026
485-x construction completed
07/30/2026
Filed — New Building
PROPOSED TWENTY THREE (23) MIXED-USE DEVELOPMENT.
M01142990-A1
07/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
07/27/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
07/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/02/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/01/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Protection of exposed foundation insulation
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Air barrier continuity plan testing
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Luminous Exit Path Markings
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Lighting in dwelling units
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/25/2026
Permit issued — Structural
M01142990-S3-ST
06/25/2026
Permit issued — Earth Work
M01142990-S2-FO-EA
06/19/2026
Filed — New Building
PROPOSED TWENTY THREE (23) MIXED-USE DEVELOPMENT.
M01142990-P9
06/18/2026
Permit issued — Mechanical Systems
M01142990-S1-MS
Latest 60 of 233 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.09/28/2026
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC09/17/2026
DOB NOWSprinklersPermit IssuedMETFLOW FIRE CONTROL LLC09/16/2026
DOB NOWSprinklersPermit IssuedMETFLOW FIRE CONTROL LLC09/16/2026
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC09/16/2026
DOB NOWPlumbingPermit IssuedCREATIVE PLUMBING IN09/16/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/14/2026
DOB NOWStructuralPermit IssuedB CONTRACTORS GROUP LLC06/25/2026
DOB NOWEarth WorkPermit IssuedB CONTRACTORS GROUP LLC06/25/2026
DOB NOWMechanical SystemsPermit IssuedB CONTRACTORS GROUP LLC06/18/2026
DOB NOWConstruction FencePermit IssuedB CONTRACTORS GROUP LLC06/12/2026
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP05/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC03/10/2026
DOB NOWEarth WorkPermit IssuedB CONTRACTORS GROUP LLC01/15/2026
DOB NOWStructuralPermit IssuedB CONTRACTORS GROUP LLC12/16/2025
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC12/12/2025
DOB NOWConstruction FencePermit IssuedB CONTRACTORS GROUP LLC11/03/2025
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC10/14/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC10/14/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC10/10/2025
DOB NOWSprinklersPermit IssuedMETFLOW FIRE CONTROL LLC09/18/2025
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC09/18/2025
DOB NOWSprinklersPermit IssuedMETFLOW FIRE CONTROL LLC09/18/2025
DOB NOWPlumbingPermit IssuedAB PLUMBING INC09/17/2025
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC08/15/2025
DOB NOWSupport of ExcavationSigned-offB CONTRACTORS GROUP LLC07/09/2025
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC07/07/2025
DOB NOWEarth WorkPermit IssuedB CONTRACTORS GROUP LLC07/03/2025
DOB NOWStructuralPermit IssuedB CONTRACTORS GROUP LLC06/20/2025
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC06/18/2025
DOB NOWConstruction FencePermit IssuedB CONTRACTORS GROUP LLC06/12/2025
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP12/18/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP12/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offYATZIV CORP12/03/2024
DOB NOWFull DemolitionSigned-offYATZIV CORP12/03/2024
DOB NOWConstruction FencePermit IssuedN TECH DESIGN OF AMERICA11/15/2024
DOB NOWGeneral ConstructionPermit IssuedSIENA CONSTRUCTION LTD10/13/2021
DOB NOWGeneral ConstructionPermit IssuedSIENA CONSTRUCTION LTD09/17/2021
BISPLISSUEDA.R.L. PLUMBING & HTG LLC02/11/2019
BISMHISSUEDPM MECHANICAL GROUP CORP01/29/2019
+ 31 more permits on file
1 project · most recent 08/18/2026
Sprinkler System
FiledStatusContractorScope
08/18/2026Permit IssuedMETFLOW FIRE CONTROL LLCSprinkler System
1 project · most recent 08/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/18/2026Permit IssuedMETFLOW MECHANICAL LLCGas, Storm, Water/Sanitary
8 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
12/22/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
08/19/2025Permit IssuedSOLAS ELECTRICAL CORP—
04/07/2025Permit IssuedHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
04/07/2025Permit IssuedHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
01/07/2025CompleteNASH ELECTRIC SERVICES IN—
03/01/2021Permit IssuedPAUL M. & SON'S ELECL CONGeneral Wiring
02/08/2018CompleteCORE ELECTRICAL CORP—
1 project · most recent 08/18/2026
Concrete
FiledStatusContractorScope
08/18/2026Permit IssuedB CONTRACTORS GROUP LLCConcrete
4 projects · most recent 08/18/2026
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
08/18/2026Permit IssuedB CONTRACTORS GROUP LLCFence
08/03/2026——Scaffold
06/11/2026Permit IssuedCORE SCAFFOLD SYSTEMS INCScaffold
01/29/2026Permit IssuedCORE SCAFFOLD SYSTEMS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
07/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/02/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/14/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/17/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
02/17/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
02/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2026Pass-Final PL - UndergroundPassView ↗
12/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
08/05/2026Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
08/05/2026Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
08/05/2026Subsurface Conditions – Fill Placement & In-Place DensitySOORJBALLY HARILALLspecial
08/05/2026Subgrade InspectionsSOORJBALLY HARILALLspecial
08/05/2026Structural Steel - WeldingSOORJBALLY HARILALLspecial
08/05/2026Structural Steel - DetailsSOORJBALLY HARILALLspecial
08/05/2026Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
08/05/2026Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
08/05/2026FinalSOORJBALLY HARILALLprogress
07/27/2026HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
07/27/2026HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
07/27/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
07/27/2026HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
07/27/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
07/01/2026MeteringSOORJBALLY HARILALLenergy_progress
07/01/2026Interior lighting powerSOORJBALLY HARILALLenergy_progress
07/01/2026Protection of exposed foundation insulationSOORJBALLY HARILALLenergy_progress
07/01/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
07/01/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
07/01/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
07/01/2026Lighting in dwelling unitsSOORJBALLY HARILALLenergy_progress
07/01/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
07/01/2026Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
07/01/2026Luminous Exit Path MarkingsSOORJBALLY HARILALLspecial
Latest 25 of 95.
▾Documents — 298 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
09/03/2026M00583587-I1Request digital key ↗
09/03/2026M00592650-I1Request digital key ↗
08/25/2026M01136719-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION16
02/12/2019123665514Open ↗
01/30/2019123665514Open ↗
06/01/2016122772320Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
07/26/2024123905881Open ↗
11/17/2022123905881Open ↗
11/17/2022123905881Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/03/2025141027127Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram6
08/22/2026M01142990-I1Open ↗
08/22/2026M01142990-P9Open ↗
08/14/2026M01142990-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/22/2026M01142990-P9Open ↗
08/13/2026M01142990-I1Open ↗
08/13/2026M01142990-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M01142990-P1Open ↗
08/13/2026M01142990-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/12/2025141027127Open ↗
▸Seals & Professional Certifications99
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/03/2026M00583587-I1Open ↗
08/25/2026M01073648-I1Open ↗
08/25/2026M01153241-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026M01142990-S1Open ↗
09/23/2026M01142990-S1Open ↗
09/01/2026M01142990-S4Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
01/28/2019123665514Open ↗
04/29/2016122772320Open ↗
05/24/2013121618712Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M01142990-S1Open ↗
09/01/2026M01142990-I1Open ↗
09/01/2026M01142990-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
07/27/2011120764253Open ↗
04/29/2011120666608Open ↗
06/26/2008110222811Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/28/2019123665514Open ↗
07/27/2011120764253Open ↗
06/26/2008110222811Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/28/2019123665514Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/03/2025141027127Open ↗
▸Trade Schedules & Equipment20
▸BISSELF-CERT PLUMBING NOTICE4
10/11/2011120666608Open ↗
06/21/2011120666608Open ↗
08/28/2008110222811Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
01/28/2019123665514Open ↗
01/15/2010110222811Open ↗
07/02/2009110222811Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/22/2026M01142990-I1Open ↗
08/13/2026M01142990-P1Open ↗
08/13/2026M01142990-I1Open ↗
▸BISSCHEDULE B - PLUMBING2
05/05/2011120666608Open ↗
06/26/2008110222811Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/28/2019123665514Open ↗
04/29/2016122772320Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026M01073648-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026M01073648-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026M01073648-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026M01073648-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/22/2026M01142990-I1—
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/22/2026M01142990-I1Open ↗
08/22/2026M01142990-P9Open ↗
08/14/2026M01142990-P1Open ↗
▸BISTenant Protection Plan and Notes1
01/28/2019123665514Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/12/2025141027127Open ↗
▸BISSTREET TREE CHECKLIST1
03/03/2025141027127Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M01142990-I1Open ↗
▸Environmental & Asbestos9
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
07/27/2011120764253Open ↗
04/29/2011120666608Open ↗
06/26/2008110222811Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00583587-I1Open ↗
08/25/2026M01073648-I1Open ↗
08/13/2026M01073648-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRodent Control1
08/13/2026M01073648-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/28/2019123665514Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/22/2026M01142990-A3Open ↗
08/13/2026M01142990-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M01142990-S4Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS4
07/27/2011120764253Open ↗
04/29/2011120666608Open ↗
06/26/2008110222811Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/22/2017122772320Open ↗
01/28/2013120764253Open ↗
01/15/2010110222811Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/22/2017122772320Open ↗
01/15/2010110222811Open ↗
▸BISFA LETTER OF DEFECT : FD-FALD1
05/22/2017122772320Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
01/28/2019123665514Open ↗
05/22/2017122772320Open ↗
04/29/2016122772320Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
11/17/2022123905881Open ↗
11/17/2022123905881Open ↗
01/28/2019123665514Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
07/26/2024123905881Open ↗
11/17/2022123905881Open ↗
11/17/2022123905881Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
03/03/2025141027127Open ↗
▸BISADDITIONAL INFORMATION1
05/12/2025141027127Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/03/2025141027127Open ↗
▸Other Documents40
▸DOB NOWDHCR Document17
08/22/2026M01142990-A2Open ↗
08/22/2026M01142990-A1Open ↗
08/22/2026M01142990-P9Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProperty Ownership Certification5
08/25/2026M01073648-I1Open ↗
08/22/2026M01142990-I1Open ↗
08/22/2026M01142990-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/22/2026M01142990-P9Open ↗
08/13/2026M01142990-P1Open ↗
08/13/2026M00573356-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/22/2026M01142990-P9Open ↗
08/13/2026M01142990-P1Open ↗
08/13/2026M01142990-I1Open ↗
▸DOB NOWStructure Photographs2
08/25/2026M01073648-I1Open ↗
08/13/2026M01073648-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026M01142990-S4Open ↗
08/13/2026M01142990-S2Open ↗
▸BISDHCR DOCUMENT1
08/20/2025141027127Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/12/2025141027127Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/12/2025141027127Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/12/2025141027127Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026M01073648-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M00573356-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026M01073648-I1Open ↗