BROOKLYN
1654 42 STREET
BROOKLYN · BIN 3429384
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof24p · 1 filing · 20 docs
Floor 325p · 1 filing · 20 docs
Floor 223p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar35p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY704/09/2026
CITYSCAPE BUILDERS203/22/2026
BROOKLYN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHER ARCHITECT711/21/2024
EYAL LEVITT ARCHITECT PC209/30/2024
HY PE STRUCTURAL ENGINEERING407/19/2023
ASHRAF CORP106/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERETZ BUILDERS ASSISTANCE.2203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITYSCAPE BUILDERS LLCGeneral Contractor907/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor404/09/2026
TARGET PIPING NY LLCFire Protection207/08/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
LIGHTFORCE ELECL CONTNG IElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681311/21/2024
METRO FIRE CONTROL LLC4538209/30/2024
Building Lifecycle
All (153)Filed (14)Permit Issued (15)Signed Off (7)Violation (2)Inspection (9)Objection (76)Special Inspection (30)
07/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/16/2025
Signed off — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW NEW BUILDING JOB# B00750434.
B00770149-I1
05/16/2025
Signed off — Alteration
PLUMBING PLAN FOR PIPING AND PLUMBING FIXTURES TO NEW 3 STORY BUILDING, FILED IN CONJUNCTION WITH GC#B00750434-I1
B00803069-I1
05/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2025
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00750434-I1.
B00750434-S5
04/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/21/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00880094-I1
01/07/2025
Special inspection requirement — Sprinkler Systems
JEFFREY HANDLER
01/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
01/03/2025
Objection resolved — Addressed
12/26/2024
Special inspection requirement — Maintenance information
Soorjbally Harilall
12/26/2024
Special inspection requirement — Electric vehicle service equipment requirements
Soorjbally Harilall
12/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
12/26/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
12/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
12/26/2024
Special inspection requirement — Fenestration areas
Soorjbally Harilall
12/26/2024
Special inspection requirement — Air barrier — testing
Soorjbally Harilall
12/26/2024
Special inspection requirement — Permanent certificate
Soorjbally Harilall
12/26/2024
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
12/26/2024
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
12/26/2024
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
12/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
12/26/2024
Special inspection requirement — Interior lighting power
Soorjbally Harilall
12/26/2024
Special inspection requirement — Metering
Soorjbally Harilall
12/26/2024
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
12/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
12/20/2024
Objection resolved — Addressed
12/20/2024
Objection resolved — Addressed
12/18/2024
Permit issued — General Construction
B00750434-I1-GC
12/03/2024
Special inspection requirement — Maintenance information
Soorjbally Harilall
12/03/2024
Special inspection requirement — Ventilation and air distribution system
Soorjbally Harilall
12/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
12/03/2024
Special inspection requirement — Final
Soorjbally Harilall
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
12/03/2024
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
12/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
12/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
11/29/2024
Objection raised — Scope
11/29/2024
Objection resolved — Addressed
11/21/2024
Filed — New Building
Mechanical work filed in conjunction with GC Application Job #B00750434-I1.
B00750434-P4
11/21/2024
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
11/21/2024
Special inspection requirement — Final
Soorjbally Harilall
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
11/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
11/04/2024
Objection raised — Other
10/28/2024
Objection resolved — Addressed
10/22/2024
Objection raised — Structural
10/22/2024
Objection raised — Other
10/15/2024
Filed — New Building
Mechanical work filed in conjunction with GC Application Job #B00750434-I1.
B00750434-P3
10/02/2024
Objection raised — Scope
09/30/2024
Filed — Alteration
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW NEW BUILDING JOB# B00750434.
B00770149-P1
07/16/2024
Permit issued — Sprinklers
B00770149-I1-EW-SP
06/24/2024
Permit issued — Plumbing
B00803069-I1-PL
06/07/2024
Permit issued — Supported Scaffold
B00880094-I1-SF
06/06/2024
Permit issued — Sidewalk Shed
B00880094-I1-SH
04/02/2024
Permit issued — Mechanical Systems
B00750434-S5-MS
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCITYSCAPE BUILDERS LLC12/18/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC07/16/2024
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC06/24/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/07/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/06/2024
DOB NOWMechanical SystemsSigned-offCITYSCAPE BUILDERS LLC04/02/2024
DOB NOWGeneral ConstructionPermit IssuedCITYSCAPE BUILDERS LLC12/26/2023
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC07/20/2023
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC06/27/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/10/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/10/2023
DOB NOWStructuralSigned-offCITYSCAPE BUILDERS LLC06/01/2023
DOB NOWGeneral ConstructionPermit IssuedCITYSCAPE BUILDERS LLC12/27/2022
DOB NOWFoundationPermit IssuedCITYSCAPE BUILDERS LLC12/12/2022
DOB NOWSupport of ExcavationSigned-offCITYSCAPE BUILDERS LLC11/25/2022
1 project · most recent 11/21/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/21/2024Permit IssuedCITYSCAPE BUILDERS LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAM2 48,000 BTU · Condensing Unit ×10
MXZ-SM36NAM2 36,000 BTU · Condensing Unit ×5
PUHY-P72TNU-A 72,000 BTU · Vrf Outdoor ×5
Ventilation
Nutone AEN110 110 CFM · Exhaust Fan ×35
QTXEN150 150 CFM · Exhaust Fan ×5
2 projects · most recent 04/30/2025
General Wiring
FiledStatusContractorScope
04/30/2025CompleteLIGHTFORCE ELECL CONTNG IGeneral Wiring
05/24/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 11/21/2024
Steel Concrete Masonry
FiledStatusContractorScope
11/21/2024Permit IssuedCITYSCAPE BUILDERS LLCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2025Fail-Final CND-Occupancy InspectionFailView ↗
05/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/29/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
01/07/2025Sprinkler SystemsJEFFREY HANDLERspecial
01/07/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
12/26/2024Maintenance informationSoorjbally Harilallenergy_progress
12/26/2024Insulation placement and R valuesSoorjbally Harilallenergy_progress
12/26/2024Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
12/26/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
12/26/2024Energy Code Compliance InspectionsSoorjbally Harilallprogress
12/26/2024Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
12/26/2024Electric vehicle service equipment requirementsSoorjbally Harilallenergy_progress
12/26/2024Permanent certificateSoorjbally Harilallenergy_progress
12/26/2024Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
12/26/2024Air barrier - visual inspectionSoorjbally Harilallenergy_progress
12/26/2024Fenestration air leakageSoorjbally Harilallenergy_progress
12/26/2024MeteringSoorjbally Harilallenergy_progress
12/26/2024Interior lighting powerSoorjbally Harilallenergy_progress
12/26/2024Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
12/26/2024Fenestration areasSoorjbally Harilallenergy_progress
12/26/2024Air barrier — testing Soorjbally Harilallenergy_progress
12/03/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
12/03/2024FinalSoorjbally Harilallprogress
12/03/2024HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
12/03/2024Ventilation and air distribution systemSoorjbally Harilallenergy_progress
12/03/2024Maintenance informationSoorjbally Harilallenergy_progress
12/03/2024HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
12/03/2024HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
Latest 25 of 74.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026B00880094-I1Request digital key ↗
08/26/2026B00750434-S5Request digital key ↗
08/26/2026B00750434-S3Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00750434-P3Open ↗
08/13/2026B00750434-P2Open ↗
08/13/2026B00750434-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00750434-P2Open ↗
08/13/2026B00750434-P3Open ↗
08/13/2026B00750434-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00750434-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWSpecial Inspector Seal & Signature20
09/29/2026B00750434-I1Open ↗
09/29/2026B00750434-I1Open ↗
09/14/2026B00750434-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/29/2026B00750434-I1Open ↗
09/29/2026B00750434-I1Open ↗
09/29/2026B00750434-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026B00750434-S3Open ↗
08/26/2026B00750434-S5Open ↗
08/26/2026B00750434-P2Open ↗
Showing 3 of 14 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00750434-P3Open ↗
08/13/2026B00750434-P2Open ↗
08/13/2026B00750434-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/15/2026B00750434-I1Open ↗
08/14/2026B00750434-P2Open ↗
08/13/2026B00750434-P3Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00750434-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00750434-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00750434-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00750434-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026B00750434-P3Open ↗
08/13/2026B00750434-P2Open ↗
08/13/2026B00750434-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00750434-S1Open ↗
08/13/2026B00750434-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026B00750434-P2Open ↗
08/13/2026B00750434-I1Open ↗
08/13/2026B00750434-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00750434-P3Open ↗
08/13/2026B00750434-P2Open ↗
08/13/2026B00750434-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/15/2026B00750434-I1Open ↗
08/14/2026B00750434-P2Open ↗
08/13/2026B00750434-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00750434-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00750434-S1Open ↗