Walk-up cooperative
166-02 17 ROAD
QUEENS · BIN 4443684
💬 Discuss this project
1951Year Built
2Stories
C6Building Class
R3-2Zoning
169,702 sfGross Floor Area
192Units
LL97 CoveredRent Stabilized3 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: CLEARVIEW GARDNS 3RD CORP · 390,209 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar5p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLEARVIEW GARDENS804/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIDERIS KEFALAS ENGINEERS PC203/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KONARZEWSKI, TADEUSZElectrical203/21/2026
SAUBERMAN, ALVINElectrical203/21/2026
ANDREW LIVADITISElectrical103/21/2026
FERRITO, ROBERTElectrical103/21/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323203/21/2025
Building Lifecycle
All (12)Filed (2)Permit Issued (1)Violation (1)Inspection (4)Special Inspection (4)
03/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
03/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Alicea
03/21/2025
Filed — Alteration
Due to fire, the main gas distribution pipe in the cellar is being replaced along with the meter bars. The risers shall remain and be reused. The gas meters will be reused.
Q01157034-P1
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
03/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Alicea
02/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/22/2025
Permit issued — Plumbing
Q01157034-I1-PL
01/14/2025
Filed — Alteration
Due to fire, the main gas distribution pipe in the cellar is being replaced along with the meter bars. The risers shall remain and be reused. The gas meters will be reused.
Q01157034-I1
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedD.D.S. MECH PBG&HTG CORP01/22/2025
1 project · most recent 03/21/2025
Gas
FiledStatusContractorScope
03/21/2025Permit IssuedD.D.S. MECH PBG&HTG CORPGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/23/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
03/23/2025Tenant Protection Plan ComplianceWilliam Aliceaspecial
03/18/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
03/18/2025Tenant Protection Plan ComplianceWilliam Aliceaspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01157034-P1Request digital key ↗
08/20/2026Q01157034-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026Q01157034-P1Open ↗
08/20/2026Q01157034-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01157034-I1Open ↗
08/25/2026Q01157034-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01157034-I1Open ↗
08/20/2026Q01157034-P1Open ↗