Large suburban residence
166-07 24TH AVENUE
QUEENS · BIN 4129388
💬 Discuss this project
1930Year Built
2.5Stories
A3Building Class
R2AZoning
3,011 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Large suburban residence · 5,358 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential solar electric generation array installation13p · 3 filings · 20 docs
Floor 2New Shed and 2nd Floor Balcony Construction12p · 3 filings · 20 docs
Floor 1New Shed and 2nd Floor Balcony Construction12p · 3 filings · 20 docs
CellarNew Shed and 2nd Floor Balcony Construction16p · 5 filings · 20 docs
Site & exteriorOne Family Home Renovation3p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2020$895K—Private party → Private party$297/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Momentum Solar206/21/2024
Node Architecture, Engineering, Cons905/12/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Node Arch Engin Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Node Systems and AssembliGeneral Contractor610/04/2026
Node Systems and AssembliScaffold303/21/2026
Bay RestorationScaffold107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV Sia9281206/21/2024
International Geotehcnica1795302/01/2022
Node Architecture, Engineering6799402/01/2022
Building Lifecycle
All (58)Filed (11)Permit Issued (8)Signed Off (7)Violation (5)Inspection (2)Special Inspection (25)
07/23/2024
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
Q01031312-I1
06/21/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
Q01031312-P1
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/21/2024
Special inspection requirement — Final
Mina Makar
06/21/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
04/15/2024
Permit issued — Solar
Q01031312-I1-SL
04/10/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
Q01031312-I1
08/02/2022
Signed off — Alteration
STRUCTURAL WORK AS PER PLANS IN CONJUNCTION WITH ALT-1 APPLICATION #421787855.
Q00437535-I1
07/29/2022
Signed off — Alteration
Q00526200-I1
07/26/2022
Signed off — Alteration
Plumbing work filed as per plans in conjunction with ALT-1 Application #421787855
Q00437524-I1
05/23/2022
Signed off — Alteration
Mechanical work filed as per plans in conjunction with ALT-1 Application #421787855
Q00437528-I1
05/12/2022
Filed — Alteration
Plumbing work filed as per plans in conjunction with ALT-1 Application #421787855
Q00437524-P2
04/19/2022
Filed — Alteration
Plumbing work filed as per plans in conjunction with ALT-1 Application #421787855
Q00437524-P1
02/11/2022
Signed off — Alteration
Construction Fence filed in conjunction with Demo Application #421785893 and GC Application Number #Q00449682-I1.
Q00437533-I1
02/02/2022
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
02/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
02/02/2022
Special inspection requirement — Final
Radomir Delic
02/02/2022
Special inspection requirement — Duct leakage testing
MICHAEL KARANTINIDIS, P.E.
02/02/2022
Special inspection requirement — HVAC and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
02/02/2022
Special inspection requirement — Electrical energy consumption
MICHAEL KARANTINIDIS, P.E.
02/02/2022
Special inspection requirement — HVAC and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
02/02/2022
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
02/02/2022
Special inspection requirement — Shutoff dampers
MICHAEL KARANTINIDIS, P.E.
02/02/2022
Special inspection requirement — HVAC insulation and sealing
MICHAEL KARANTINIDIS, P.E.
02/01/2022
Filed — Alteration
Mechanical work filed as per plans in conjunction with ALT-1 Application #421787855
Q00437528-P1
02/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
02/01/2022
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
02/01/2022
Special inspection requirement — Final
Radomir Delic
02/01/2022
Special inspection requirement — Duct leakage testing
MICHAEL KARANTINIDIS, P.E.
02/01/2022
Special inspection requirement — Electrical energy consumption
MICHAEL KARANTINIDIS, P.E.
02/01/2022
Special inspection requirement — HVAC and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
02/01/2022
Special inspection requirement — HVAC insulation and sealing
MICHAEL KARANTINIDIS, P.E.
02/01/2022
Special inspection requirement — HVAC and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
02/01/2022
Special inspection requirement — Shutoff dampers
MICHAEL KARANTINIDIS, P.E.
02/01/2022
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
11/04/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/29/2021
Signed off — Alteration
Q00518559-I1
07/18/2021
Permit issued — Structural
Q00437535-I1-ST
07/15/2021
Violation issued (ECB, closed)
Construction
07/15/2021
Violation issued (ECB, closed)
Unknown
07/15/2021
Violation issued (ECB, closed)
Site Safety
07/15/2021
Violation issued (ECB, closed)
Construction
07/15/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Permit issued — Earth Work
Q00518559-I1-EA
07/12/2021
Permit issued — Construction Fence
Q00437533-I1-FN
06/17/2021
Filed — Alteration
STRUCTURAL WORK AS PER PLANS IN CONJUNCTION WITH ALT-1 APPLICATION #421787855.
Q00437535-I1
06/14/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/08/2021
Permit issued — Mechanical Systems
Q00437528-I1-MS
06/08/2021
Permit issued — Plumbing
Q00437524-I1-PL
05/30/2021
Filed — Alteration
Plumbing work filed as per plans in conjunction with ALT-1 Application #421787855
Q00437524-I1
05/30/2021
Filed — Alteration
Mechanical work filed as per plans in conjunction with ALT-1 Application #421787855
Q00437528-I1
05/27/2021
Permit issued — Foundation
Q00526200-I1-FO
05/21/2021
Filed — Alteration
Q00526200-I1
05/12/2021
Filed — Alteration
Q00518559-I1
02/01/2021
Permit issued — Construction Fence
Q00437533-I1-FN
01/20/2021
Filed — Alteration
Construction Fence filed in conjunction with Demo Application #421785893 and GC Application Number #Q00449682-I1.
Q00437533-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMomentum Solar04/15/2024
DOB NOWStructuralSigned-offNode Systems and Assembli07/18/2021
DOB NOWEarth WorkSigned-offNode Systems and Assembli07/14/2021
DOB NOWConstruction FenceSigned-offNode Systems and Assembli07/12/2021
DOB NOWMechanical SystemsSigned-offNode Systems and Assembli06/08/2021
DOB NOWPlumbingSigned-offP.S.I. Mechanical06/08/2021
DOB NOWFoundationSigned-offNode Systems and Assembli05/27/2021
DOB NOWConstruction FenceSigned-offBay Restoration02/01/2021
BIS—ISSUEDEuro Group Design Group02/28/2022
2 projects · most recent 04/10/2024
General Wiring
FiledStatusContractorScope
04/10/2024CompleteIsland Electric—
06/14/2021CompleteBlasko Elect'l ContractorsGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/04/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/14/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
06/21/2024Fire-Resistant Penetrations and JointsMina Makarspecial
06/21/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
06/21/2024Energy Code Compliance InspectionsMina Makarprogress
06/21/2024FinalMina Makarprogress
06/21/2024Air barrier - visual inspectionMina Makarenergy_progress
02/02/2022Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
02/02/2022Fire-Resistant Penetrations and JointsRadomir Delicspecial
02/02/2022FinalRadomir Delicprogress
02/02/2022Duct leakage testing MICHAEL KARANTINIDIS, P.E.energy_progress
02/02/2022HVAC and service water heating system controls MICHAEL KARANTINIDIS, P.E.energy_progress
02/02/2022Electrical energy consumptionMICHAEL KARANTINIDIS, P.E.energy_progress
02/02/2022HVAC and service water heating equipment MICHAEL KARANTINIDIS, P.E.energy_progress
02/02/2022Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
02/02/2022Shutoff dampersMICHAEL KARANTINIDIS, P.E.energy_progress
02/02/2022HVAC insulation and sealing MICHAEL KARANTINIDIS, P.E.energy_progress
02/01/2022Fire-Resistant Penetrations and JointsRadomir Delicspecial
02/01/2022Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
02/01/2022FinalRadomir Delicprogress
02/01/2022Duct leakage testing MICHAEL KARANTINIDIS, P.E.energy_progress
02/01/2022Electrical energy consumptionMICHAEL KARANTINIDIS, P.E.energy_progress
02/01/2022HVAC and service water heating equipment MICHAEL KARANTINIDIS, P.E.energy_progress
02/01/2022HVAC insulation and sealing MICHAEL KARANTINIDIS, P.E.energy_progress
02/01/2022HVAC and service water heating system controls MICHAEL KARANTINIDIS, P.E.energy_progress
02/01/2022Shutoff dampersMICHAEL KARANTINIDIS, P.E.energy_progress
02/01/2022Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch3
08/27/2026Q00526200-I1Request digital key ↗
08/22/2026Q01031312-P1Request digital key ↗
08/22/2026Q01031312-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026Q00437524-I1Request digital key ↗
08/26/2026Q00437524-P2Request digital key ↗
08/26/2026Q00437524-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00437528-I1Request digital key ↗
08/27/2026Q00437528-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/27/2026Q00437535-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00437533-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION23
10/28/2025440665102Open ↗
01/31/2024421787855Open ↗
11/15/2023421787855Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION2
06/03/2022421787855Open ↗
05/26/2021421787855Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/26/2021421787855Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/22/2022440692467Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING RESOLUTION DETERMINATION4
03/13/2024421787855Open ↗
03/13/2024421787855Open ↗
10/30/2023421787855Open ↗
Showing 3 of 4 on file for this type
▸BISZONING DIAGRAM2
11/08/2023421787855Open ↗
05/06/2021421787855Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/06/2021421787855Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/06/2021421787855Open ↗
▸BISVERIFY TAX LOT1
08/01/2022421787855Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/23/2021421787855Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026Q00437528-I1Open ↗
09/01/2026Q00437528-I1Open ↗
09/01/2026Q00437528-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00437533-I1Open ↗
08/27/2026Q00526200-I1Open ↗
08/27/2026Q00437528-P1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
04/18/2022440692467Open ↗
03/29/2022440692467Open ↗
11/21/2021440692467Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00437528-I1Open ↗
09/01/2026Q00437528-I1Open ↗
08/25/2026Q00437528-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/21/2021440692467Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST5
04/18/2022440692467Open ↗
03/29/2022440692467Open ↗
11/21/2021440692467Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE SIGNOFF1
01/05/2022421787855Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/12/2021421787855Open ↗
▸BISSTREET TREES SITE PLAN1
11/24/2021421787855Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026Q00526200-I1Open ↗
08/27/2026Q00437528-P1Open ↗
08/27/2026Q00437528-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/06/2021421787855Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/12/2021421787855Open ↗
05/11/2021421787855Open ↗
05/06/2021421787855Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/25/2022421787855Open ↗
▸BISINTERIOR LIGHTING POWER1
03/25/2022421787855Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/25/2022421787855Open ↗
▸BISFENESTRATION AREAS1
03/25/2022421787855Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/25/2022421787855Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/25/2022421787855Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/25/2022421787855Open ↗
▸BISLIGHTING CONTROLS1
03/25/2022421787855Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00437528-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/21/2021421787855Open ↗
05/12/2021421787855Open ↗
05/12/2021421787855Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
08/05/2021421787855Open ↗
08/05/2021421787855Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/23/2022421787855Open ↗
08/05/2021421787855Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
03/25/2022421787855Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
10/31/2023421787855Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
06/02/2022421787855Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/25/2022421787855Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/25/2022421787855Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
03/25/2022421787855Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/25/2022421787855Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/06/2021421787855Open ↗
▸BISSOIL REPORT1
05/06/2021421787855Open ↗
▸Approvals, Objections & Sign-offs22
▸BISSCHEDULE A - OCCUPANCY / USE13
01/31/2024421787855Open ↗
11/15/2023421787855Open ↗
11/03/2023421787855Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
03/13/2024421787855Open ↗
03/13/2024421787855Open ↗
03/13/2024421787855Open ↗
Showing 3 of 7 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
09/26/2024421787855Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01031312-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
05/06/2021421787855Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/11/2022421787855Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION9
10/04/2024421787855Open ↗
03/13/2024421787855Open ↗
10/30/2023421787855Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/21/2021440692467Open ↗
02/15/2021440665102Open ↗
▸BISBOROUGH INTAKE FORM1
04/01/2021421787855Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/29/2022440692467Open ↗
▸BISEFILING COVER SHEET1
04/01/2021421787855Open ↗
▸Other Documents22
▸BISBPP - SUPPORTING DOCUMENTATION7
04/18/2022440692467Open ↗
04/18/2022440692467Open ↗
04/18/2022440692467Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Exempt2
01/25/2024421787855Open ↗
01/25/2024421787855Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00518559-I1Open ↗
08/13/2026Q00526200-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/13/2024421787855Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/25/2024421787855Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/18/2022440692467Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
03/25/2022421787855Open ↗
▸BISMAINTENANCE INFORMATION1
03/25/2022421787855Open ↗
▸BISPERMANENT CERTIFICATE1
03/25/2022421787855Open ↗
▸BISPLOT DIAGRAM1
05/06/2021421787855Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
03/25/2022421787855Open ↗
▸BISSHED MUST BE 3' FROM PL1
11/08/2023421787855Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/25/2022421787855Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00518559-I1Open ↗