| Owner | Filings | Most Recent |
|---|---|---|
| Shafiqulislam | 3 | 07/08/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/20/2023 | $1.3M | — | YARAN HOMES CORP. → Private party | $542/sf building |
| 05/06/2022 | $500K | — | — → — | $208/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| Parker and West Engineering | 1 | 12/22/2023 |
| CL Engineering | 6 | 06/13/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| Metro Design | 12 | 03/21/2026 |
| Sunrun | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| J&J Designs | General Contractor | 2 | 07/08/2026 |
| Sunrun Installation Service | General Contractor | 1 | 07/08/2026 |
| J&J Designs | Scaffold | 1 | 07/08/2026 |
| All Pro Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Parker and West Engineering | 5272 | 1 | 12/22/2023 |
| CL Engineering | 6781 | 4 | 06/13/2023 |
| Triangle Inspection & Tes | 7495 | 2 | 05/31/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Solar | Signed-off | Sunrun Installation Service | 12/29/2023 |
| DOB NOW | Curb Cut | Signed-off | J&J Designs | 07/14/2023 |
| DOB NOW | Plumbing | Signed-off | All Pro Plumbing & Heating | 01/13/2023 |
| DOB NOW | Structural | Permit Issued | J&J Designs | 12/29/2022 |
| DOB NOW | Construction Fence | Signed-off | J&J Designs | 08/11/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/13/2023 | Signed-off | J&J Designs | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Heating Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×10 Delta Breeze SMT150 150 CFM · Exhaust Fan ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/13/2023 | Signed-off | All Pro Plumbing & Heating | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/22/2023 | Complete | Sunrun Solar Electl | — |
| 01/08/2023 | Complete | Ayyub Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/13/2023 | Signed-off | J&J Designs | Steel, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/13/2023 | Signed-off | J&J Designs | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/07/2023 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 07/26/2023 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 07/19/2023 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 07/06/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/20/2023 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 06/20/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/03/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/03/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 03/03/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 12/04/2023 | Fire-Resistant Penetrations and Joints | Walid Abdulla | special |
| 12/04/2023 | Air barrier - visual inspection | Walid Abdulla | energy_progress |
| 12/04/2023 | Final | Walid Abdulla | progress |
| 12/04/2023 | Energy Code Compliance Inspections | Walid Abdulla | progress |
| 12/04/2023 | Structural Stability – Alterations of existing buildings | Walid Abdulla | special |
| 06/22/2023 | Air barrier - visual inspection | CHRISTIAN LOZADA | energy_progress |
| 06/22/2023 | Structural Stability – Alterations of existing buildings | CHRISTIAN LOZADA | special |
| 06/22/2023 | Subsurface Investigations (Borings/Test Pits) | Rajasekhar Sakhamuri | special |
| 06/22/2023 | Concrete - Cast-In-Place | CHRISTIAN LOZADA | special |
| 06/22/2023 | Structural Steel - Details | CHRISTIAN LOZADA | special |
| 06/22/2023 | Mechanical Systems | CHRISTIAN LOZADA | special |
| 06/22/2023 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 06/22/2023 | Structural Steel - High Strength Bolting | CHRISTIAN LOZADA | special |
| 06/22/2023 | Heating Systems | CHRISTIAN LOZADA | special |
| 06/22/2023 | Masonry | CHRISTIAN LOZADA | special |
| 06/22/2023 | Subgrade Inspections | CHRISTIAN LOZADA | special |
| 06/22/2023 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 06/22/2023 | Excavations - Sheeting, Shoring, and Bracing | CHRISTIAN LOZADA | special |
| 06/22/2023 | Final | CHRISTIAN LOZADA | progress |
| 06/22/2023 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 06/22/2023 | Footing and Foundation | CHRISTIAN LOZADA | progress |
| 06/22/2023 | Structural Wood Frame | CHRISTIAN LOZADA | progress |
| 06/22/2023 | Fire-Resistance Rated Construction | CHRISTIAN LOZADA | progress |
| 06/22/2023 | Ventilation and air distribution system | CHRISTIAN LOZADA | energy_progress |
| 06/22/2023 | Interior lighting power | CHRISTIAN LOZADA | energy_progress |