← Back
BuildNYC
Predominantly retail with other uses
166-17 NORTHERN BOULEVARD
QUEENS · BIN 4567659
💬 Discuss this project
2015Year Built
2Stories
K4Building Class
R2Zoning
3,516 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Predominantly retail with other uses · 3,547 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Construction SE Woodpoint103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf105/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Danico Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Icm Global DesignGeneral Contractor303/21/2026
MRMD NYGeneral Contractor303/21/2026
Steel Tone ConstructionGeneral Contractor203/21/2026
QMB Plumbing & HeatingPlumbing103/21/2026
Gul & G ContractingScaffold107/08/2026
R & L Construction & PainGeneral Contractor109/21/2016
Woodpoint Construction SEGeneral Contractor411/19/2022
Building Lifecycle
12/09/2022
Observed a construction fence surrounding the project at exposures 1 & 4, upon researching the department of buildings data-base, i observed the…
ECB violation · closed
01/15/2021
Jobsite fence-@time of my inspection @a 2STORY new bldg under construction,i observed jobsite fence in place.upon research on BIS,the fence…
ECB violation · closed
12/30/2020
Failure to safeguard all persons and property affected by constructionoperations. At the time of inspection it was observed that the const fence at…
ECB violation · closed
07/18/2019
Signed off — Alteration
INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILIDNG CODE.
Q00167013-I1
05/17/2019
Filed — Alteration
INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILIDNG CODE.
Q00167013-I1
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Gul & G Contracting—
BIS—Steel Tone Construction—
BIS—Steel Tone Construction—
BIS—QMB Plumbing & Heating—
BIS—Woodpoint Construction SE—
BIS—Woodpoint Construction SE—
BIS—QMB Plumbing & Heating—
BIS—Woodpoint Construction SE—
BIS—Woodpoint Construction SE—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—QMB Plumbing & Heating—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—Icm Global Design—
BIS—R & L Construction & Painting—
BIS—MRMD NY—
BIS—MRMD NY—
BIS—MRMD NY—
BIS—MRMD NY—
BIS—MRMD NY—
BIS—MRMD NY—
Nothing on file for this building.
Nothing on file for this building.
167 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account