166-19 16 AVENUE
QUEENS · BIN 4128713
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3XZoning
2,263 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Architecture
Floor 215p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2022$1.9M—— → —$846/sf building
07/09/2021$960K—Private party → Private party$424/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT503/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNASTY CONTRACTING LLCGeneral Contractor507/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513403/16/2022
Building Lifecycle
All (53)Filed (5)Permit Issued (4)Signed Off (2)Inspection (6)Objection (6)Special Inspection (30)
03/28/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/11/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/04/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/31/2022
Signed off — Alteration
PLUMBING WORK OF 2-FAMILY BUILDING IN CONJUNCTION WITH JOB# Q00584001. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00583955-I1
03/16/2022
Filed — Alteration CO
PROPOSE VERTICAL EXTENSION TO EXIST. BUILDING, CONVERT 1-FAMILY TO 2-FAMILY DWELLINGS. AND TO OBTAIN NEW C OF O.
Q00584001-P2
03/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
03/16/2022
Special inspection requirement — Interior lighting power
DEZHANG FANG
03/16/2022
Special inspection requirement — Metering
DEZHANG FANG
03/16/2022
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
03/16/2022
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
03/16/2022
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
03/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/16/2022
Special inspection requirement — Masonry
DEZHANG FANG
03/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
03/16/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
03/16/2022
Special inspection requirement — Final
DEZHANG FANG
03/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
03/16/2022
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
03/16/2022
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
03/16/2022
Special inspection requirement — Fenestration areas
DEZHANG FANG
03/16/2022
Special inspection requirement — Maintenance information
DEZHANG FANG
03/08/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/16/2022
Filed — Alteration CO
PROPOSE VERTICAL EXTENSION TO EXIST. BUILDING, CONVERT 1-FAMILY TO 2-FAMILY DWELLINGS. AND TO OBTAIN NEW C OF O.
Q00584001-P1
02/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
02/16/2022
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
02/16/2022
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
02/16/2022
Special inspection requirement — Maintenance information
DEZHANG FANG
02/16/2022
Special inspection requirement — Fenestration areas
DEZHANG FANG
02/16/2022
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
02/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/16/2022
Special inspection requirement — Masonry
DEZHANG FANG
02/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
02/16/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/16/2022
Special inspection requirement — Final
DEZHANG FANG
02/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
02/16/2022
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
02/16/2022
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
01/24/2022
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION.
Q00583969-I1
01/11/2022
Permit issued — General Construction
Q00584001-I1-GC-CX
12/20/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/20/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/22/2021
Permit issued — Plumbing
Q00583955-I1-PL
10/21/2021
Permit issued — General Construction
Q00584001-I1-GC-CX
10/12/2021
Permit issued — Construction Fence
Q00583969-I1-FN
10/01/2021
Filed — Alteration
PLUMBING WORK OF 2-FAMILY BUILDING IN CONJUNCTION WITH JOB# Q00584001. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00583955-I1
10/01/2021
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION.
Q00583969-I1
08/31/2021
Objection raised — Fire_Protection
08/31/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Zoning
08/31/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Admin
08/31/2021
Objection resolved — Addressed
08/26/2021
Filed — Alteration CO
PROPOSE VERTICAL EXTENSION TO EXIST. BUILDING, CONVERT 1-FAMILY TO 2-FAMILY DWELLINGS. AND TO OBTAIN NEW C OF O.
Q00584001-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDYNASTY CONTRACTING LLC01/11/2022
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC10/22/2021
DOB NOWGeneral ConstructionPermit IssuedDYNASTY CONTRACTING LLC10/21/2021
DOB NOWConstruction FenceSigned-offDYNASTY CONTRACTING LLC10/12/2021
1 project · most recent 03/26/2022
General Wiring
FiledStatusContractorScope
03/26/2022CompleteR & T ELECTRICAL CORPGeneral Wiring
1 project · most recent 03/16/2022
Wood
FiledStatusContractorScope
03/16/2022Permit IssuedDYNASTY CONTRACTING LLCWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/28/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/11/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/04/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/08/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/16/2022Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
03/16/2022Interior lighting powerDEZHANG FANGenergy_progress
03/16/2022MeteringDEZHANG FANGenergy_progress
03/16/2022Fenestration air leakageDEZHANG FANGenergy_progress
03/16/2022Air barrier - visual inspectionDEZHANG FANGenergy_progress
03/16/2022Concrete - Cast-In-PlaceDEZHANG FANGspecial
03/16/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
03/16/2022MasonryDEZHANG FANGspecial
03/16/2022Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
03/16/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
03/16/2022FinalDEZHANG FANGprogress
03/16/2022Fire-Resistance Rated ConstructionDEZHANG FANGprogress
03/16/2022Structural Wood FrameDEZHANG FANGprogress
03/16/2022Insulation placement and R valuesDEZHANG FANGenergy_progress
03/16/2022Fenestration areasDEZHANG FANGenergy_progress
03/16/2022Maintenance informationDEZHANG FANGenergy_progress
02/16/2022Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
02/16/2022Fenestration air leakageDEZHANG FANGenergy_progress
02/16/2022Air barrier - visual inspectionDEZHANG FANGenergy_progress
02/16/2022Maintenance informationDEZHANG FANGenergy_progress
02/16/2022Fenestration areasDEZHANG FANGenergy_progress
02/16/2022Concrete - Cast-In-PlaceDEZHANG FANGspecial
02/16/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/16/2022MasonryDEZHANG FANGspecial
02/16/2022Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
Latest 25 of 38.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00583955-I1Request digital key ↗
08/27/2026Q00583969-I1Request digital key ↗
08/26/2026Q00584001-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00584001-P1Open ↗
08/13/2026Q00584001-I1Open ↗
08/13/2026Q00584001-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00584001-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026Q00583955-I1Open ↗
08/31/2026Q00583955-I1Open ↗
08/27/2026Q00584001-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00583969-I1Open ↗
08/26/2026Q00584001-P2Open ↗
08/26/2026Q00584001-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026Q00583955-I1Open ↗
08/27/2026Q00584001-P1Open ↗
08/26/2026Q00584001-P2Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00584001-I1Open ↗
08/13/2026Q00584001-P2Open ↗
08/13/2026Q00584001-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00584001-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00584001-P2Open ↗
08/26/2026Q00584001-P1Open ↗
08/14/2026Q00584001-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00584001-I1Open ↗
08/13/2026Q00583955-I1Open ↗
▸Other Documents10
▸DOB NOWPlot Diagram3
08/13/2026Q00584001-P2Open ↗
08/13/2026Q00584001-I1Open ↗
08/13/2026Q00584001-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026Q00584001-P1Open ↗
08/26/2026Q00584001-P2Open ↗
08/14/2026Q00584001-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00584001-P2Open ↗
08/13/2026Q00584001-P1Open ↗
08/13/2026Q00584001-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00584001-I1Open ↗