166-24 20 AVENUE
QUEENS · BIN 4128970
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R2AZoning
1,127 sfGross Floor Area
1Units
Cape Cod · 4,100 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar11p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NMI ARCHITECTURE, PLLC607/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MIGLIORE RESTORATION603/21/2026
NMI ARCHITECTURE PLLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VENTURE HOME IMPROVEMENTGeneral Contractor507/08/2026
INNOVATION PLUMBING LLCPlumbing107/08/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NMI ARCHITECTURE, PLLC6825607/29/2025
Building Lifecycle
All (54)Filed (6)Permit Issued (5)Signed Off (2)Inspection (9)Objection (18)Special Inspection (14)
07/29/2025
Filed — Alteration CO
THIS PROJECT IS FILED FOR SOME COSMETIC REPAIR AT CELLAR, 1ST, & 2ND FL DUE TO FIRE & SMOKE DAMAGE, MINOR LAYOUT CHANGES at 1st floor, CHANGE THE SECOND LEVEL TO BE PART OF THE 1ST FLOOR, NO CHANGE OF USE, EGRESS OR OCCUPANCY .
Q00978810-P2
06/13/2025
Filed — Alteration CO
THIS PROJECT IS FILED FOR SOME COSMETIC REPAIR AT CELLAR, 1ST, & 2ND FL DUE TO FIRE & SMOKE DAMAGE, MINOR LAYOUT CHANGES at 1st floor, CHANGE THE SECOND LEVEL TO BE PART OF THE 1ST FLOOR, NO CHANGE OF USE, EGRESS OR OCCUPANCY .
Q00978810-P1
06/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/29/2024
Signed off — Alteration
THIS PROJECT IS FILED FOR SOME COSMETIC REPAIR AT CELLAR & 1ST FLR DUE TO FIRE & SMOKE DAMAGE, MINOR LAYOUT CHANGES, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00927285-I1
11/19/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
10/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
10/10/2024
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
10/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NASHAT IBRAHIM
10/10/2024
Special inspection requirement — Fenestration air leakage
NASHAT IBRAHIM
10/10/2024
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
10/10/2024
Special inspection requirement — Fenestration areas
NASHAT IBRAHIM
09/26/2024
Filed — Alteration
THIS PROJECT IS FILED FOR SOME COSMETIC REPAIR AT CELLAR & 1ST FLR DUE TO FIRE & SMOKE DAMAGE, MINOR LAYOUT CHANGES, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00927285-P1
09/24/2024
Signed off — Alteration
Filing this application in conjunction with application # Q00927285 for some cosmetic repair to the building after fire and smoke damage, no change of use, egress or occupancy
Q00927302-I1
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
09/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
09/16/2024
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
09/16/2024
Special inspection requirement — Fenestration areas
NASHAT IBRAHIM
09/16/2024
Special inspection requirement — Fenestration air leakage
NASHAT IBRAHIM
09/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NASHAT IBRAHIM
09/09/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2024
Permit issued — General Construction
Q00978810-I1-GC
06/03/2024
Permit issued — Plumbing
Q00927302-I1-PL
05/31/2024
Objection resolved — Addressed
05/10/2024
Objection raised — Scope
05/01/2024
Objection resolved — Addressed
04/16/2024
Objection resolved — Addressed
03/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/28/2024
Permit issued — General Construction
Q00927285-I1-GC
03/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2024
Permit issued — Plumbing
Q00927302-I1-PL
03/12/2024
Filed — Alteration
Filing this application in conjunction with application # Q00927285 for some cosmetic repair to the building after fire and smoke damage, no change of use, egress or occupancy
Q00927302-I1
02/07/2024
Objection raised — Accessibility
02/07/2024
Objection raised — Accessibility
01/17/2024
Filed — Alteration CO
THIS PROJECT IS FILED FOR SOME COSMETIC REPAIR AT CELLAR, 1ST, & 2ND FL DUE TO FIRE & SMOKE DAMAGE, MINOR LAYOUT CHANGES at 1st floor, CHANGE THE SECOND LEVEL TO BE PART OF THE 1ST FLOOR, NO CHANGE OF USE, EGRESS OR OCCUPANCY .
Q00978810-I1
01/09/2024
Permit issued — General Construction
Q00927285-I1-GC
12/22/2023
Objection resolved — Addressed
12/22/2023
Objection resolved — Addressed
11/24/2023
Objection resolved — Addressed
11/24/2023
Objection resolved — Addressed
11/24/2023
Objection resolved — Addressed
11/24/2023
Objection resolved — Addressed
11/09/2023
Objection raised — Admin
11/09/2023
Objection raised — Other
11/09/2023
Objection raised — Scope
11/09/2023
Objection raised — Scope
11/09/2023
Objection raised — Other
11/09/2023
Objection raised — Other
11/02/2023
Filed — Alteration
THIS PROJECT IS FILED FOR SOME COSMETIC REPAIR AT CELLAR & 1ST FLR DUE TO FIRE & SMOKE DAMAGE, MINOR LAYOUT CHANGES, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00927285-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedVENTURE HOME IMPROVEMENT06/26/2024
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING06/03/2024
DOB NOWGeneral ConstructionSigned-offVENTURE HOME IMPROVEMENT03/28/2024
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC03/15/2024
DOB NOWGeneral ConstructionSigned-offVENTURE HOME IMPROVEMENT01/09/2024
1 project · most recent 11/04/2024
General Wiring
FiledStatusContractorScope
11/04/2024CompleteCRESCO ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/09/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/10/2024Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
10/10/2024Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
10/10/2024Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
10/10/2024Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
10/10/2024Fenestration air leakageNASHAT IBRAHIMenergy_progress
10/10/2024Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
10/10/2024Fenestration areasNASHAT IBRAHIMenergy_progress
09/16/2024Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
09/16/2024Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
09/16/2024Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
09/16/2024Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
09/16/2024Fenestration areasNASHAT IBRAHIMenergy_progress
09/16/2024Fenestration air leakageNASHAT IBRAHIMenergy_progress
09/16/2024Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026Q00927285-I1Request digital key ↗
08/23/2026Q00927285-P1Request digital key ↗
08/23/2026Q00927302-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00978810-I1Open ↗
08/13/2026Q00978810-P1Open ↗
08/13/2026Q00978810-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00978810-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature12
08/28/2026Q00927285-I1Open ↗
08/28/2026Q00927285-I1Open ↗
08/28/2026Q00927285-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q00927285-I1Open ↗
08/23/2026Q00927285-P1Open ↗
08/20/2026Q00978810-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00927285-I1Open ↗
08/24/2026Q00927285-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026Q00927285-I1Open ↗
08/23/2026Q00927285-P1Open ↗
08/20/2026Q00978810-P2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents13
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00978810-P2Open ↗
08/13/2026Q00978810-P1Open ↗
08/13/2026Q00978810-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00978810-I1Open ↗
08/13/2026Q00978810-P1Open ↗
08/13/2026Q00978810-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00978810-P2Open ↗
08/13/2026Q00978810-I1Open ↗
08/13/2026Q00978810-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q00978810-P2Open ↗
08/20/2026Q00978810-P1Open ↗
08/20/2026Q00978810-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00978810-I1Open ↗