← Back
Elevator cooperative
166-25 POWELLS COVE BLVD
QUEENS · BIN 4103995
💬 Discuss this project
1956Year Built
20Stories
D4Building Class
R4Zoning
463,500 sfGross Floor Area
237Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Elevator cooperative · Owner of record: CRYDER HOUSE INC · 218,152 sf lot · 2.12 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 4 filings · 16 docs
CellarUnder Construction7p · 2 filings · 20 docs
Sub-BasementUnder Construction4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION2209/13/2026
NORTHROP GRUMMAN SYSTEMS CORP.503/22/2026
P CONSTULTING CORP103/22/2026
166-25 POWELLS COVE BLVD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERRITT ENGINEERING CONSULTANT DPC1203/21/2026
XINOS CONSTRUCTION803/21/2026
LEWSAN CONSULTING403/21/2026
CONSTRUCTION PERMIT SERVICES303/21/2026
CCM CONSULTING GROUP, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor1108/12/2026
ANGELO ANDREW INCPlumbing407/08/2026
A CELL COMMUNICATIONS INCGeneral Contractor403/21/2026
KMM TELECOMMUNICATIONSGeneral Contractor303/21/2026
L.E.C.INCGeneral Contractor203/21/2026
INDUSTRIAL COOLING TCH INGeneral Contractor207/08/2026
SKOWRONSKI JEFFElectrical103/21/2026
SPARANDERO, FRANKElectrical103/21/2026
ZACHARY, JElectrical103/21/2026
HEYDET, LOUISElectrical103/21/2026
FAST TRACK ELECTRIC CORPGeneral Contractor108/20/2026
WATCH HILL WIRELESS SOLUGeneral Contractor107/08/2026
JEFF SKOWRONSKIElectrical103/21/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
KONARZEWSKI, TADEUSZElectrical103/21/2026
JOSEPH ALOIAElectrical103/21/2026
RICHARD GRIMAElectrical103/21/2026
SAUBERMAN, ALVINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB DESIGN GROUP, LLC513105/26/2026
MOMENTUM DESIGN CONSULTAN9893103/16/2026
MERRITT ENGINEERING CONSU460603/16/2026
O'ROURKE ENGINEERING, LLC5873107/07/2025
DEAN MENDEZ ARCHITECT, P.8621105/10/2024
GREGORY V. PEROTTO, P.E.947208/24/2023
GBN ENGINEERING LLC4670202/21/2023
ELEVATED ENGINEERING PLLC3692205/12/2022
THE MTM DESIGN GROUP, LLC1319102/26/2021
Building Lifecycle
All (187)Filed (25)Permit Issued (25)Signed Off (9)Facade (FISP) (15)Violation (54)Inspection (10)Objection (26)Special Inspection (23)
08/18/2026
Permit issued — Antenna
Q01370337-I1-AN
08/14/2026
Objection resolved — Resolved
08/11/2026
Permit issued — Sidewalk Shed
Q01390859-I1-SH
07/28/2026
Objection raised — Other
07/17/2026
Filed — Alteration
OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01385028-P1
06/15/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Scope
05/29/2026
Permit issued — General Construction
Q01370444-I1-GC
05/27/2026
Permit issued — Suspended Scaffold
Q01385028-I1-SC
05/26/2026
Filed — Alteration
Q01370337-I1
05/20/2026
Objection resolved — Addressed
05/14/2026
Filed — Alteration
Q01390859-I1
05/14/2026
Permit issued — Sidewalk Shed
Q01390859-I1-SH
05/07/2026
Violation issued (HPD, closed)
A
04/16/2026
Objection raised — Other
04/10/2026
Permit issued — Mechanical Systems
Q01231966-I1-MS
04/09/2026
Filed — Alteration
OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01385028-I1
03/16/2026
Filed — Alteration
FACADE RESTORATION AT ALL ELEVATIONS, MASONRY REPLACEMENT ALONG W/WATERPROOFING INSTALLATION, CONCRETE REPAIRS, TRAFFIC COATING INSTALLATION AND MASONRY REPOINTING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01370444-I1
02/16/2026
Signed off — Alteration
Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes, chapter 33. No change in use, egress or occupancy.
Q00556914-I1
12/10/2025
Signed off — Alteration
Q01047757-I1
12/09/2025
Signed off — Alteration
INSTALL NEW SPRINKLER HEAD ABOVE DRYERS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL GAS WORK AND PLUMBING, INCLUDING WASHING MACHINES AND DRYERS INSTALLATION WAS PERFORMED UNDER DOBNOW APPLICATION Q00595353-I1.
Q00677834-I1
08/07/2025
Permit issued — Mechanical Systems
Q01231966-I1-MS
07/07/2025
Filed — Alteration
REPLACEMENT OF CHILLER FOR BUILDING MECHANICAL SYSTEM LOCATED IN CELLAR MECHANICAL ROOM.
Q01231966-I1
07/07/2025
Special inspection requirement — Maintenance information
BRIAN O'ROURKE
05/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN O'ROURKE
05/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN O'ROURKE
05/27/2025
Special inspection requirement — Mechanical Systems
BRIAN O'ROURKE
05/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
BRIAN O'ROURKE
05/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN O'ROURKE
05/27/2025
Special inspection requirement — Final
jamal taha
05/27/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN O'ROURKE
12/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
11/21/2024
Permit issued — Plumbing
Q00595353-I1-PL
10/22/2024
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01061313-I1
10/02/2024
Permit issued — Suspended Scaffold
Q01061315-P2-SC
09/25/2024
Filed — Alteration
Q01061315-P2
09/25/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/13/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
07/30/2024
Violation issued (ECB, closed)
Construction
07/30/2024
Violation issued (ECB, closed)
Construction
07/30/2024
Violation issued (ECB, closed)
Construction
07/15/2024
Permit issued — General Construction
Q01047757-I1-GC
06/10/2024
Permit issued — Suspended Scaffold
Q01061315-I1-SC
06/05/2024
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01061313-I1
06/05/2024
Filed — Alteration
Q01061315-I1
06/05/2024
Permit issued — Sidewalk Shed
Q01061313-I1-SH
05/10/2024
Filed — Alteration
Q01047757-I1
05/09/2024
Special inspection requirement — Fenestration air leakage
Christopher Krepcio
05/07/2024
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
05/07/2024
Special inspection requirement — Masonry
Christopher Krepcio
05/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
05/07/2024
Special inspection requirement — Final
Christopher Krepcio
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Krepcio
01/12/2024
Signed off — Alteration
Dish - Installation of new antennas with RRH units, GPS antenna, and equipment cabinet on the roof. Installation of related conduits and service room connection as per plan. All work is in compliance with TPPN 5/98. No change in use/egress/occupancy
Q00628937-I1
12/06/2023
Permit issued — Antenna
Q00628937-I1-AN
12/06/2023
Permit issued — Plumbing
Q00595353-I1-PL
09/14/2023
Filed — Alteration
INSTALL NEW SPRINKLER HEAD ABOVE DRYERS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL GAS WORK AND PLUMBING, INCLUDING WASHING MACHINES AND DRYERS INSTALLATION WAS PERFORMED UNDER DOBNOW APPLICATION Q00595353-I1.
Q00677834-P2
09/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Krepcio
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedFAST TRACK ELECTRIC CORP08/18/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP08/11/2026
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/29/2026
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP05/27/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP05/14/2026
DOB NOWMechanical SystemsPermit IssuedINDUSTRIAL COOLING TCH IN04/10/2026
DOB NOWMechanical SystemsPermit IssuedINDUSTRIAL COOLING TCH IN08/07/2025
DOB NOWPlumbingPermit IssuedANGELO ANDREW INC11/21/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP10/02/2024
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP07/15/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP06/10/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP06/05/2024
DOB NOWAntennaSigned-offA CELL COMMUNICATIONS INC12/06/2023
DOB NOWPlumbingPermit IssuedANGELO ANDREW INC12/06/2023
DOB NOWPlumbingSigned-offANGELO ANDREW INC04/20/2023
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP09/28/2022
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP08/29/2022
DOB NOWAntennaSigned-offKMM TELECOMMUNICATIONS08/18/2022
DOB NOWAntennaSigned-offA CELL COMMUNICATIONS INC04/13/2022
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH02/18/2022
DOB NOWPlumbingPermit IssuedANGELO ANDREW INC10/28/2021
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP09/22/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP07/14/2021
DOB NOWGeneral ConstructionSigned-offL.E.C.INC03/12/2021
DOB NOWAntennaPermit IssuedWATCH HILL WIRELESS SOLU08/13/2019
BISOTISSUEDXINOS CONSTRUCTION CORP03/09/2022
BISOTISSUEDXINOS CONSTRUCTION CORP03/08/2021
BISOTISSUEDXINOS CONSTRUCTION CORP11/04/2020
BISOTISSUEDGREEN INTERNATIONAL INC04/30/2018
BISEQISSUEDXINOS CONSTRUCTION CORP07/20/2017
BISMHISSUEDINDUSTRIAL COOLING TCH IN06/30/2017
BISOTISSUEDXINOS CONSTRUCTION CORP02/27/2017
BISOTISSUEDXINOS CONSTRUCTION CORP08/16/2016
BISEQISSUEDXINOS CONSTRUCTION CORP07/07/2016
BISEQISSUEDAMERICAN VENTILATION SERV07/19/2013
BISOTISSUEDAMERICAN VENTILATION SERV07/18/2013
BISPLISSUEDG.BASSOLINO PLUMBING LTD07/09/2013
BISFBISSUEDG.BASSOLINO PLUMBING LTD07/09/2013
BISMHISSUEDPRIME MECHANICAL CONTRACT04/15/2013
BISOTISSUEDMC FAR CONTRACTORS INC12/01/2011
+ 22 more permits on file
1 project · most recent 07/07/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2025Permit IssuedINDUSTRIAL COOLING TCH INAir Conditioning Systems
Cooling
Aermec WWM0500 159 tons · Chiller ×4
1 project · most recent 08/24/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/24/2023Permit IssuedANGELO ANDREW INCGas, Water/Sanitary
6 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteKURT EBINGER ELEC CONSTGeneral Wiring
04/23/2026Permit IssuedTOWER ELECTRIC INC.—
02/12/2025CompleteCY ELECTRICAL CORP.General Wiring
08/05/2024Permit IssuedTOWER ELECTRIC INC.—
10/14/2022Permit IssuedPOWERONE ELECT'L CONTRGGeneral Wiring
07/15/2021CompleteTOWER ELECTRIC INC.—
1 project · most recent 07/17/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/17/2026Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
09/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/13/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/07/2025Maintenance informationBRIAN O'ROURKEenergy_progress
05/27/2025HVAC-R and service water heating system controlsBRIAN O'ROURKEenergy_progress
05/27/2025HVAC-R and service water heating equipmentBRIAN O'ROURKEenergy_progress
05/27/2025Mechanical SystemsBRIAN O'ROURKEspecial
05/27/2025Tenant Protection Plan ComplianceBRIAN O'ROURKEspecial
05/27/2025HVAC-R and service water piping design and insulationBRIAN O'ROURKEenergy_progress
05/27/2025Finaljamal tahaprogress
05/27/2025Energy Code Compliance InspectionsBRIAN O'ROURKEprogress
05/09/2024Fenestration air leakageChristopher Krepcioenergy_progress
05/07/2024Air barrier - visual inspectionChristopher Krepcioenergy_progress
05/07/2024MasonryChristopher Krepciospecial
05/07/2024Tenant Protection Plan ComplianceDean Mendezspecial
05/07/2024FinalChristopher Krepcioprogress
05/07/2024Energy Code Compliance InspectionsChristopher Krepcioprogress
09/12/2023Fire-Resistant Penetrations and JointsChristopher Krepciospecial
08/25/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
08/25/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
08/22/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
08/22/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
10/24/2022Fire-Resistant Penetrations and JointsChristopher Krepciospecial
06/10/2021Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
06/10/2021FinalChristopher Krepcioprogress
06/10/2021MasonryChristopher Krepciospecial
▾Documents — 356 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch24
08/29/2026Q01370444-I1Request digital key ↗
08/27/2026Q00537883-I1Request digital key ↗
08/27/2026Q00556914-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00474704-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION25
09/03/2020440623274Open ↗
03/04/2020421755782Open ↗
03/23/2018421427600Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION22
11/04/2020440623274Open ↗
05/08/2018421427600Open ↗
08/01/2017440317729Open ↗
Showing 3 of 22 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION1
08/03/2017440424168Open ↗
▸DOB NOWFlood Zone Compliance1
08/13/2026Q00046163-I1Open ↗
▸DOB NOWFlood Zone Design Certification1
08/13/2026Q00046163-I1Open ↗
▸Seals & Professional Certifications99
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
03/04/2020421755782Open ↗
04/23/2019421486797Open ↗
03/27/2019421427600Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/29/2026Q01370444-I1Open ↗
08/27/2026Q00474704-I1Open ↗
08/26/2026Q00628937-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/25/2026Q01047757-I1Open ↗
09/02/2026Q00595353-P1Open ↗
09/01/2026Q01047757-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026Q00677834-P2Open ↗
09/02/2026Q00595353-P1Open ↗
09/01/2026Q01047757-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
07/17/2013420865852Open ↗
07/16/2013420859770Open ↗
04/18/2013420825281Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
07/17/2013420865852Open ↗
07/16/2013420859770Open ↗
04/18/2013420825281Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/03/2020440623274Open ↗
08/03/2017440424168Open ↗
07/21/2016440323357Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/03/2020440623274Open ↗
08/03/2017440424168Open ↗
07/21/2016440323357Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/03/2017440424168Open ↗
07/21/2016440323357Open ↗
07/06/2016440317729Open ↗
▸BISProfessional and Owner Certification (POC3)2
05/31/2017421486797Open ↗
05/31/2017421486797Open ↗
▸Trade Schedules & Equipment10
▸BISEQUIPMENT USE PERMITS3
05/06/2019421486797Open ↗
05/06/2019421486797Open ↗
07/08/2013420825281Open ↗
▸BISSCHEDULE B - PLUMBING3
08/03/2017440424168Open ↗
07/17/2013420865852Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
05/06/2019421486797Open ↗
07/08/2013420825281Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/17/2013420865852Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/21/2013420865852Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
03/04/2020421755782Open ↗
04/05/2018421427600Open ↗
05/31/2017421486797Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/29/2026Q01370444-I1Open ↗
08/27/2026Q00474704-I1Open ↗
08/26/2026Q00628937-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/03/2020440623274Open ↗
03/04/2020421755782Open ↗
03/02/2018421427600Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
09/23/2011420485004Open ↗
Showing 1 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/18/2013420825281Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/17/2013420865852Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/04/2020421755782Open ↗
04/23/2019421486797Open ↗
03/18/2019421427600Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
04/23/2019421486797Open ↗
03/18/2019421427600Open ↗
07/18/2017421245888Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/21/2022440623274Open ↗
09/03/2020440623274Open ↗
08/03/2017440424168Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/21/2022440623274Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/03/2017440424168Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
08/03/2017440424168Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00714873-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/21/2022440623274Open ↗
09/03/2020440623274Open ↗
09/03/2020440623274Open ↗
Showing 3 of 5 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/11/2020440623274Open ↗
▸Approvals, Objections & Sign-offs37
▸BISADMINISTRATIVE OBJECTIONS12
06/13/2016421245888Open ↗
07/16/2013420859770Open ↗
07/11/2013420865852Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
05/06/2019421486797Open ↗
03/27/2019421427600Open ↗
03/18/2019421427600Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
03/27/2019421427600Open ↗
03/18/2019421427600Open ↗
09/07/2017421245888Open ↗
Showing 3 of 10 on file for this type
▸BISFINAL1
01/21/2022440623274Open ↗
▸BISCCD1-Construction Code Determination1
10/13/2011420479440Open ↗
▸BISSHED LETTER1
08/01/2017440317729Open ↗
▸DOB NOWNYS DEC Tidal Wetlands Approval1
08/13/2026Q00046163-I1Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT24
09/03/2020440623274Open ↗
03/04/2020421755782Open ↗
04/23/2019421486797Open ↗
Showing 3 of 24 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
10/26/2011420479440Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/21/2022440623274Open ↗
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET14
03/04/2020421755782Open ↗
03/02/2018421427600Open ↗
05/31/2017421486797Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION7
07/07/2017421486797Open ↗
07/06/2017421486797Open ↗
07/06/2016440317729Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/03/2020440623274Open ↗
08/03/2017440424168Open ↗
07/21/2016440323357Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
01/31/2018440317729Open ↗
09/07/2017421245888Open ↗
▸Other Documents13
▸DOB NOWManufacturer's Specifications4
08/14/2026Q01385028-P1Open ↗
08/14/2026Q01385028-I1Open ↗
08/13/2026Q01061315-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/14/2026Q01385028-P1Open ↗
08/14/2026Q01385028-I1Open ↗
08/13/2026Q01061315-P2Open ↗
Showing 3 of 4 on file for this type
▸BISFEMA FORM (81-31): ELEVATION CERTIFICATE1
09/07/2017421245888Open ↗
▸DOB NOWLowest Floor Elevation Plan1
08/15/2026Q00046163-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00046163-I1Open ↗
▸DOB NOWNYS DEC Tidal Wetlands Map1
08/13/2026Q00046163-I1Open ↗
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/13/2026Q00046163-I1Open ↗