← Back
Two family frame
166 CLOVE ROAD
STATEN ISLAND · Port Richmond · BIN 5005487
💬 Discuss this project
1899Year Built
2.5Stories
B2Building Class
C8-1Zoning
2,962 sfGross Floor Area
2Units
11 Open Violations 8 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family frame · 5,311 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 10 docs
Cellar2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALBERT VITALEElectrical103/21/2026
CHARLES SCHMITTElectrical103/21/2026
ACCORD POWER INCGeneral Contractor104/09/2026
JZ CONSTRUCTION GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561109/12/2025
GREAT WALL CONSULTANT P.E5633104/20/2022
STREET CONSULTING ENGINEE4259110/14/2021
Building Lifecycle
All (36)Filed (3)Permit Issued (2)Signed Off (1)Violation (21)Objection (2)Special Inspection (7)
11/24/2025
Signed off — Alteration
Installation of 3.08 kw solar energy system. This is expansion system install. No change of occupancy, use or egress.
S01285667-I1
09/17/2025
Permit issued — Solar
S01285667-I1-SL
09/12/2025
Filed — Alteration
Installation of 3.08 kw solar energy system. This is expansion system install. No change of occupancy, use or egress.
S01285667-I1
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
09/11/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Malathi Ananthakrishnan
09/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
09/11/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
09/11/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
04/20/2022
Filed — Alteration
S00712854-I1
04/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
04/06/2022
Permit issued — General Construction
S00599372-I1-GC
11/30/2021
Objection raised — Scope
11/30/2021
Objection resolved — Addressed
11/10/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2021
Filed — Alteration
File to address ECB Violation #35482001Y, #35163264H, & #34424778L. Remove illegal partitions at cellar and restore back to legal condition. No change in use, egress, or occupancy.
S00599372-I1
08/14/2021
Violation issued (ECB, open)
Construction
05/17/2021
Violation issued (HPD, open)
I
05/04/2021
Violation issued (HPD, open)
B
05/04/2021
Violation issued (HPD, open)
B
04/16/2018
Violation issued (HPD, closed)
B
04/16/2018
Violation issued (HPD, closed)
B
04/16/2018
Violation issued (HPD, closed)
B
11/28/2016
Violation issued (ECB, open)
Construction
04/09/2007
Violation issued (HPD, open)
B
04/09/2007
Violation issued (HPD, open)
B
02/20/2007
Violation issued (HPD, open)
B
02/20/2007
Violation issued (HPD, open)
B
05/01/2006
Violation issued (ECB, open)
HPD
12/02/2004
Violation issued (ECB, closed)
HPD
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offACCORD POWER INC09/17/2025
DOB NOWGeneral ConstructionPermit IssuedJZ CONSTRUCTION GROUP INC04/06/2022
BISOTISSUEDACCORD POWER INC09/01/2022
2 projects · most recent 09/16/2025
FiledStatusContractorScope
09/16/2025CompleteACCORD POWER ELECTRIC LLC—
09/06/2022CompleteNEWGRANGE ELECTRIC, INC—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/11/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
09/11/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
09/11/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Malathi Ananthakrishnanspecial
09/11/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
09/11/2025FinalMalathi Ananthakrishnanprogress
09/11/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
04/20/2022Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026S00599372-I1Request digital key ↗
08/24/2026S00712854-I1Request digital key ↗
08/18/2026S01285667-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/31/2022540235609Open ↗
▸BISWORK PERMIT APPLICATION1
09/01/2022540235609Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026S00712854-I1Open ↗
08/23/2026S01285667-I1Open ↗
08/23/2026S01285667-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026S00599372-I1Open ↗
08/18/2026S01285667-I1Open ↗
08/13/2026S00712854-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S01285667-I1Open ↗
08/23/2026S01285667-I1Open ↗
08/23/2026S01285667-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/31/2022540235609Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/31/2022540235609Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/01/2022540235609Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026S00599372-I1Open ↗
08/18/2026S01285667-I1Open ↗
08/13/2026S00712854-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/31/2022540235609Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/17/2022540235609Open ↗
08/31/2022540235609Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/31/2022540235609Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/17/2022540235609Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
11/22/2022540235609Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/31/2022540235609Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/17/2022540235609Open ↗
08/31/2022540235609Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/22/2022540235609Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/22/2022540235609Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01285667-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/17/2022540235609Open ↗
08/31/2022540235609Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
08/31/2022540235609Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/31/2022540235609Open ↗