Elevator cooperative
166 SEELEY STREET
BROOKLYN · BIN 3122175
💬 Discuss this project
1938Year Built
6Stories
D4Building Class
R5BZoning
65,640 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized10 Open Violations 5 unresolved · 5 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · 15,000 sf lot · 4.38 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Roof6p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DSJ MANAGEMENT2208/29/2026
TOPLINE NYC CONTRACTING407/08/2026
T-MOBILE407/08/2026
NEXTEL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAYAS ENGINEERING PLLC102/26/2025
ASR ENGINEERING PC112/14/2023
GRANT ENGINEERING CONSULTANTS, LLC208/01/2023
SCHERER DESIGN GROUP205/13/2022
SYED ENGINEERING, P.C.110/07/2021
ASHRAF CORP109/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES403/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
DANICO SERVICES203/21/2026
SATO CONSTRUCTION1003/21/2026
ACA ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALLSTATE RENOVATION INCGeneral Contractor707/08/2026
KMM TELECOMMUNICATIONSGeneral Contractor603/21/2026
TOPLINE NYC INCGeneral Contractor507/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor207/08/2026
SATO CONSTRUCTION CO.INCGeneral Contractor208/21/2026
WATCH HILL WIRELESS SOLUGeneral Contractor107/08/2026
MAGALLANES, ROBERTOElectrical103/21/2026
CROCITTO, JR., WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MAYAS ENGINEERING PLLLC7252102/26/2025
GRANT ENGINEERING CONSULT3512208/01/2023
SCHERER DESIGN GROUP7921105/12/2022
BANGASH ASSOCIATES INC8488109/15/2021
Building Lifecycle
All (101)Filed (14)Permit Issued (15)Signed Off (2)Facade (FISP) (15)Violation (37)Inspection (3)Objection (6)Special Inspection (9)
08/20/2026
Permit issued — General Construction
B01173079-I1-GC
06/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JAMES NAPOLI
05/20/2026
Filed — Alteration
INITIAL CD5: FACADE REPAIRS, FISP INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCUPANCY. AMENDMENT: ADDING NEW DROPS LOCATION OPTIONS.
B01206582-P5
05/20/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JAMES NAPOLI
04/20/2026
Violation issued (ECB, open)
Local Law
03/11/2026
Permit issued — Suspended Scaffold
B01206582-I1-SC
03/10/2026
Filed — Alteration
INITIAL CD5: FACADE REPAIRS, FISP INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCUPANCY. AMENDMENT: ADDING NEW DROPS LOCATION OPTIONS.
B01206582-P4
02/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/02/2026
Objection resolved — Addressed
01/28/2026
Objection raised — Other
01/15/2026
Filed — Alteration
INITIAL CD5: FACADE REPAIRS, FISP INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCUPANCY. AMENDMENT: ADDING NEW DROPS LOCATION OPTIONS.
B01206582-P3
01/15/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JAMES NAPOLI
12/05/2025
Permit issued — Sidewalk Shed
B00976240-I1-SH
10/15/2025
Filed — Alteration
INITIAL CD5: FACADE REPAIRS, FISP INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCUPANCY. AMENDMENT: ADDING NEW DROPS LOCATION OPTIONS.
B01206582-P2
10/15/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JAMES NAPOLI
09/30/2025
Filed — Alteration
INITIAL CD5: FACADE REPAIRS, FISP INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCUPANCY. AMENDMENT: ADDING NEW DROPS LOCATION OPTIONS.
B01206582-P1
09/19/2025
Permit issued — General Construction
B01173079-I1-GC
04/10/2025
Permit issued — Suspended Scaffold
B01206582-I1-SC
04/07/2025
Filed — Alteration
INITIAL CD5: FACADE REPAIRS, FISP INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCUPANCY. AMENDMENT: ADDING NEW DROPS LOCATION OPTIONS.
B01206582-I1
03/07/2025
Signed off — Alteration
FACADE REPAIR WHICH INCLUDES PARAPET WALL REPLACEMENT AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
B00578366-I1
03/07/2025
Objection resolved — Addressed
03/05/2025
Objection raised — Scope
02/26/2025
Filed — Alteration
FACADE AND FISP REPAIRS
B01173079-I1
01/28/2025
Special inspection requirement — Final
Albert Mayas
01/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Albert Mayas
01/28/2025
Special inspection requirement — Masonry
Albert Mayas
12/19/2024
Permit issued — Sidewalk Shed
B00976240-I1-SH
11/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/23/2024
Violation issued (ECB, open)
Construction
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade report signed — UNSAFE
02/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2024
Violation issued (ECB, open)
Construction
02/15/2024
Cycle 9 facade inspection completed
01/10/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/28/2023
Cycle 9 facade report signed — SWARMP
12/15/2023
Permit issued — Sidewalk Shed
B00976240-I1-SH
12/14/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00976240-I1
11/29/2023
Violation issued (ECB, open)
Construction
11/28/2023
Cycle 9 facade inspection completed
10/17/2023
Violation issued (ECB, open)
Construction
08/18/2023
Signed off — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof and room on the ground floor. Interior conduits to remain. Initial installation approved under application #301178151
B00595470-I1
08/01/2023
Filed — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof and room on the ground floor. Interior conduits to remain. Initial installation approved under application #301178151
B00595470-P1
06/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2023
Permit issued — Sidewalk Shed
B00607656-I1-SH
03/22/2023
Cycle 9 facade report submitted
03/02/2023
Permit issued — General Construction
B00578366-I1-GC
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2022
Violation issued (HPD, closed)
I
09/21/2022
Permit issued — General Construction
B00605056-I1-GC
09/21/2022
Permit issued — Antenna
B00605049-I1-AN
05/13/2022
Filed — Alteration
B00605049-I1
05/12/2022
Filed — Alteration
B00605056-I1
03/18/2022
Permit issued — Antenna
B00595470-I1-AN
03/07/2022
Objection resolved — Addressed
02/14/2022
Objection raised — 2014-AN AC 28-104.7.1-Administ
02/04/2022
Filed — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof and room on the ground floor. Interior conduits to remain. Initial installation approved under application #301178151
B00595470-I1
01/07/2022
Permit issued — General Construction
B00578366-I1-GC
10/08/2021
Permit issued — Sidewalk Shed
B00607656-I1-SH
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSATO CONSTRUCTION CO.INC08/20/2026
DOB NOWSuspended ScaffoldPermit IssuedSATO CONSTRUCTION CO. INC03/11/2026
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC12/05/2025
DOB NOWGeneral ConstructionPermit IssuedSATO CONSTRUCTION CO.INC09/19/2025
DOB NOWSuspended ScaffoldPermit IssuedSATO CONSTRUCTION CO. INC04/10/2025
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC12/19/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC12/15/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING04/03/2023
DOB NOWGeneral ConstructionSigned-offALLSTATE RENOVATION INC03/02/2023
DOB NOWGeneral ConstructionPermit IssuedKMM TELECOMMUNICATIONS09/21/2022
DOB NOWAntennaPermit IssuedKMM TELECOMMUNICATIONS09/21/2022
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU03/18/2022
DOB NOWGeneral ConstructionSigned-offALLSTATE RENOVATION INC01/07/2022
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING10/08/2021
DOB NOWGeneral ConstructionSigned-offALLSTATE RENOVATION INC09/30/2021
BISPLISSUEDKATAN P & H INC03/07/2018
BISOTISSUEDSASCO CONSTRUCTION ENTER08/12/2016
BISOTISSUEDCEL TECH ELECTRIC INC07/25/2016
BISOTISSUEDTECH-NEL ELECTRIC, INC06/02/2014
BISOTISSUEDCEL TECH ELECTRIC INC01/13/2014
BISOTISSUEDVERTICAL SOLUTIONS INC02/28/2013
BISOTISSUEDN.P. CLASSIC CONSTR CORP11/21/2012
BISPLISSUEDNICE PLUMBING CORP11/21/2012
BISOTISSUEDODYSSIA GLOBAL COMM. CORP07/16/2012
BISOTISSUEDSASCO BUILDERS INC04/24/2012
BISOTISSUEDCOSTROTTA CONSTRUCT MG IN03/27/2012
BISPLISSUEDB B PLUMBING & HEATING CO11/29/2011
BISOTISSUEDTRANSCEND HOLDINGS INC11/01/2011
BISOTISSUEDALTIVA CORP06/09/2011
BISPLISSUEDPINNACLE PLBG & HTG CORP10/15/2004
BISOTISSUEDQUALITY GENERAL CONSTRUCTION07/27/2004
BISOTISSUEDDUN-RITE COMMUNICATIONS INC11/20/2003
BISOTISSUEDDUN-RITE COMMUNICATIONS INC09/22/2003
BISOTISSUEDARETE DEVELOPMENT INC07/11/2001
BISOTISSUEDQUALITY GENERAL CONSTRUCTION03/22/2000
4 projects · most recent 07/22/2026
General Wiring
FiledStatusContractorScope
07/22/2026Permit IssuedCNH ELECTRICAL CORPGeneral Wiring
12/18/2023Permit IssuedRICHARD NEU—
11/01/2023CompleteMAC ELECT'L CONTR. INC.General Wiring
10/12/2021Permit IssuedRICHARD NEU—
1 project · most recent 12/14/2023
Sidewalk Shed
FiledStatusContractorScope
12/14/2023Permit IssuedTOPLINE NYC INCSidewalk Shed
1 project · most recent 05/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/20/2026Permit IssuedSATO CONSTRUCTION CO. INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/01/2026Alternative Materials - OTCR Buildings Bulletin NumberJAMES NAPOLIspecial
05/20/2026Alternative Materials - OTCR Buildings Bulletin NumberJAMES NAPOLIspecial
01/15/2026Alternative Materials - OTCR Buildings Bulletin NumberJAMES NAPOLIspecial
10/15/2025Alternative Materials - OTCR Buildings Bulletin NumberJAMES NAPOLIspecial
01/28/2025FinalAlbert Mayasprogress
01/28/2025Tenant Protection Plan ComplianceAlbert Mayasspecial
01/28/2025MasonryAlbert Mayasspecial
09/14/2021Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
08/17/2021FinalFAZAL BANGASHprogress
▾Documents — 199 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/01/2026B00578366-I1Request digital key ↗
09/01/2026B00607656-I1Request digital key ↗
08/31/2026B00595470-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits28
▸BISWORK PERMIT APPLICATION15
03/08/2018321780925Open ↗
08/11/2016340406395Open ↗
08/01/2016320851761Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
02/27/2018321780925Open ↗
08/11/2016340406395Open ↗
06/30/2014320926566Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/10/2016320851761Open ↗
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
04/27/2018321780925Open ↗
02/27/2018321780925Open ↗
06/19/2017340406395Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00607656-I1Open ↗
08/29/2026B00605056-I1Open ↗
08/29/2026B00605049-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026B01206582-P5Open ↗
08/28/2026B01206582-P3Open ↗
08/28/2026B01206582-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/27/2018321780925Open ↗
04/27/2012320467721Open ↗
10/18/2011320378881Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/27/2018321780925Open ↗
08/11/2016340406395Open ↗
11/19/2012340024173Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/11/2016340406395Open ↗
11/19/2012340024173Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/11/2016340406395Open ↗
11/19/2012340024173Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/27/2012320467721Open ↗
10/18/2011320378881Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01173079-I1Open ↗
08/23/2026B00578366-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE5
03/22/2013340024173Open ↗
03/21/2013340024173Open ↗
03/01/2013340024173Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
11/19/2012340024173Open ↗
10/18/2011320378881Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/27/2018321780925Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
02/27/2018321780925Open ↗
09/01/2016320851761Open ↗
08/11/2016340406395Open ↗
▸Environmental & Asbestos17
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
02/27/2018321780925Open ↗
06/30/2014320926566Open ↗
06/14/2014320926566Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
04/27/2012320467721Open ↗
03/26/2012320451015Open ↗
04/28/2011320298897Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026B00605056-I1Open ↗
08/29/2026B00605049-I1Open ↗
08/13/2026B00595470-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/11/2016340406395Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
12/07/2013320851761Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
04/27/2018321780925Open ↗
02/27/2018321780925Open ↗
06/19/2017340406395Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/27/2018321780925Open ↗
06/19/2017340406395Open ↗
11/14/2014320926566Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
04/27/2012320467721Open ↗
03/26/2012320451015Open ↗
10/18/2011320378881Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/11/2016340406395Open ↗
11/19/2012340024173Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/11/2016340406395Open ↗
11/19/2012340024173Open ↗
▸BISNYCECC ANALYSIS1
08/11/2016340406395Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00595470-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/11/2016340406395Open ↗
11/19/2012340024173Open ↗
▸Approvals, Objections & Sign-offs15
▸BISADMINISTRATIVE OBJECTIONS8
06/14/2014320926566Open ↗
12/07/2013320851761Open ↗
11/19/2012340024173Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
04/27/2018321780925Open ↗
06/19/2017340406395Open ↗
01/15/2013320467721Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B01173079-I1Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
04/27/2018321780925Open ↗
02/27/2018321780925Open ↗
06/19/2017340406395Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
02/27/2018321780925Open ↗
06/30/2014320926566Open ↗
06/14/2014320926566Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION4
10/19/2016320851761Open ↗
03/24/2014320451015Open ↗
02/01/2014320451015Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/11/2016340406395Open ↗
11/19/2012340024173Open ↗
▸BISBOROUGH INTAKE FORM1
04/27/2018321780925Open ↗
▸Other Documents12
▸DOB NOWManufacturer's Specifications6
08/16/2026B01206582-P5Open ↗
08/13/2026B01206582-P2Open ↗
08/13/2026B01206582-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCalculations6
08/16/2026B01206582-P5Open ↗
08/13/2026B01206582-P4Open ↗
08/13/2026B01206582-I1Open ↗
Showing 3 of 6 on file for this type