2000Year Built
2Stories
A1Building Class
R3XZoning
2,092 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STAFFORDS ESTATES703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY201/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN AND CONSULTING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FICAZZOLA CONSULTING LLCGeneral Contractor203/21/2026
ANTONIO TZOUMASElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176201/30/2025
Building Lifecycle
All (17)Filed (2)Permit Issued (1)Signed Off (1)Violation (3)Special Inspection (10)
05/01/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01162439-I1
03/04/2025
Permit issued — Solar
S01162439-I1-SL
01/30/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01162439-P1
01/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
01/30/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
01/30/2025
Special inspection requirement — Final
James Clancy
01/30/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
01/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
01/29/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
01/29/2025
Special inspection requirement — Final
James Clancy
01/29/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
01/24/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01162439-I1
03/21/2006
Violation issued (ECB, closed)
Construction
01/15/2004
Violation issued (ECB, closed)
Construction
06/25/2001
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFICAZZOLA CONSULTING03/04/2025
BIS—ISSUEDSTAFFORD ESTATES11/16/2001
BISPLISSUEDD.M.T. PLBG & HTG CORP.06/20/2000
BISEQISSUEDSTAFFORD ESTATES04/04/2000
BIS—ISSUEDSTAFFORD ESTATES04/04/2000
BISEQISSUEDNO PROBLEM INC02/17/2000
BIS—ISSUEDNO PROBLEM INC02/17/2000
1 project · most recent 01/17/2025
FiledStatusContractorScope
01/17/2025CompleteAMBER ELECTL CONTNG INC—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/30/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
01/30/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
01/30/2025Energy Code Compliance InspectionsJames Clancyprogress
01/30/2025FinalJames Clancyprogress
01/30/2025Air barrier - visual inspectionJames Clancyenergy_progress
01/29/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
01/29/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
01/29/2025Energy Code Compliance InspectionsJames Clancyprogress
01/29/2025FinalJames Clancyprogress
01/29/2025Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S01162439-I1Request digital key ↗
08/20/2026S01162439-P1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/20/2026S01162439-P1Open ↗
09/20/2026S01162439-P1Open ↗
08/27/2026S01162439-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026S01162439-I1Open ↗
08/13/2026S01162439-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/20/2026S01162439-P1Open ↗
08/27/2026S01162439-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01162439-I1Open ↗