← Back
BuildNYC
Over six families without stores
1662 CROPSEY AVENUE
BROOKLYN · Bath Beach · BIN 3169337
💬 Discuss this project
1926Year Built
4Stories
C1Building Class
R5Zoning
42,720 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized57 Active Violations 55 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: Cropsey & 17th Properties · 17,420 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofT-Mobile antenna and equipment installation25p · 8 filings · 20 docs
Floor 4Proposed antenna installation14p · 1 filing · 11 docs
Floor 3Proposed antenna installation14p · 1 filing · 11 docs
Floor 2Proposed antenna installation14p · 1 filing · 11 docs
Floor 1Proposed antenna installation14p · 1 filing · 11 docs
Sub-BasementInstallation of wireless telecommunications equipment and an14p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
17th Cropsey Realty1303/21/2026
Cropsey & 17th Properties103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
French & Parrello Associates112/15/2025
Elevated Engineering109/06/2022
KMB Design Group103/31/2022
Grant512/23/2021
Com-EX Engineering of NY110/01/2020
NB&C106/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group603/21/2026
Construction Permit Services503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Overland ContractingGeneral Contractor807/08/2026
Agl DevelopmentGeneral Contractor303/21/2026
Allied TelecomGeneral Contractor303/21/2026
Crocitto, Jr., WilliamElectrical103/21/2026
Metro RF ServicesGeneral Contractor107/08/2026
Utell & Son Electrical ContElectrical103/22/2026
L.L.G. Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
French & Parrello Associates1271112/15/2025
Elevated Engineering3692609/06/2022
KMB Design Group513103/31/2022
Grant Engineering Consulting3512312/23/2021
Burtner Engineering Services5910106/12/2018
Building Lifecycle
09/21/2026
Signed off — Alteration
B01197437-I1
06/08/2026
Permit issued — Antenna
B01197437-I1-AN
03/25/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11D, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD violation · open
03/25/2026
§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIRCONDITIONER PROTRUDING…
HPD violation · open
12/26/2025
Boiler inspection report filed
Initial · no defects · Accepted
237 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offMetro RF Services06/08/2026
DOB NOWAntennaSigned-offOverland Contracting10/12/2022
DOB NOWAntennaSigned-offAgl Development05/06/2022
DOB NOWPlumbingSigned-offL.L.G. Plumbing & Heating08/04/2021
DOB NOWMechanical SystemsSigned-offOverland Contracting07/06/2021
DOB NOWGeneral ConstructionSigned-offOverland Contracting07/06/2021
DOB NOWAntennaSigned-offOverland Contracting04/20/2021
DOB NOWAntennaSigned-offAllied Telecom07/12/2018
BISOTISSUEDBechtel Infrastructure An06/24/2015
BISOTISSUEDSquan Construction Services06/08/2015
BISOTISSUEDSquan Construction Services09/20/2011
BISEQISSUEDBilly Cont06/23/2009
BISEQISSUEDBilly Cont06/19/2009
BISMHISSUEDOdyssia Global Commercial10/26/2005
BISOTISSUEDCosta Construction & Consulting04/15/2004
BISOTISSUEDCosta Construction & Consulting02/13/2004
BISOTISSUEDVantage Associates11/14/2001
BISMHISSUEDSteplin Construction02/23/2000
BISOTISSUEDSteplin Construction02/23/2000
BISOTISSUEDS M Construction Co10/29/1998
BISEQISSUEDS M Construction Co10/29/1998
4 projects · most recent 11/15/2022
General Wiring
FiledStatusContractorScope
11/15/2022Permit IssuedCiti-Wide ElectricGeneral Wiring
07/01/2022Permit IssuedDaven ElectricGeneral Wiring
08/22/2021Permit IssuedUtell & Son Electrical ContGeneral Wiring
10/09/2020Permit IssuedPLM ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/03/2022Fire-Resistant Penetrations and JointsFARID GHAEMIspecial
01/03/2022Post-installed AnchorsNICHOLAS BARILEspecial
12/08/2021Fire-Resistant Penetrations and JointsFARID GHAEMIspecial
12/08/2021Post-installed AnchorsNICHOLAS BARILEspecial
02/25/2021Mechanical SystemsNICHOLAS BARILEspecial
02/25/2021FinalFARID GHAEMIprogress
90 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account