← Back
Primarily 5-6 family with 1 store or office
1664 1 AVENUE
MANHATTAN · BIN 1050561
💬 Discuss this project
1910Year Built
4Stories
S5Building Class
R10AZoning
6,000 sfGross Floor Area
7Units
Rent Stabilized25 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: A&L GAUDIO 1664 LLC · 1,850 sf lot · 3.24 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING507/08/2026
AIS RENOVATIONS CORP.503/22/2026
A&L GAUDIO 1664 LLC103/22/2026
REIDYS FIRST AVE INC103/22/2026
1664 OPERATING903/21/2026
1664 OPERA303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2022$516K—G&G 1664 LLC → A&L GAUDIO 1664 LLC$86/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LONGTIN SOLUTIONS LLC106/14/2022
SYED ENGINEERING, P.C.208/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
BASIC GROUPS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
AIS RENOVATIONS CORPGeneral Contractor303/21/2026
Building Lifecycle
All (67)Filed (3)Permit Issued (3)Signed Off (3)Violation (57)Inspection (1)
04/29/2026
Violation issued (HPD, closed)
A
02/02/2026
Violation issued (HPD, open)
C
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
01/15/2026
Violation issued (FDNY_ORDER, closed)
12/08/2025
Violation issued (HPD, open)
B
12/08/2025
Violation issued (HPD, open)
C
12/08/2025
Violation issued (HPD, open)
B
12/08/2025
Violation issued (HPD, open)
B
12/08/2025
Violation issued (HPD, open)
C
11/17/2025
Violation issued (HPD, closed)
I
06/04/2025
Violation issued (HPD, closed)
A
09/26/2024
Violation issued (FDNY_ORDER, closed)
04/01/2024
Violation issued (HPD, closed)
A
11/28/2023
Violation issued (HPD, open)
C
11/28/2023
Violation issued (HPD, open)
B
11/28/2023
Violation issued (HPD, open)
C
11/28/2023
Violation issued (HPD, open)
B
11/15/2023
Violation issued (HPD, closed)
I
11/02/2023
Signed off — Alteration
M00754508-I1
10/30/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/15/2023
Violation issued (HPD, closed)
A
01/10/2023
Violation issued (HPD, open)
B
01/10/2023
Violation issued (HPD, open)
B
11/02/2022
Violation issued (HPD, closed)
I
06/22/2022
Permit issued — General Construction
M00754508-I1-GC
06/14/2022
Filed — Alteration
M00754508-I1
02/15/2022
Violation issued (HPD, closed)
A
12/07/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00564102-I1
12/07/2021
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00564103-I1
08/11/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00564103-I1
08/11/2021
Permit issued — Supported Scaffold
M00564103-I1-SF
07/26/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00564102-I1
07/26/2021
Permit issued — Sidewalk Shed
M00564102-I1-SH
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
09/20/2019
Violation issued (FDNY_ORDER, closed)
10/24/2016
Violation issued (HPD, closed)
I
04/04/2016
Violation issued (FDNY_ORDER, closed)
04/04/2016
Violation issued (FDNY_ORDER, closed)
10/19/2015
Violation issued (FDNY_ORDER, closed)
10/01/2015
Violation issued (HPD, closed)
I
01/14/2015
Violation issued (HPD, open)
B
01/14/2015
Violation issued (HPD, open)
C
01/14/2015
Violation issued (HPD, closed)
C
01/14/2015
Violation issued (HPD, open)
B
01/14/2015
Violation issued (HPD, open)
B
01/14/2015
Violation issued (HPD, closed)
A
01/14/2015
Violation issued (HPD, closed)
A
01/14/2015
Violation issued (HPD, open)
B
01/14/2015
Violation issued (HPD, open)
B
01/14/2015
Violation issued (HPD, open)
B
11/25/2013
Violation issued (FDNY_ORDER, closed)
06/21/2010
Violation issued (HPD, open)
B
06/21/2010
Violation issued (HPD, open)
B
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAIS RENOVATIONS CORP06/22/2022
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING08/11/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING07/26/2021
BISFPISSUEDSENTINEL FIRE CONTROL INC11/18/2011
BISPLISSUEDNEW PLBG & HTG CORP01/13/2003
BISOTISSUEDKMA CONSTRUCTION CORP01/08/2003
BISPLISSUEDNEW PLBG & HTG CORP10/26/2000
BISOTISSUED1664 OPERATING INC.10/26/2000
BISPLISSUEDNEW PLBG & HTG CORP03/23/2000
BISOTISSUED1664 OPERATING INC03/14/2000
BISPLISSUEDNEW PLBG & HTG CORP12/04/1998
BISOTISSUEDL & N CONSTRUCTION OF NY INC12/04/1998
BIS—ISSUEDDWYER CONSTRUCTION12/24/1996
BISFPISSUEDSENTINEL FIRE CONTROL INC06/11/1996
BISOTISSUEDDWYER CONSTRUCTION05/14/1996
BISEQISSUEDDWYER CONSTRUCTION05/14/1996
BISPLISSUEDNEW PLBG & HTG CORP04/22/1996
BISEQISSUEDDWYER CONSTRUCTION03/18/1996
BISMHISSUEDDWYER CONSTRUCTION03/18/1996
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/30/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/24/2021FinalRAFI HAMIDprogress
07/24/2021FinalRAFI HAMIDprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/03/2026M00564102-I1Request digital key ↗
09/02/2026M00754508-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/11/2011120831181Open ↗
▸BISWORK PERMIT APPLICATION1
11/21/2011120831181Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026M00754508-I1Open ↗
08/13/2026M00564103-I1Open ↗
08/13/2026M00564102-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/18/2026M00564103-I1Open ↗
08/23/2026M00564102-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/11/2011120831181Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
10/11/2011120831181Open ↗
10/11/2011120831181Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026M00754508-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
10/11/2011120831181Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/11/2011120831181Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/11/2011120831181Open ↗