Public elementary, junior or senior high
Robert E. Peary School
16-66 HANCOCK STREET · BIN 4085584
💬 Discuss this project
1973Year Built
3Stories
W1Building Class
M1-4DZoning
41,330 sfGross Floor Area
0Units
LL97 Covered2 Open Violations 1 unresolved · 1 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 46,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof12p · 2 filings · 20 docs
Floor 38p · 2 filings · 20 docs
Floor 28p · 2 filings · 20 docs
Floor 116p · 3 filings · 20 docs
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY5607/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPT OF EDUCATION PS 75903/22/2026
DOE P.S. 75 R. PERRY SCHO1303/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
DOE ROBERT E REAREY 0103/22/2026
DOE - PS 751803/22/2026
DEPARTMENT OF EDUCATION103/22/2026
DOE 040103/22/2026
DOE PS 75 040303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRECISION 3SIXTY NYC, INC5603/21/2026
DSENY ENGINEERING SERVICES2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEL-TECH CONSTRUCTION INCGeneral Contractor2307/08/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001601/24/2025
Building Lifecycle
All (195)Filed (39)Permit Issued (18)Signed Off (8)Violation (60)Inspection (4)Objection (36)Special Inspection (30)
06/02/2026
Signed off — Alteration
Structural for parapet work.
Q00694859-I1
06/02/2026
Signed off — Alteration
Structural for parapet work.
Q00694859-S5
06/02/2026
Signed off — Alteration
Structural for parapet work.
Q00694859-S3
06/02/2026
Signed off — Alteration
Structural for parapet work.
Q00694859-S1
05/26/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/08/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/10/2026
Permit issued — General Construction
Q00694859-S5-GC
03/04/2026
Special inspection requirement — Shutoff dampers
03/04/2026
Special inspection requirement — Electrical motors and elevators
01/15/2026
Objection raised — Other
01/14/2026
Objection raised — Other
01/14/2026
Objection raised — Other
01/14/2026
Objection raised — Other
01/13/2026
Objection raised — Other
12/30/2025
Filed — Alteration
FILLING EXISTING INTERIOR STEPPED ENTRANCE TO MATCH ELEVATION OF FIRST FLOOR. NEW EXTERIOR RAMP AND STEPS PROVIDED ALONG GRIDLINE H/ 4.5 TO 7. NEW CHAIR LIFT ADDED AT STAGE BY ASSEMBLY ROOM. SUMP PIT ADDED TO ELEVATOR PIT.
Q01333981-S5
12/29/2025
Filed — Alteration
FILLING EXISTING INTERIOR STEPPED ENTRANCE TO MATCH ELEVATION OF FIRST FLOOR. NEW EXTERIOR RAMP AND STEPS PROVIDED ALONG GRIDLINE H/ 4.5 TO 7. NEW CHAIR LIFT ADDED AT STAGE BY ASSEMBLY ROOM. SUMP PIT ADDED TO ELEVATOR PIT.
Q01333981-S2
12/29/2025
Filed — Alteration
FILLING EXISTING INTERIOR STEPPED ENTRANCE TO MATCH ELEVATION OF FIRST FLOOR. NEW EXTERIOR RAMP AND STEPS PROVIDED ALONG GRIDLINE H/ 4.5 TO 7. NEW CHAIR LIFT ADDED AT STAGE BY ASSEMBLY ROOM. SUMP PIT ADDED TO ELEVATOR PIT.
Q01333981-S6
12/29/2025
Filed — Alteration
FILLING EXISTING INTERIOR STEPPED ENTRANCE TO MATCH ELEVATION OF FIRST FLOOR. NEW EXTERIOR RAMP AND STEPS PROVIDED ALONG GRIDLINE H/ 4.5 TO 7. NEW CHAIR LIFT ADDED AT STAGE BY ASSEMBLY ROOM. SUMP PIT ADDED TO ELEVATOR PIT.
Q01333981-S3
12/18/2025
Filed — Alteration
FILLING EXISTING INTERIOR STEPPED ENTRANCE TO MATCH ELEVATION OF FIRST FLOOR. NEW EXTERIOR RAMP AND STEPS PROVIDED ALONG GRIDLINE H/ 4.5 TO 7. NEW CHAIR LIFT ADDED AT STAGE BY ASSEMBLY ROOM. SUMP PIT ADDED TO ELEVATOR PIT.
Q01333981-S1
12/18/2025
Filed — Alteration
FILLING EXISTING INTERIOR STEPPED ENTRANCE TO MATCH ELEVATION OF FIRST FLOOR. NEW EXTERIOR RAMP AND STEPS PROVIDED ALONG GRIDLINE H/ 4.5 TO 7. NEW CHAIR LIFT ADDED AT STAGE BY ASSEMBLY ROOM. SUMP PIT ADDED TO ELEVATOR PIT.
Q01333981-S4
12/18/2025
Filed — Alteration
FILLING EXISTING INTERIOR STEPPED ENTRANCE TO MATCH ELEVATION OF FIRST FLOOR. NEW EXTERIOR RAMP AND STEPS PROVIDED ALONG GRIDLINE H/ 4.5 TO 7. NEW CHAIR LIFT ADDED AT STAGE BY ASSEMBLY ROOM. SUMP PIT ADDED TO ELEVATOR PIT.
Q01333981-I1
12/17/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
12/17/2025
Special inspection requirement — Post-installed Anchors
12/17/2025
Special inspection requirement — Masonry
12/17/2025
Special inspection requirement — Subgrade Inspections
12/17/2025
Special inspection requirement — Concrete - Cast-In-Place
12/16/2025
Special inspection requirement — Fenestration air leakage
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
12/16/2025
Special inspection requirement — Maintenance information
12/16/2025
Special inspection requirement — Post-installed Anchors
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/15/2025
Special inspection requirement — Final
12/15/2025
Special inspection requirement — Mechanical Systems
12/15/2025
Special inspection requirement — Final
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
12/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/28/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/12/2025
Signed off — Alteration
SCH/PS75Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(CHUTE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED WITH DOB # Q00694859 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00897255-I1
08/12/2025
Signed off — Alteration
FN/PS75Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # Q00694859 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00769893-I1
08/12/2025
Signed off — Alteration
SF/PS75Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # Q00694859 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00769905-I1
08/12/2025
Signed off — Alteration
SH/PS75Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # Q00694859 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00769902-I1
07/25/2025
Permit issued — General Construction
Q00694859-I1-GC
07/25/2025
Permit issued — Plumbing
Q00694859-S3-PL
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
02/25/2025
Special inspection requirement — Masonry
NELSON LOPEZ
02/25/2025
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
02/25/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
02/25/2025
Special inspection requirement — Final
NELSON LOPEZ
02/25/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
02/25/2025
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
02/12/2025
Objection resolved — Addressed
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKEL-TECH CONSTRUCTION INC03/10/2026
DOB NOWGeneral ConstructionSigned-offKEL-TECH CONSTRUCTION INC07/25/2025
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC07/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offKEL-TECH CONSTRUCTION INC10/16/2024
DOB NOWConstruction FenceSigned-offKEL-TECH CONSTRUCTION INC09/04/2024
DOB NOWSupported ScaffoldSigned-offKEL-TECH CONSTRUCTION INC09/04/2024
DOB NOWSidewalk ShedSigned-offKEL-TECH CONSTRUCTION INC09/04/2024
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC05/08/2024
DOB NOWStructuralSigned-offKEL-TECH CONSTRUCTION INC12/12/2023
DOB NOWGeneral ConstructionSigned-offKEL-TECH CONSTRUCTION INC11/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offKEL-TECH CONSTRUCTION INC10/26/2023
DOB NOWSidewalk ShedSigned-offKEL-TECH CONSTRUCTION INC10/11/2023
DOB NOWSupported ScaffoldSigned-offKEL-TECH CONSTRUCTION INC10/06/2023
DOB NOWConstruction FenceSigned-offKEL-TECH CONSTRUCTION INC09/27/2023
DOB NOWGeneral ConstructionSigned-offKEL-TECH CONSTRUCTION INC11/29/2022
DOB NOWSupported ScaffoldSigned-offKEL-TECH CONSTRUCTION INC10/28/2022
DOB NOWSidewalk ShedSigned-offKEL-TECH CONSTRUCTION INC10/13/2022
DOB NOWConstruction FenceSigned-offKEL-TECH CONSTRUCTION INC09/26/2022
BISOTISSUEDMARIC PLUMBING & HEATING08/29/2018
BISMHISSUEDMARIC PLUMBING & HEATING08/29/2018
BISOTISSUEDMARIC PLUMBING & HEATING08/29/2018
BISOTISSUEDMARIC PLUMBING & HEATING08/29/2018
BISPLISSUEDMARIC PLBG & HTG INC08/29/2018
BISEQISSUEDMARIC PLUMBING & HEATING05/02/2018
BISMHISSUEDMARIC PLUMBING & HEATING10/03/2017
BISEQISSUEDMARIC PLUMBING & HEATING10/03/2017
BISPLISSUEDMARIC PLBG & HTG INC09/08/2017
BISOTISSUEDMARIC PLUMBING & HEATING09/06/2017
BISMHISSUEDMARIC PLUMBING & HEATING09/06/2017
BISOTISSUEDMARIC PLUMBING & HEATING09/06/2017
BISOTISSUEDMARIC PLUMBING & HEATING09/06/2017
BISPLISSUEDMARIC PLBG & HTG INC09/06/2017
BISEQISSUEDMARIC PLUMBING & HEATING04/28/2017
BISEQISSUEDMARIC PLUMBING & HEATING09/16/2016
BISFSISSUEDMARIC PLBG & HTG INC09/16/2016
BISOTISSUEDMARIC PLUMBING & HEATING09/09/2016
BISFBISSUEDMARIC PLBG & HTG INC09/09/2016
BISPLISSUEDMARIC PLBG & HTG INC09/09/2016
BISOTISSUEDMARIC PLUMBING & HEATING09/09/2016
BISOTISSUEDMARIC PLUMBING & HEATING09/09/2016
+ 26 more permits on file
1 project · most recent 01/24/2025
Storm Water/Sanitary
FiledStatusContractorScope
01/24/2025Signed-offVARSITY PLBG AND HTG INCStorm, Water/Sanitary
6 projects · most recent 11/14/2025
General Wiring
FiledStatusContractorScope
11/14/2025CompleteJ & T GENERAL CORP DBA1 meters
07/09/2025Permit IssuedEVEREST ELECTRIC CORPGeneral Wiring
06/25/2024CompleteANCO ELECTL CONTCTNG INC—
08/25/2023CompleteJ & T GENERAL CORP DBAGeneral Wiring
10/12/2022CompleteSTANCO SYSTEM ELEC'L CONT—
06/22/2022CompletePRINCE ELECTRIC CORP.—
2 projects · most recent 12/30/2025
Concrete Masonry
FiledStatusContractorScope
12/30/2025——Concrete, Masonry
01/24/2025Signed-offKEL-TECH CONSTRUCTION INCConcrete
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/26/2026Pass-Final General Construction Non-Directive 14PassView ↗
05/26/2026Pass-Final General Construction Non-Directive 14PassView ↗
10/28/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
03/23/2026Structural Stability – Alterations of existing buildings—special
03/11/2026HVAC-R and service water heating equipment—energy_progress
03/04/2026Shutoff dampers—energy_progress
03/04/2026Electrical motors and elevators—energy_progress
12/17/2025Concrete - Cast-In-Place—special
12/17/2025Subsurface Conditions – Fill Placement & In-Place Density—special
12/17/2025Subgrade Inspections—special
12/17/2025Post-installed Anchors—special
12/17/2025Masonry—special
12/16/2025Maintenance information—energy_progress
12/16/2025Energy Code Compliance Inspections—progress
12/16/2025Fire-Resistance Rated Construction—progress
12/16/2025Fire-Resistant Penetrations and Joints—special
12/16/2025Fenestration air leakage—energy_progress
12/16/2025HVAC-R and service water piping design and insulation—energy_progress
12/16/2025Fire-Resistant Penetrations and Joints—special
12/16/2025Post-installed Anchors—special
12/15/2025Final—progress
12/15/2025Energy Code Compliance Inspections—progress
12/15/2025Fenestration and door U-factor and product ratings—energy_progress
12/15/2025Mechanical Systems—special
12/15/2025Final—progress
02/25/2025Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
02/25/2025MasonryNELSON LOPEZspecial
02/25/2025FinalNELSON LOPEZprogress
Latest 25 of 80.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 75Education—
Project Q00769527 Alteration · Approved · 07/07/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 262 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch39
08/26/2026Q00694859-P8Request digital key ↗
08/26/2026Q00694859-S5Request digital key ↗
08/26/2026Q00694859-S2Request digital key ↗
Showing 3 of 39 on file for this type
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature41
08/26/2026Q00769893-I1Open ↗
08/26/2026Q00769893-P1Open ↗
08/25/2026Q00769527-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00694859-A5Open ↗
08/31/2026Q00694859-A2Open ↗
08/31/2026Q00694859-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026Q00694859-A5Open ↗
09/01/2026Q00769905-P3Open ↗
08/31/2026Q00694859-A2Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWNYCSCA - Approved Site Safety Plans10
08/15/2026Q00769893-I1Open ↗
08/13/2026Q00769902-P2Open ↗
08/13/2026Q00769905-P3Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026Q00694859-S5Open ↗
08/15/2026Q00694859-S1Open ↗
08/15/2026Q00694859-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/26/2026Q00694859-S5Open ↗
08/13/2026Q00694859-I1Open ↗
▸Approvals, Objections & Sign-offs92
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)41
08/26/2026Q00769893-P1Open ↗
08/15/2026Q00769893-I1Open ↗
08/13/2026Q00769893-P2Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter39
08/26/2026Q00769893-P1Open ↗
08/18/2026Q01333981-S6Open ↗
08/15/2026Q00769893-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026Q00694859-S3Open ↗
08/13/2026Q00694859-S1Open ↗
08/13/2026Q00694859-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026Q00694859-I1Open ↗
08/13/2026Q00694859-S5Open ↗
08/13/2026Q00694859-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents51
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal41
08/26/2026Q00769893-P1Open ↗
08/15/2026Q00769893-I1Open ↗
08/13/2026Q00694859-S5Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWNYCSCA Exhibit 27
08/26/2026Q00694859-S5Open ↗
08/15/2026Q00694859-S1Open ↗
08/15/2026Q00694859-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026Q01333981-S6Open ↗
Showing 1 of 3 on file for this type