← Back
Three families
1667 55 STREET
BROOKLYN · BIN 3130497
💬 Discuss this project
1930Year Built
2.5Stories
C0Building Class
R5Zoning
2,680 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Three families · 3,005 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction24p · 1 filing · 20 docs
Floor 3Under Construction22p · 1 filing · 20 docs
Floor 2Under Construction22p · 1 filing · 20 docs
Floor 1Under Construction22p · 1 filing · 20 docs
CellarUnder Construction12p · 1 filing · 20 docs
1 job · most recent 01/20/2026
Sprinkler System
FiledStatusContractorScope
01/20/2026Signed-offTARGET PIPING NY LLCSprinkler System
3 jobs · most recent 01/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/20/2026———
07/15/2025Signed-offB&B MECH PLBG & HTG LLCGas
06/09/2025Signed-offB&B MECH PLBG & HTG LLCStorm, Water/Sanitary
1 job · most recent 05/07/2025
General Wiring
FiledStatusContractorScope
05/07/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 job · most recent 01/20/2026
Steel
FiledStatusContractorScope
01/20/2026Permit IssuedOB HOME IMPROVEMENTS INCSteel
Building Lifecycle
All (127)Filed (12)Permit Issued (13)Signed Off (7)Violation (15)Inspection (12)Objection (38)Special Inspection (30)
07/15/2026
Signed off — Alteration
Plumbing work filed in conjunction with GC #B01099886-I1
B01156656-I1
07/15/2026
Signed off — Alteration
B01136782-I1
06/11/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR GAS WORK TYPE, INSTALLATION OF NEW GAS METERS
B01168232-I1
06/11/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
S.O.E. AND SPECIFICATIONS FILED IN CONJUNCTION WITH NEW BUILDING.
B01099886-S2
05/01/2026
Violation issued (HPD, open)
A
03/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/10/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/18/2026
Permit issued — Plumbing
B01156656-I1-PL
01/23/2026
Special inspection requirement — Sprinkler Systems
VIJAY KUMAR
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
01/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
S.O.E. AND SPECIFICATIONS FILED IN CONJUNCTION WITH NEW BUILDING.
B01099886-P1
01/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
01/12/2026
Special inspection requirement — Sprinkler Systems
VIJAY KUMAR
11/18/2025
Violation issued (HPD, open)
I
11/07/2025
Permit issued — General Construction
B01099886-I1-GC
11/03/2025
Permit issued — Construction Fence
B01136782-I1-FN
09/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR GAS WORK TYPE, INSTALLATION OF NEW GAS METERS
B01168232-P1
07/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2025
Permit issued — Plumbing
B01168232-I1-PL
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
06/09/2025
Filed — Alteration
Plumbing work filed in conjunction with GC #B01099886-I1
B01156656-P1
06/06/2025
Violation issued (HPD, open)
A
05/28/2025
Permit issued — Sprinklers
B01099886-S2-EW-SP
05/28/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/15/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
S.O.E. AND SPECIFICATIONS FILED IN CONJUNCTION WITH NEW BUILDING.
B01099886-S7
05/15/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
S.O.E. AND SPECIFICATIONS FILED IN CONJUNCTION WITH NEW BUILDING.
B01099886-S9
05/12/2025
Inspection — Pass-Final House Connection
Pass
View inspection ↗
05/05/2025
Permit issued — Plumbing
B22933561-I1-PL
03/27/2025
Violation issued (ECB, closed)
Construction
03/12/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
S.O.E. AND SPECIFICATIONS FILED IN CONJUNCTION WITH NEW BUILDING.
B01099886-S8
02/27/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/05/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR GAS WORK TYPE, INSTALLATION OF NEW GAS METERS
B01168232-I1
02/04/2025
Permit issued — Plumbing
B01156656-I1-PL
02/03/2025
Objection resolved — Addressed
01/31/2025
Permit issued — Foundation
B01099886-S7-FO
01/28/2025
Objection raised — Fire_Protection
01/22/2025
Objection raised — Fire_Protection
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Fire_Protection
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Fire_Protection
01/22/2025
Objection resolved — Addressed
01/20/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
S.O.E. AND SPECIFICATIONS FILED IN CONJUNCTION WITH NEW BUILDING.
B01099886-S2
12/31/2024
Objection resolved — Addressed
12/31/2024
Objection resolved — Addressed
12/31/2024
Objection resolved — Addressed
12/30/2024
Permit issued — Structural
B01099886-S6-ST
12/27/2024
Objection raised — Other
12/27/2024
Objection raised — Other
12/27/2024
Objection raised — Other
12/26/2024
Permit issued — Foundation
B01099886-S9-FO
12/24/2024
Filed — Alteration
Plumbing work filed in conjunction with GC #B01099886-I1
B01156656-I1
12/24/2024
Permit issued — Support of Excavation
B01099886-S8-SE
11/25/2024
Violation issued (HPD, open)
I
Latest 60 of 127 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/29/2023$2.4M—Private party → Private party$896/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EYAL LEVITT ARCHITECT PC201/20/2026
MSM ENGINEERING SERVICES, PLLC207/15/2025
MEY ASSOCIATES506/09/2025
ROBERT SIQECA PE311/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERETZ BUILDERS ASSISTANCE.2003/21/2026
MISTER EXPEDITER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OB HOME IMPROVEMENTS INCGeneral Contractor1207/08/2026
B&B MECH PLBG & HTG LLCPlumbing307/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
WATER WORKS PIPING INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AZ PROFESSIONAL ENGINEERI766701/20/2026
STRUCTURAL ENGINEERING &5699311/19/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedOB HOME IMPROVEMENTS INC11/07/2025
DOB NOWConstruction FenceSigned-offOB HOME IMPROVEMENTS INC11/03/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC06/17/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC05/28/2025
DOB NOWPlumbingSigned-offSUPERIOR PIPING&MECH CORP05/05/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC02/04/2025
DOB NOWFoundationSigned-offOB HOME IMPROVEMENTS INC01/31/2025
DOB NOWStructuralPermit IssuedOB HOME IMPROVEMENTS INC12/30/2024
DOB NOWFoundationSigned-offOB HOME IMPROVEMENTS INC12/26/2024
DOB NOWSupport of ExcavationSigned-offOB HOME IMPROVEMENTS INC12/24/2024
DOB NOWGeneral ConstructionPermit IssuedOB HOME IMPROVEMENTS INC11/15/2024
DOB NOWConstruction FenceSigned-offOB HOME IMPROVEMENTS INC11/08/2024
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2025Pass-Final PL - UndergroundPassView ↗
05/12/2025Pass-Final House ConnectionPassView ↗
02/27/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/23/2026Sprinkler SystemsVIJAY KUMARspecial
01/23/2026Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
01/12/2026Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
01/12/2026Sprinkler SystemsVIJAY KUMARspecial
06/10/2025Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
09/30/2024Structural Stability – Alterations of existing buildingsROBERT SIQECAspecial
09/30/2024Subgrade InspectionsROBERT SIQECAspecial
09/30/2024Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
09/30/2024FinalROBERT SIQECAprogress
09/30/2024Footing and FoundationROBERT SIQECAprogress
09/30/2024Structural Cold-Formed SteelVIJAY KUMARspecial
09/30/2024Structural Steel - DetailsVIJAY KUMARspecial
09/30/2024Structural Steel - High Strength BoltingVIJAY KUMARspecial
09/30/2024Structural Steel - WeldingVIJAY KUMARspecial
09/30/2024FinalROBERT SIQECAprogress
09/30/2024Post-installed AnchorsROBERT SIQECAspecial
09/30/2024Concrete - Cast-In-PlaceROBERT SIQECAspecial
08/21/2024Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
08/21/2024Energy Code Compliance InspectionsVIJAY KUMARprogress
08/21/2024Fire-Resistance Rated ConstructionVIJAY KUMARprogress
08/21/2024Air barrier — testing VIJAY KUMARenergy_progress
08/21/2024Insulation placement and R valuesVIJAY KUMARenergy_progress
08/21/2024Air barrier - visual inspectionVIJAY KUMARenergy_progress
08/21/2024Electric vehicle service equipment requirementsVIJAY KUMARenergy_progress
08/21/2024Fenestration and door U-factor and product ratingsVIJAY KUMARenergy_progress
Latest 25 of 33.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/23/2026B01136782-I1Request digital key ↗
08/21/2026B01156656-P1Request digital key ↗
08/21/2026B01156656-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits1
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/28/2025340915978Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01099886-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01099886-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01099886-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/23/2026B01136782-I1Open ↗
08/21/2026B01156656-P1Open ↗
08/21/2026B01156656-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B01099886-S6Open ↗
09/20/2026B01156656-I1Open ↗
09/01/2026B01099886-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B01099886-S6Open ↗
08/28/2026B01099886-S7Open ↗
08/23/2026B01099886-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01099886-I1Open ↗
▸Safety & Tenant Protection3
▸BISBPP: STREET TREES SITE PLAN1
02/20/2025340915978Open ↗
▸BISSTREET TREE CHECKLIST1
02/28/2025340915978Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01099886-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/21/2026B01156656-P1Open ↗
08/21/2026B01156656-I1Open ↗
08/21/2026B01168232-I1Open ↗
Showing 3 of 11 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026B01099886-S9Open ↗
08/13/2026B01099886-S7Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01099886-S9Open ↗
08/13/2026B01099886-S7Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026B01099886-S9Open ↗
08/13/2026B01099886-S8Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
02/20/2025340915978Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/20/2025340915978Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION2
02/28/2025340915978Open ↗
02/20/2025340915978Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01099886-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01099886-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01099886-S8Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026B01099886-I1Open ↗