← Back
Zoned residential, not Manhattan
167-05 145TH DRIVE
QUEENS · BIN 4625023
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3-2Zoning
0 sfGross Floor Area
0Units
Rent Stabilized
Zoned residential, not Manhattan · Owner of record: 145-39 167TH LLC · 3,551 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof3p · 1 filing · 3 docs
Floor 210p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2025$1.3M—145-39 167TH LLC → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR101/08/2026
BFS ARCHITECT PC610/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAJ EMR LLCGeneral Contractor504/09/2026
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475101/08/2026
BFS ARCHITECT PC7477410/10/2025
IP CONCRETE TESTING AND I6252410/10/2025
Building Lifecycle
All (80)Filed (7)Permit Issued (5)Signed Off (4)Inspection (8)Objection (26)Special Inspection (30)
03/25/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
Q01344299-I1
03/23/2026
Permit issued — Solar
Q01344299-I1-SL
02/24/2026
Objection resolved — Addressed
02/20/2026
Objection raised — Admin
01/29/2026
Objection resolved — Addressed
01/27/2026
Objection raised — Electrical
01/08/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
Q01344299-I1
10/10/2025
Filed — New Building
PROPOSED 2 STORY; 2 FAMILY NEW BUILDING
Q01039613-P2
10/10/2025
Special inspection requirement — Permanent certificate
Belal Salim
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Belal Salim
10/10/2025
Special inspection requirement — Interior lighting power
Belal Salim
10/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Belal Salim
10/10/2025
Special inspection requirement — Air barrier - visual inspection
Belal Salim
10/10/2025
Special inspection requirement — Mechanical Systems
Belal Salim
10/10/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
INDARDEO PARBHUNATH
10/10/2025
Special inspection requirement — Footing and Foundation
Belal Salim
10/10/2025
Special inspection requirement — Fenestration areas
Belal Salim
10/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Belal Salim
10/10/2025
Special inspection requirement — Electric vehicle service equipment requirements
Belal Salim
10/10/2025
Special inspection requirement — Insulation placement and R values
Belal Salim
10/10/2025
Special inspection requirement — Fenestration air leakage
Belal Salim
10/10/2025
Special inspection requirement — Heating Systems
Belal Salim
10/10/2025
Special inspection requirement — Masonry
Belal Salim
10/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Belal Salim
10/10/2025
Special inspection requirement — Subgrade Inspections
Belal Salim
10/10/2025
Special inspection requirement — Final
Belal Salim
10/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Belal Salim
10/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Belal Salim
10/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Belal Salim
10/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Belal Salim
10/10/2025
Special inspection requirement — Metering
Belal Salim
10/10/2025
Special inspection requirement — Ventilation and air distribution system
Belal Salim
10/10/2025
Special inspection requirement — Air barrier — testing
Belal Salim
10/10/2025
Special inspection requirement — Maintenance information
Belal Salim
10/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Belal Salim
09/17/2025
Signed off — New Building
PROPOSED 2 STORY; 2 FAMILY NEW BUILDING
Q01039613-S1
09/09/2025
Signed off — New Building
PROPOSED 2 STORY; 2 FAMILY NEW BUILDING
Q01039613-S3
09/09/2025
Signed off — New Building
PROPOSED 2 STORY; 2 FAMILY NEW BUILDING
Q01039613-S2
09/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/24/2025
Filed — New Building
PROPOSED 2 STORY; 2 FAMILY NEW BUILDING
Q01039613-P1
07/22/2025
Special inspection requirement — Electric vehicle service equipment requirements
Belal Salim
07/22/2025
Special inspection requirement — Ventilation and air distribution system
Belal Salim
06/25/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/20/2025
Permit issued — Curb Cut
Q01039613-S2-CC
01/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/23/2024
Permit issued — Plumbing
Q01039613-S1-PL
11/20/2024
Permit issued — General Construction
Q01039613-I1-GC-CX
11/18/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
10/16/2024
Objection resolved — Addressed
07/09/2024
Objection resolved — Addressed
07/09/2024
Objection resolved — Addressed
06/28/2024
Objection raised — Other
06/25/2024
Permit issued — Construction Fence
Q01039613-S3-FN
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY03/23/2026
DOB NOWCurb CutSigned-offDAJ EMR LLC05/20/2025
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC12/23/2024
DOB NOWGeneral ConstructionPermit IssuedDAJ EMR LLC11/20/2024
DOB NOWConstruction FenceSigned-offDAJ EMR LLC06/25/2024
1 project · most recent 10/10/2025
Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/10/2025Signed-offDAJ EMR LLCOthers, Ventilation Systems
Ventilation
Delta SLM501 50 CFM ×9
Air King ES248ADA 150 CFM · Kitchen Exhaust ×6
Other
Fujitsu AOUG36LMAS1 3 tons · Condensing Unit ×3
AOUG48LMAS1 4 tons · Condensing Unit ×3
2 projects · most recent 12/11/2025
General Wiring
FiledStatusContractorScope
12/11/2025CompleteBERGER QUALITY ELEC'L CON—
02/01/2025CompleteAYYUB ELECTRIC CORPGeneral Wiring
1 project · most recent 10/10/2025
FiledStatusContractorScope
10/10/2025Signed-offDAJ EMR LLC5 scope_items
1 project · most recent 10/10/2025
Earthwork
FiledStatusContractorScope
10/10/2025Signed-offDAJ EMR LLCEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/10/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
10/10/2025Concrete - Cast-In-PlaceBelal Salimspecial
10/10/2025Fire-Resistant Penetrations and JointsBelal Salimspecial
10/10/2025Heating SystemsBelal Salimspecial
10/10/2025MasonryBelal Salimspecial
10/10/2025Mechanical SystemsBelal Salimspecial
10/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBelal Salimspecial
10/10/2025Subgrade InspectionsBelal Salimspecial
10/10/2025Subsurface Conditions – Fill Placement & In-Place DensityINDARDEO PARBHUNATHspecial
10/10/2025Energy Code Compliance InspectionsBelal Salimprogress
10/10/2025FinalBelal Salimprogress
10/10/2025Fire-Resistance Rated ConstructionBelal Salimprogress
10/10/2025Footing and FoundationBelal Salimprogress
10/10/2025Duct leakage testing, insulation and designBelal Salimenergy_progress
10/10/2025HVAC-R and service water heating system controlsBelal Salimenergy_progress
10/10/2025Fenestration areasBelal Salimenergy_progress
10/10/2025Interior lighting powerBelal Salimenergy_progress
10/10/2025Permanent certificateBelal Salimenergy_progress
10/10/2025Fenestration and door U-factor and product ratingsBelal Salimenergy_progress
10/10/2025MeteringBelal Salimenergy_progress
10/10/2025HVAC-R and service water heating equipmentBelal Salimenergy_progress
10/10/2025Ventilation and air distribution systemBelal Salimenergy_progress
10/10/2025Air barrier — testing Belal Salimenergy_progress
10/10/2025Electric vehicle service equipment requirementsBelal Salimenergy_progress
10/10/2025HVAC-R and service water piping design and insulationBelal Salimenergy_progress
10/10/2025Maintenance informationBelal Salimenergy_progress
Latest 25 of 67.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026Q01039613-P2Request digital key ↗
08/22/2026Q01039613-P1Request digital key ↗
08/22/2026Q01039613-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
10/02/2025440821461Open ↗
07/31/2025440821461Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
09/22/2025440821461Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/02/2025440821461Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/22/2025440821461Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/22/2026Q01039613-I1Open ↗
08/13/2026Q01039613-P2Open ↗
08/13/2026Q01039613-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/22/2026Q01039613-P1Open ↗
08/22/2026Q01039613-I1Open ↗
08/13/2026Q01039613-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01039613-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026Q01039613-P1Open ↗
09/02/2026Q01039613-P1Open ↗
09/01/2026Q01039613-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01039613-P1Open ↗
09/02/2026Q01039613-P1Open ↗
09/01/2026Q01039613-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01344299-I1Open ↗
08/13/2026Q01039613-S1Open ↗
08/13/2026Q01039613-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/10/2025440821461Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/02/2025440821461Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/22/2026Q01039613-I1Open ↗
08/13/2026Q01039613-P1Open ↗
08/13/2026Q01039613-P2Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist3
08/22/2026Q01039613-I1Open ↗
08/13/2026Q01039613-P2Open ↗
08/13/2026Q01039613-P1Open ↗
▸BISSTREET TREES SITE PLAN2
09/17/2025440821461Open ↗
09/17/2025440821461Open ↗
▸BISSTREET TREE CHECKLIST1
01/10/2025440821461Open ↗
▸BISSTREET TREE SIGNOFF1
09/17/2025440821461Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q01039613-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01039613-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01039613-I1Open ↗
▸Inspections & Test Reports2
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
09/22/2025440821461Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01039613-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/02/2025440821461Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01344299-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/02/2025440821461Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/10/2025440821461Open ↗
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION4
09/22/2025440821461Open ↗
09/22/2025440821461Open ↗
09/22/2025440821461Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/22/2026Q01039613-I1Open ↗
08/13/2026Q01039613-P2Open ↗
08/13/2026Q01039613-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/22/2026Q01039613-I1Open ↗
08/13/2026Q01039613-P2Open ↗
08/13/2026Q01039613-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026Q01039613-I1Open ↗
08/13/2026Q01039613-P1Open ↗
08/13/2026Q01039613-P2Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
09/22/2025440821461Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
10/02/2025440821461Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01039613-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01039613-I1Open ↗