2018Year Built
4Stories
K4Building Class
C4-4DZoning
13,358 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: HILLSIDE 5 PLAZA LLC · 4,200 sf lot · 3.18 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 4Under Construction12p · 2 filings · 20 docs
Floor 3
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction23p · 2 filings · 20 docs
CellarUnder Construction22p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BTU DELTA CONSTRUCTION3807/08/2026
PARSONS CONSTRUCTION607/08/2026
OWNER OF 167-14 HILLSIDE103/22/2026
Y J MANAGEMENT1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILD-TECH PROFESSIONALS CORP.903/21/2026
BTU DELTA CONSTRUCTION103/21/2026
EPAC BUILDING CONSULTING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BTU DELTA CONSTRUCTION *General Contractor1407/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor407/08/2026
ALL PRO PLBG & HTG INCPlumbing209/17/2026
DENNISON ELECTRIC CORPElectrical203/22/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
BLUEBUILD MGMT INCGeneral Contractor109/03/2026
BUILD TECH CONSTRUCTION CORP.General Contractor107/25/2026
KHAIKA CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILD-TECH CONSTRUCTION612612/15/2025
Building Lifecycle
All (98)Filed (13)Permit Issued (14)Signed Off (3)Violation (18)Inspection (7)Objection (13)Special Inspection (30)
09/16/2026
Permit issued — Plumbing
Q01008698-S4-PL
09/02/2026
Permit issued — General Construction
Q01008698-I1-GC
08/06/2026
Objection resolved — Resolved
08/06/2026
Objection resolved — Addressed
07/24/2026
Permit issued — General Construction
Q01008698-I1-GC
04/17/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TEOFILO INFANTE
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
TEOFILO INFANTE
04/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
TEOFILO INFANTE
04/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
TEOFILO INFANTE
04/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
TEOFILO INFANTE
01/26/2026
Objection raised — Other
01/26/2026
Objection raised — Other
01/26/2026
Objection raised — Other
01/26/2026
Objection raised — Other
01/08/2026
Objection resolved — Resolved
01/06/2026
Objection raised — Other
01/02/2026
Objection raised — Scope
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Zoning
01/02/2026
Objection raised — Scope
01/02/2026
Objection raised — Inspections
12/15/2025
Filed — Alteration
Interior build out for restaurant and market with take-out food.
Q01008698-S5
12/15/2025
Filed — Alteration
Interior build out for restaurant and market with take-out food.
Q01008698-P2
12/15/2025
Filed — Alteration
Interior build out for restaurant and market with take-out food.
Q01008698-P3
12/15/2025
Filed — Alteration
Interior build out for restaurant and market with take-out food.
Q01008698-S4
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TEOFILO INFANTE
12/15/2025
Special inspection requirement — Mechanical Systems
TEOFILO INFANTE
12/15/2025
Special inspection requirement — Post-installed Anchors
TEOFILO INFANTE
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
TEOFILO INFANTE
12/15/2025
Special inspection requirement — Final
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
TEOFILO INFANTE
12/15/2025
Special inspection requirement — Duct leakage testing, insulation and design
12/15/2025
Special inspection requirement — Shutoff dampers
12/15/2025
Special inspection requirement — Ventilation and air distribution system
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
TEOFILO INFANTE
12/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
TEOFILO INFANTE
12/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
TEOFILO INFANTE
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TEOFILO INFANTE
12/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
TEOFILO INFANTE
12/11/2025
Filed — Alteration
Interior build out for restaurant and market with take-out food.
Q01008698-P1
12/11/2025
Filed — Alteration
Interior build out for restaurant and market with take-out food.
Q01008698-S3
12/08/2025
Permit issued — Plumbing
Q01008698-S1-PL
11/10/2025
Special inspection requirement — Lighting controls
TEOFILO INFANTE
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TEOFILO INFANTE
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
TEOFILO INFANTE
11/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
TEOFILO INFANTE
11/10/2025
Special inspection requirement — Interior lighting power
TEOFILO INFANTE
11/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/03/2025
Special inspection requirement — Mechanical Systems
11/03/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/03/2025
Special inspection requirement — Final
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
09/22/2025
Violation issued (FDNY_NOV, closed)
09/17/2025
Permit issued — General Construction
Q01008698-I1-GC
05/28/2025
Violation issued (FDNY_NOV, closed)
05/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC09/16/2026
DOB NOWGeneral ConstructionPermit IssuedBLUEBUILD MGMT INC09/02/2026
DOB NOWGeneral ConstructionPermit IssuedBUILD TECH CONSTRUCTION CORP.07/24/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC12/08/2025
DOB NOWGeneral ConstructionPermit IssuedKHAIKA CONSTRUCTION INC09/17/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC05/16/2024
DOB NOWSupported ScaffoldSigned-offBTU DELTA CONSTRUCTION *04/13/2021
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC10/13/2020
DOB NOWSupported ScaffoldSigned-offBTU DELTA CONSTRUCTION *08/18/2020
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC11/26/2019
DOB NOWConstruction FenceSigned-offBTU DELTA CONSTRUCTION *07/17/2019
DOB NOWConstruction FenceSigned-offBTU DELTA CONSTRUCTION *04/05/2019
DOB NOWConstruction FenceSigned-offBTU DELTA CONSTRUCTION *02/07/2019
DOB NOWConstruction FenceSigned-offBTU DELTA CONSTRUCTION *05/04/2018
BIS—ISSUEDBTU DELTA CONSTRUCTION *03/31/2023
BIS—ISSUEDBTU DELTA CONSTRUCTION *03/25/2022
BISEQISSUEDBTU DELTA CONSTRUCTION *07/20/2021
BISPLISSUEDTRI STATE PLBG & HTG INC06/25/2021
BIS—ISSUEDBTU DELTA CONSTRUCTION *04/09/2021
BISEQISSUEDBTU DELTA CONSTRUCTION *08/30/2020
BIS—ISSUEDBTU DELTA CONSTRUCTION *06/03/2020
BIS—ISSUEDBTU DELTA CONSTRUCTION *04/06/2020
BISPLISSUEDTRI STATE PLBG & HTG INC11/29/2019
BISEQISSUEDBTU DELTA CONSTRUCTION *09/13/2019
BIS—ISSUEDBTU DELTA CONSTRUCTION *09/13/2019
BIS—ISSUEDBTU DELTA CONSTRUCTION *09/13/2019
BISOTISSUEDBTU DELTA CONSTRUCTION *09/03/2019
BISOTISSUEDBTU DELTA CONSTRUCTION *04/04/2018
BISOTISSUEDBTU DELTA CONSTRUCTION *02/14/2018
BISOTISSUEDBTU DELTA CONSTRUCTION *09/18/2017
2 projects · most recent 12/15/2025
Water/Sanitary Gas
FiledStatusContractorScope
12/15/2025Permit IssuedALL PRO PLBG & HTG INCGas, Water/Sanitary
05/12/2024Signed-offTRI STATE PLBG & HTG INCWater/Sanitary
10 projects · most recent 04/27/2026
General Wiring
FiledStatusContractorScope
04/27/2026Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
04/17/2024CompleteDENNISON ELECTRIC CORPGeneral Wiring
01/05/2024CompleteDENNISON ELECTRIC CORPGeneral Wiring
09/06/2023CompleteDENNISON ELECTRIC CORPGeneral Wiring
08/24/2022CompleteLINTECH ELECTRIC, INCGeneral Wiring
11/23/2020CompleteJAM ELECTRICAL CORP—
10/15/2020CompleteDENNISON ELECTRIC CORPGeneral Wiring
07/22/2020CancelledERIC & NG ELEC'L, INC.General Wiring
06/15/2020CompleteERIC & NG ELEC'L, INC.—
11/26/2019CompleteRICHARD NEU—
1 project · most recent 08/17/2020
Scaffold
FiledStatusContractorScope
08/17/2020Signed-offBTU DELTA CONSTRUCTION *Scaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
04/07/2026Fire-Resistant Penetrations and JointsTEOFILO INFANTEspecial
04/07/2026Energy Code Compliance InspectionsTEOFILO INFANTEprogress
04/07/2026HVAC-R and service water heating system controlsTEOFILO INFANTEenergy_progress
04/07/2026HVAC-R and service water heating equipmentTEOFILO INFANTEenergy_progress
04/07/2026HVAC-R and service water piping design and insulationTEOFILO INFANTEenergy_progress
12/15/2025Fire-Resistant Penetrations and JointsTEOFILO INFANTEspecial
12/15/2025Mechanical SystemsTEOFILO INFANTEspecial
12/15/2025Post-installed AnchorsTEOFILO INFANTEspecial
12/15/2025Energy Code Compliance InspectionsTEOFILO INFANTEprogress
12/15/2025Final—progress
12/15/2025Fire-Resistance Rated ConstructionTEOFILO INFANTEprogress
12/15/2025Duct leakage testing, insulation and design—energy_progress
12/15/2025Shutoff dampers—energy_progress
12/15/2025Ventilation and air distribution system—energy_progress
12/15/2025Energy Code Compliance InspectionsTEOFILO INFANTEprogress
12/15/2025HVAC-R and service water heating equipmentTEOFILO INFANTEenergy_progress
12/15/2025HVAC-R and service water piping design and insulationTEOFILO INFANTEenergy_progress
12/15/2025Fire-Resistant Penetrations and JointsTEOFILO INFANTEspecial
12/15/2025HVAC-R and service water heating system controlsTEOFILO INFANTEenergy_progress
11/10/2025Lighting controlsTEOFILO INFANTEenergy_progress
11/10/2025Fire-Resistant Penetrations and JointsTEOFILO INFANTEspecial
11/10/2025Energy Code Compliance InspectionsTEOFILO INFANTEprogress
11/10/2025Fire-Resistance Rated ConstructionTEOFILO INFANTEprogress
11/10/2025Interior lighting powerTEOFILO INFANTEenergy_progress
11/03/2025Fire-Resistance Rated Construction—progress
Latest 25 of 35.
▾Documents — 257 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
08/29/2026Q00039301-I1Request digital key ↗
08/22/2026Q01048071-I1Request digital key ↗
08/18/2026Q01008698-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/28/2026Q00365503-I1Request digital key ↗
08/28/2026Q00365503-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00271618-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION21
04/05/2024420653741Open ↗
11/28/2023421862443Open ↗
09/12/2023420653741Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION10
10/01/2020420653741Open ↗
12/05/2019420653741Open ↗
09/17/2019420653741Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
10/14/2021440380623Open ↗
09/27/2021440380623Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/12/2022420653741Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
04/29/2025420653741Open ↗
10/19/2017420653741Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/02/2017420653741Open ↗
▸BISZONING DIAGRAM1
04/15/2019420653741Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/02/2017420653741Open ↗
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature18
08/28/2026Q01008698-P1Open ↗
08/28/2026Q01008698-P1Open ↗
08/28/2026Q01008698-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00271618-I1Open ↗
08/18/2026Q01008698-S2Open ↗
08/18/2026Q01008698-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026Q01008698-P1Open ↗
08/26/2026Q01008698-P2Open ↗
08/24/2026Q01008698-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/17/2019420653741Open ↗
05/17/2019421862443Open ↗
02/09/2018421384843Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/17/2019421862443Open ↗
07/25/2017421384843Open ↗
03/27/2017421414696Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/17/2019421862443Open ↗
03/27/2017421414696Open ↗
10/25/2016421384843Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/13/2017440380623Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING8
09/12/2023420653741Open ↗
09/11/2023420653741Open ↗
08/31/2022420653741Open ↗
Showing 3 of 8 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
08/03/2019421918161Open ↗
08/03/2019421918161Open ↗
09/26/2017421384843Open ↗
Showing 3 of 4 on file for this type
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
05/21/2019420653741Open ↗
▸BISSPRINKLER SYSTEMS1
07/21/2022420653741Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
06/10/2025420653741Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/11/2019420653741Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
05/21/2019420653741Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
10/02/2017420653741Open ↗
▸BISSTREET TREE SIGNOFF1
04/29/2025420653741Open ↗
▸BISSTREET TREES SITE PLAN1
07/05/2024420653741Open ↗
▸Environmental & Asbestos14
▸DOB NOWOER: Notice to Proceed6
08/28/2026Q00271618-I1Open ↗
08/18/2026Q01008698-S4Open ↗
08/13/2026Q01008698-P1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
07/08/2021440380623Open ↗
06/14/2019421862443Open ↗
10/02/2017420653741Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q01008698-I1Open ↗
08/13/2026Q00365503-I1Open ↗
▸BISOER NNO-TCO1
07/10/2024420653741Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/25/2016421384843Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/24/2022420653741Open ↗
05/16/2022420653741Open ↗
11/03/2021420653741Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/17/2019420653741Open ↗
05/17/2019421862443Open ↗
09/26/2017421384843Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/20/2022420653741Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/15/2024420653741Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/21/2022420653741Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
10/09/2023420653741Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/20/2022420653741Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY10
06/11/2024420653741Open ↗
09/27/2022420653741Open ↗
05/16/2022420653741Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
08/19/2024420653741Open ↗
06/29/2020421384843Open ↗
06/01/2020421384843Open ↗
Showing 3 of 5 on file for this type
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)2
07/05/2024420653741Open ↗
07/05/2024420653741Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
09/17/2019420653741Open ↗
02/09/2018421384843Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/20/2022420653741Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/19/2017420653741Open ↗
▸BISSOIL REPORT1
11/03/2017420653741Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/03/2017420653741Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
10/19/2017420653741Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
04/29/2025420653741Open ↗
▸Approvals, Objections & Sign-offs23
▸BISLETTERS - SUPPORTING DOCUMENTATION12
09/27/2021440380623Open ↗
08/18/2021440380623Open ↗
07/08/2021440380623Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/08/2018420653741Open ↗
11/14/2018420653741Open ↗
10/27/2017420653741Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/29/2020421384843Open ↗
06/03/2020421384843Open ↗
08/05/2019421918161Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/27/2017421414696Open ↗
10/25/2016421384843Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/18/2023440380623Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
04/29/2025420653741Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
05/27/2020421384843Open ↗
05/17/2019421862443Open ↗
03/27/2017421414696Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/17/2019420653741Open ↗
08/03/2019421918161Open ↗
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION24
06/10/2025420653741Open ↗
06/10/2025420653741Open ↗
08/06/2024420653741Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING COVER SHEET6
06/14/2019421918161Open ↗
05/17/2019421862443Open ↗
01/26/2019420653741Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
10/01/2020420653741Open ↗
01/23/2018421384843Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/13/2017440380623Open ↗
▸Other Documents7
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
09/17/2019420653741Open ↗
08/03/2019421918161Open ↗
▸BISMAINTENANCE INFORMATION1
07/20/2022420653741Open ↗
▸BISBEST SQUAD - SUPPORTING DOCUMENTATION1
08/05/2019421918161Open ↗
▸BISPLOT DIAGRAM1
10/02/2017420653741Open ↗
▸BISMANUFACTURER SPECIFICATIONS FOR1
04/11/2019420653741Open ↗
▸BISSEISMIC ISOLATION SYSTEMS1
09/27/2022420653741Open ↗